www.pwc.com Ca lifornia ISO Aud it Results for the 20 13 Op era tiona l Com p lia nce Aud it Audit Committee Meeting General Session December 18-19, 2013 Agend a Background Overall Findings General Scope of Audit Detail Scope and


slide-1
SLIDE 1

Ca lifornia ISO Aud it Results for the 20 13 Op era tiona l Com p lia nce Aud it Audit Committee Meeting General Session December 18-19, 2013

www.pwc.com

slide-2
SLIDE 2

PwC

Agend a

Background Overall Findings General Scope of Audit Detail Scope and Findings Overview of Report Closing

December 2013 1 California Independent System Operator Audit Committee Presentation

slide-3
SLIDE 3

PwC

Op era tiona l Com p lia nce Aud it

Background

  • An operational audit is performed each year.
  • The 2013 audit covered the real-time scheduling function
  • Management determined the subject of the assessment
  • The scope/ subject varies in most years
  • Outreach to market in February, 2013
  • Audit committee briefed on the scope during May, 2013 meeting
  • PwC determined nature and extent of testing
  • Our report is an Audit/ Attestation opinion

California Independent System Operator Audit Committee Presentation 2 December 2013

slide-4
SLIDE 4

PwC

Op era tiona l Com p lia nce Aud it

Overall Findings

  • Over 2,000 transactions/ data points were audited
  • 100% compliance; no exceptions
  • An unqualified opinion was issued on December 6, 2013

California Independent System Operator Audit Committee Presentation 3 December 2013

slide-5
SLIDE 5

PwC

Op era tiona l Com p lia nce Aud it

General Scope of Audit

  • Assessment period
  • August 19 – 25, 2013
  • September 24 – 28, 2013
  • Specific Scope
  • Management Assertion covering identified Procedural Elements
  • Five primary Operating Procedures relate to real-time scheduling
  • All Operating Procedures are available on website
  • Ten specific Procedural Elements were identified from these OPs
  • Objective criteria

California Independent System Operator Audit Committee Presentation 4 December 2013

slide-6
SLIDE 6

PwC

Op era tiona l Com p lia nce Aud it

General Scope of Audit (continued)

  • The ISO’s real-time scheduling function
  • Conducted 24x7 at both Alhambra and Folsom control rooms
  • Six control room crews (operating teams) cover control room operations
  • Real-time scheduling actions/ functions are hourly, daily and real-time
  • Audit covered
  • On site observations (over 60 hours) and data inspections
  • Both Folsom and Alhambra control rooms
  • All clock hours
  • All days in week
  • Five of six shifts

California Independent System Operator Audit Committee Presentation 5 December 2013

slide-7
SLIDE 7

PwC

Op era tiona l Com p lia nce Aud it

Detailed Scope and Findings

California Independent System Operator Audit Committee Presentation 6 December 2013

Ref. No. Real-tim e Scheduling Operating Procedures Occurrences During 10 - Day Assessm ent Period Com pliance Assessm ent

1

Pre-Schedule and Check- Out Validation 10 daily actions; 240 hourly schedule sets; approx 2,600 data points No Exceptions

2

E-tag Curtailm ents Approx 20 occurrences No Exceptions

3

Check-out Before the Hourly Ram p 240 hours; approx 2,600 data points No Exceptions

4

Check-out After the Close

  • f Each Hour

240 hours; approx 2,600 data points No Exceptions

5

Final Daily Schedules and NAI Totals Com parison 10 days; 220 BA checkouts (110 NAI; 110 NSA) No Exceptions

slide-8
SLIDE 8

PwC

Op era tiona l Com p lia nce Aud it

Detailed Scope and Findings (continued)

California Independent System Operator Audit Committee Presentation 7 December 2013

Ref. No. Real-tim e Scheduling Operating Procedures Occurrences During 10 - Day Assessm ent Period Com pliance Assessm ent

6

Manual Pre-Dispatch of Interchange Transactions Approx 20 dispatches; approx 60 data points No Exceptions

7

Manual Dispatch Interchange Accounting Approx 20 dispatches; approx 160 data points No Exceptions

8

Interchange Schedule Curtailm ents - Before the Operating Hour Approx 20 curtailments No Exceptions

9

Interchange Schedule Curtailm ents - Current Operating Hour Zero No Occurrences

10

Unscheduled Flow – Path 66 Approx 10 mitigations; approx 30 data points No Exceptions

slide-9
SLIDE 9

PwC

Op era tiona l Com p lia nce Aud it

Overview of Report Report contents

  • PwC unqualified opinion regarding Management's Assertion
  • Management’s Assertion – Summary
  • Attachment I – Detail management assertion
  • 100% compliance with 9 elements
  • One element did not occur
  • Attachment II – process narrative – unaudited

Final thoughts for 2013 Audit

  • Report structure and level of assurance similar to prior years
  • Subject of audit – changed – first time for real-time scheduling
  • Observations – substantially more intrusive this year

California Independent System Operator Audit Committee Presentation 8 December 2013

slide-10
SLIDE 10

PwC

Op era tiona l Com p lia nce Aud it

Closing We appreciate ISO staff cooperation

  • Big effort - several months
  • Approximately 15 operators
  • Management and supervisors

Questions ?

California Independent System Operator Audit Committee Presentation 9 December 2013