www.pwc.com Ca lifornia ISO Aud it Results for the 20 13 Op era tiona l Com p lia nce Aud it Audit Committee Meeting General Session December 18-19, 2013 Agend a Background Overall Findings General Scope of Audit Detail Scope and


  1. www.pwc.com Ca lifornia ISO Aud it Results for the 20 13 Op era tiona l Com p lia nce Aud it Audit Committee Meeting General Session December 18-19, 2013

  2. Agend a Background Overall Findings General Scope of Audit Detail Scope and Findings Overview of Report Closing California Independent System Operator Audit Committee Presentation December 2013 PwC 1

  3. Op era tiona l Com p lia nce Aud it Background - An operational audit is performed each year. - The 2013 audit covered the real-time scheduling function - Management determined the subject of the assessment • The scope/ subject varies in most years • Outreach to market in February, 2013 • Audit committee briefed on the scope during May, 2013 meeting • PwC determined nature and extent of testing - Our report is an Audit/ Attestation opinion California Independent System Operator Audit Committee Presentation December 2013 PwC 2

  4. Op era tiona l Com p lia nce Aud it Overall Findings - Over 2,000 transactions/ data points were audited - 100% compliance; no exceptions - An unqualified opinion was issued on December 6, 2013 California Independent System Operator Audit Committee Presentation December 2013 PwC 3

  5. Op era tiona l Com p lia nce Aud it General Scope of Audit - Assessment period • August 19 – 25, 2013 • September 24 – 28, 2013 - Specific Scope • Management Assertion covering identified Procedural Elements • Five primary Operating Procedures relate to real-time scheduling • All Operating Procedures are available on website • Ten specific Procedural Elements were identified from these OPs • Objective criteria California Independent System Operator Audit Committee Presentation December 2013 PwC 4

  6. Op era tiona l Com p lia nce Aud it General Scope of Audit (continued) - The ISO’s real-time scheduling function • Conducted 24x7 at both Alhambra and Folsom control rooms • Six control room crews (operating teams) cover control room operations • Real-time scheduling actions/ functions are hourly, daily and real-time - Audit covered • On site observations (over 60 hours) and data inspections • Both Folsom and Alhambra control rooms • All clock hours • All days in week • Five of six shifts California Independent System Operator Audit Committee Presentation December 2013 PwC 5

  7. Op era tiona l Com p lia nce Aud it Detailed Scope and Findings Ref. Real-tim e Scheduling Occurrences During 10 - Com pliance No. Operating Procedures Day Assessm ent Period Assessm ent 1 Pre-Schedule and Check- 10 daily actions; 240 hourly No Exceptions Out Validation schedule sets; approx 2,600 data points 2 E-tag Curtailm ents Approx 20 occurrences No Exceptions 3 Check-out Before the 240 hours; approx 2,600 No Exceptions Hourly Ram p data points 4 Check-out After the Close 240 hours; approx 2,600 No Exceptions of Each Hour data points 5 Final Daily Schedules and 10 days; 220 BA checkouts No Exceptions NAI Totals Com parison (110 NAI; 110 NSA) California Independent System Operator Audit Committee Presentation December 2013 PwC 6

  8. Op era tiona l Com p lia nce Aud it Detailed Scope and Findings (continued) Ref. Real-tim e Scheduling Occurrences During 10 - Com pliance No. Operating Procedures Day Assessm ent Period Assessm ent 6 Manual Pre-Dispatch of Approx 20 dispatches; approx No Exceptions Interchange Transactions 60 data points 7 Manual Dispatch Approx 20 dispatches; approx No Exceptions Interchange Accounting 160 data points 8 Interchange Schedule Approx 20 curtailments No Exceptions Curtailm ents - Before the Operating Hour 9 Interchange Schedule Zero No Occurrences Curtailm ents - Current Operating Hour 10 Unscheduled Flow – Path Approx 10 mitigations; approx No Exceptions 66 30 data points California Independent System Operator Audit Committee Presentation December 2013 PwC 7

  9. Op era tiona l Com p lia nce Aud it Overview of Report Report contents - PwC unqualified opinion regarding Management's Assertion - Management’s Assertion – Summary • Attachment I – Detail management assertion • 100% compliance with 9 elements • One element did not occur • Attachment II – process narrative – unaudited Final thoughts for 2013 Audit • Report structure and level of assurance similar to prior years • Subject of audit – changed – first time for real-time scheduling • Observations – substantially more intrusive this year California Independent System Operator Audit Committee Presentation December 2013 PwC 8

  10. Op era tiona l Com p lia nce Aud it Closing We appreciate ISO staff cooperation - Big effort - several months - Approximately 15 operators - Management and supervisors Questions ? California Independent System Operator Audit Committee Presentation December 2013 PwC 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend