C ONSTRUCTED / P ROJECTED C OSTS : 2010 - 2019 Elementary Schools - - PowerPoint PPT Presentation

G. H. M ITCHELL E LEMENTARY S CHOOL B RIDGEWATER , MA SBC M EETING : S EPTEMBER 24, 2018 Raymond Design Associates H ARD C OSTS + S OFT C OSTS TOTAL PROJECT COST Hard Costs (Construction Costs) Soft Costs Interior/Furniture/


  1. G. H. M ITCHELL E LEMENTARY S CHOOL B RIDGEWATER , MA SBC M EETING : S EPTEMBER 24, 2018 Raymond Design Associates

  2. H ARD C OSTS + S OFT C OSTS TOTAL PROJECT COST Hard Costs (Construction Costs) Soft Costs Interior/Furniture/ Design/Engineering/ Site Costs Building Costs Equipment/Technology Management Parking Foundations Classroom Furniture Architects Sidewalks Structure Dining Furniture Engineers Roadways Enclosure Library Furniture Owner’s PM Drainage Interior Finishes Art & Music Equipment Permitting Play fields Conveying Equipment Custodial Equipment Environmental Playgrounds HVAC Communication Equip. Administrative Retaining Walls Plumbing Computers & Printers Legal Earth Moving Electrical Phones Moving Cost Landscaping Overhead, Fees, Profit Copiers Printing/Advertising Servers Contingency T OTAL P ROJECT C OSTS

  3. C ONSTRUCTED / P ROJECTED C OSTS : 2010 - 2019 Elementary Schools - constructed Elementary Schools - projected Middle/High Schools - constructed Middle/High Schools - projected $600 $580 $560 2019 $540 $520 2017 $500 2018 $480 2015 $460 $440 Cost ($/ SF) $420 2016 $400 2013 2014 $380 $360 $340 2012 2011 $320 2010 $300 $280 3% Escalation $260 $240 $220 $200 GC Bids Received or GC Bids or GMP GMP Executed Expected MSBA P ROJECT C OSTS D ATA

  4. 2018 P ROJECTED C OSTS : E LEMENTARY S CHOOLS Elementary Schools - projected $580 Anticipated Construction Start $560 Clyde F. Brown Elementary (515 students) 2019 $540 District: Millis, MA Construction Cost: $475 $475 $520 Wildwood Elementary School (750 students) District: Amherst, MA $500 Construction Cost: $442 $442 2018 $480 Early Childhood Center (200 students) District: Dedham, MA $460 Construction Cost: $416 $416 $440 Hillside Elementary School (430 students) Cost ($/ SF) District: Needham, MA $420 Construction Cost: $412 $412 $400 Peebles Elementary School (460 students) District: Bourne, MA $380 Construction Cost: $385 $385 Templeton Center School (580 students) $360 District: Narragansett, MA Construction Cost: $351 $351 MSBA P ROJECT C OSTS D ATA

  5. 2019 P ROJECTED C OSTS : E LEMENTARY S CHOOLS Elementary Schools - projected Anticipated Construction Start Tisbury Elementary School (285 students) $580 District: Tisbury, MA Construction Cost: $530 $530 $560 Hildreth Elementary School (445 students) 2019 $540 District: Harvard, MA Construction Cost: $507 $507 $520 Maria Hastings Elementary (645 students) District: Lexington, MA $500 Construction Cost: $483 $483 2018 $480 Winthrop Elementary School (775 students) District: Ipswich, MA $460 Construction Cost: $450 $450 $440 Chapin Street Elementary (630 students) Cost ($/ SF) District: Ludlow, MA $420 Construction Cost: $431 $431 $400 Richer Elementary School (610 students) District: Marlborough, MA $380 Construction Cost: $429 $429 Mulcahey Elementary School (735 students) $360 District: Taunton, MA Construction Cost: $418 $418 MSBA P ROJECT C OSTS D ATA

  6. K-2 G RADE C ONFIGURATION GSF Bridgew ater Cost Construction Cost Total Project Description (Gross (estimated after MSBA (per SF) Cost Square Feet) reimbursement) Base Building $22,204,858 134,235 $27,534,023 $27,534,023 Renovation ($165.42/sf) $71,274,383 Addition/Renovation 147,335 ($483.76/sf) $88,767,358 $51,485,067 $71,586,759 New Construction 133,743 ($535.26/sf) $88,766,341 51,484,478 B ENCHMARKING - T OTAL P ROJECT C OSTS

  7. K-3 G RADE C ONFIGURATION GSF Bridgew ater Cost Construction Cost Total Project Description (Gross Square (estimated after MSBA (per SF) Cost Feet) reimbursement) Base Building $22,204,858 134,235 $27,534,023 $27,534,023 Renovation ($165.42/sf) $78,488,207 Addition/Renovation 166,635 $97,325,376 $56,448,718 ($471.02/sf) $82,227,682 New Construction 159,196 $101,962,326 $59,138,148 ($516.52) B ENCHMARKING - T OTAL P ROJECT C OSTS

  8. E XCLUSIONS ( CONSTRUCTION COSTS )  Alternative Energy – PV Systems  Alternative HVAC systems – Geothermal  Net Zero Compliance  Any premium foundation for poor soil conditions  Synthetic Turf Fields  Field Lighting  Any off site work to other schools to support the grade configuration  Any off-site modifications to surrounding intersections, roadways, etc. B ENCHMARKING - T OTAL P ROJECT C OSTS

  9. Daedalus Projects, Inc. 1 Faneuil Hall Marketplace South Market Building, Suite 4195 Boston, MA 02109-6117 (617) 451-2717 | www.daedalusprojects.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.