Building Information Modelling Whats in it for the Client? BIM MEP - - PowerPoint PPT Presentation

Building Information Modelling Whats in it for the Client? BIM MEP AUS Innovation Form 2014 BIM MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum Why Draw in 3D ? (Thanks to John McCarthy AO) Reduce Clashes Reduce


slide-1
SLIDE 1

BIM – MEP AUS Innovation Form 2014

Building Information Modelling

What’s in it for the Client?

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-2
SLIDE 2

BIM – MEP AUS Innovation Form 2014

Why Draw in 3D ?

(Thanks to John McCarthy AO)

  • Reduce Clashes
  • Reduce Cannibalisation
  • Reduce Materials
  • Reduce Labour
  • Improve Productivity
  • Reduce Construction Cost
  • Reduce Time
  • Reduce Interest

Construction Innovation 2014 Forum

slide-3
SLIDE 3

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-4
SLIDE 4

BIM – MEP AUS Innovation Form 2014

Architecture

Construction Innovation 2014 Forum

slide-5
SLIDE 5

BIM – MEP AUS Innovation Form 2014

1 Bligh was Designed and Documented Entirely in BIM!

  • Design Development
  • Sustainability Analysis
  • BIM in Construction
  • Facilities Management With BIM

BIM Throughout!

Construction Innovation 2014 Forum

slide-6
SLIDE 6

BIM – MEP AUS Innovation Form 2014

1 Bligh was Designed and Documented Entirely in BIM!

  • Strong commitment by DEXUS to BIM
  • Entire consultant team used BIM
  • All subcontractors in BIM
  • Head Contractor in BIM
  • 32 parties in combined model

BIM by Everyone!

Construction Innovation 2014 Forum

slide-7
SLIDE 7

BIM – MEP AUS Innovation Form 2014

Construction Stage

  • Appoint BIM Manager
  • Head Contractor implements BIM
  • All subcontractors expected to use BIM
  • BIM Execution Plan developed
  • Training and secondment programs

to BIM thus enabling project team

  • Information requirements, standards,

protocols and publication cycle defined

Construction Innovation 2014 Forum

slide-8
SLIDE 8

BIM – MEP AUS Innovation Form 2014

A Strategic Approach to Implementation and Management

  • Not a project team of geniuses
  • No specialist software or hardware:
  • Revit and Navisworks as the main platforms
  • Standard PC workstations
  • Single BIM Manager
  • Identify the desired outcomes
  • Identify required tasks and information
  • Find ways to deal with the issues

Construction Innovation 2014 Forum

slide-9
SLIDE 9

BIM – MEP AUS Innovation Form 2014

Elevation/Section 3D study Plan Detail Central Building Information Model Schedule

Construction Innovation 2014 Forum

slide-10
SLIDE 10

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-11
SLIDE 11

BIM – MEP AUS Innovation Form 2014

Image by Arup

Construction Innovation 2014 Forum

slide-12
SLIDE 12

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-13
SLIDE 13

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-14
SLIDE 14

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-15
SLIDE 15

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-16
SLIDE 16

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-17
SLIDE 17

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-18
SLIDE 18

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-19
SLIDE 19

BIM – MEP AUS Innovation Form 2014

Construction Innovation 2014 Forum

slide-20
SLIDE 20

BIM – MEP AUS Innovation Form 2014

The BIM Process

  • “On-site clashes have been

dramatically reduced,

leading to higher quality work, improved coordination between tradesmen and time savings.”

  • “Over 10,000 clashes have been detected

prior to site works through the delivery of the project. The Bligh Street BIM model now accommodates

  • ver 30 individual discipline models”

Bruce Jones, Grocon

  • “We reduced waste, we saved time,

we increased quality”

Tony Gulliver, Development Manager, Dexus Property Group

Construction Innovation 2014 Forum

slide-21
SLIDE 21

BIM – MEP AUS Innovation Form 2014

The BIM Process

  • “sections of this complex geometry have been set out by surveyors in 3D

with information generated directly from the BIM model – in doing so,

the correctness and precision of construction has been improved.”

  • “We saw accelerated coordination
  • f disciplines and trades.”
  • “Many of the most complex areas of

Bligh Street such as basements, plant rooms and the roof structure, simply could not have been

designed or constructed without the use of BIM.”

Bruce Jones, Grocon

Construction Innovation 2014 Forum

slide-22
SLIDE 22

BIM – MEP AUS Innovation Form 2014

So what did DEXUS get?

  • Reduced clashes
  • Reduced cannibalisation
  • Reduced materials
  • Reduced labour
  • Improved productivity
  • Reduced tolerances
  • Higher quality finishes
  • 1st CBD High rise 6 Star Green Star
  • Integrated building and tenant model
  • Integrated building management system
  • Lower ongoing operating costs

1 BLIGH

Construction Innovation 2014 Forum

slide-23
SLIDE 23

BIM – MEP AUS Innovation Form 2014

40% recycled concrete 90% steel with 50% recycled content FSC certified timber Recycled timber Solar cooling Tri-generation Black water treatment Rainwater harvesting Sewer mining Naturally ventilated atrium Double skin facade

1 BLIGH ESD

slide-24
SLIDE 24

BIM – MEP AUS Innovation Form 2014

So what of the future?

  • Build on past achievements
  • Embrace Technological Change
  • Benchmark and specify BIM-MEPAUS
  • Integrate BIM Systems for Portfolios
  • Educate Owners and Facility Managers