Building Better Roads Kier Performance Report
2012/13
7
Item 7
Page 17
Building Better Roads Kier Performance Report Page 17 Item 7 - - PowerPoint PPT Presentation
Building Better Roads Kier Performance Report Page 17 Item 7 2012/13 7 7 Overview Page 18 Network Planned Safety Keeping Improvements Network Safe by Maintenance - removing Hazards improving transport delivering
7
Item 7
Page 17
Safety – Keeping
Network Safe by removing Hazards
Planned Maintenance -
delivering structural repairs
Network Improvements–
improving transport infrastructure
Minor Works –
low value activities to improve network appearance & accessibility
Winter Service–
ensuring network is free from snow & ice
7
Page 18
7
Page 19
damage it should be removed within 24 hours, potholes >40mm deep
should be removed within 28 days, potholes >30mm deep
7
Page 20
In 2012/13, May Gurney achieved:
Total Reported Total Repaired Target Target Achieved Emergency 2hr Repair 6,528 6,387 98% 98% High Risk 24hr Repair 34,335 33,476 98% 98% Medium Risk 28 Day Repair 24,896 23,381 98% 94% TOTAL REPAIRS 65,759 63,244 98% 96%
7
Page 21
20,000 defects (80% relating to potholes) repaired above annual target of 45,000
significant losses as they were required to pay for 10 extra monthly pothole crews to keep pace with repairs & achieve overall 96%
MG focused on individual repair rather then delivering more complex “patch” repair
defects, resulted in large number of defects raised in error
xtra G nthly
7
Page 22
Each month Surrey Highways complete a 5% random audit
although during winter period there was a significant increase in temporary repairs
contract (this was jointly agreed with MG)
management
7
Page 23
& new £100m capital investment to reconstruct 300 miles of network
time for MG to deliver larger scale repairs, with focus on quality not time
definition to what is classified as Safety Defect
7
Page 24
7
Page 25
needs and constraints
Value
Local Committee Programme £2.0m Central Minor Works £2.0m TOTAL £4.0m
7
Page 26
Issue Action
Order Speed – Target of all orders constructed within 3 months from
Increased resource in pricing team (key bottleneck) and automating key processes seen as critical to reducing order period Local Programme – lack of clarity
Lack of clarity resulting in large areas of programme not agreed until late xmas. Work ongoing to understand Members priorities and feed into programme earlier Signage Delays – specific resource constraints in MG supply chain to deliver create new permanent signs Work in progress to identify stock management and construction process with MG suppliers
7
Page 27
7
Page 28
In 2012/13, May Gurney achieved:
Total Value Total Schemes Surface Reconstruction– repair Surrey’s worst roads £10.0m 60 Surface Protection – protecting Surrey’s roads for extra 5 years £7.5m 370 Local Structural Repair – funded by Local Committee £2.0m TBC Footways – replacing and repairing £1.5m 60 Drainage & Structures – maintaining key bridges, embankments and drainage £4.0m 20 TOTAL £25.0m 510
7
Page 29
with sweeping and relining completed within 4 weeks of delivery
road closure of A22
months
culture
nts f
7
Page 30
Olympic Road Race
Route resurfaced delivering over 15 miles
improvements
A22 Flood Scheme
New Lay-by to remove excess water
Tartar Hill Foot Bridge
Replaced redundant bridge with new facilities Lightwater Bypass Safety Barrier New design saved 40% making previous unaffordable scheme deliverable
7
Page 31
Issue Action
Advance Warning Notices
External signage/letters not always containing accurate dates Schemes to be designed 3 months in advance of construction date thus ensuring programme fully “locked” prior to issue of letters/signs
Real Time Programme Info
Contact Centre not armed with latest programme information to respond to resident queries New LIVEProgramme portal launching to enable all SCC staff and members to have latest programme info confirming latest changes
Ltd co-ordination with Local Programme
Project commenced to improve joint working and co-ordination
Local Structure Repair Resource
Sub-Contractors did not meet quality standards and have therefore been replaced for Year 2
Drainage Design process too slow
Limited forward planning and existing data– options being explored to move to 5 year programme
Footways Programme
High cost of reconstruction limiting programme scale, project to explore options to reduce cost
7
Page 32
7
Page 33
previous year, improved working with Skanksa and May Gurney
management, junctions amendment and new pelican crossings
years ago
Value Schemes Integrated Transport Schemes – funded by Local Committee £3.0m 130 Local Transport Sustainability Fund (LSTF)– funded by DFT £0.5m 10 TOTAL £3.5m 140
7
Page 34
Olympics Route Network
Signage & dedicated lanes created & removed for Olympics
20 x Speed
Reduction schemes delivered in 12 months
Guildford North St
New town centre footway & parking Fordbridge Rd
Pedestrian Crossing previously deemed too difficult due to high voltage cables –
7
Page 35
Issue Action
Committee Decision Making – Late decisions increases risk in programme Design Review to determine how required decisions can be more closely aligned to quarterly committee meetings and improving scheme delegation powers Weak Risk Assessments – issues in determining full risks prior to Outline Design Full Risk Analysis at start of design process to determine full legal, planning and resource risks, which can then be built into design programme. LSTF – need to accelerate construction programme Additional design resource secured to ensure minimum of £1.5m delivered in year 2 Innovation – team not fully exploiting new design options and solutions from UK best practice Increased focus on reviewing UK case studies and assessing suitability for adapting to SCC network
7
Page 36
7
Page 37
VERY SUCCESSFUL YEAR