7FTD CO Ltd 7FTD CO.,Ltd
FOUNDATION FOUNDATION PILES PILES PILES PILES
7FTD CO., Ltd FTD CO., Ltd
‘Building a foundation ‘Building a foundation for for Cambodia’ Cambodia’
Building a foundation Building a foundation for for Cambodia - - PowerPoint PPT Presentation
7FTD CO Ltd 7FTD CO.,Ltd FOUNDATION FOUNDATION PILES PILES PILES PILES 7FTD CO., Ltd FTD CO., Ltd Building a foundation Building a foundation for for Cambodia Cambodia : INDEX : INDEX
7FTD CO Ltd 7FTD CO.,Ltd
FOUNDATION FOUNDATION PILES PILES PILES PILES
7FTD CO., Ltd FTD CO., Ltd
‘Building a foundation ‘Building a foundation for for Cambodia’ Cambodia’
1)
COMPANY PROFILE
3)
CERTIFICATES
INTRODUCTION HUMAN RESOURCES MANAGEMENT TRANSFER TECHNOLOGY TRANSFER PRODUCTION ABILITY MACHINE & CAPACITY SOCIAL CERTIFICATE QUALITY MANAGEMENT
2) FOUNDATION PILES 4) NETWORK & CLIENTS 2) FOUNDATION PILES
PRODUCT OVERVIEW ADVANTAGES (OF 7FTD PILES) 7FTD STANDARD
4/08/2012 Product Presentation –Foundation Piles 2
7FTD CO., LTD = expert @
្លកុមហ៊ុន៧េអហ្ឝធីឌីខូអិលធីឌី ិ
manufacturing electrical poles manufacturing foundation piles
ឯកេទសកនុងករផលិតៈ
បេង គ លេភ្វើង សសរ្លគឹះ
manufacturing foundation piles
following the European standard. សសរ្លគះ
េគរពមបទ ្ឌ នអុឺរ៉ុប។
(Drawing view of factory) (View of factory) (Drawing view of factory) (View of factory)
4/08/2012 Product Presentation –Foundation Piles 4
Joint Venture partners:
p
SOKCHOEURN DEVELOPMENT CO., Ltd FLANDERS CONCRETE NV THU DUC LONG AN CENTRIFUGAL JOINT STOCK COMPANY
( The Signing Ceremony of Joint V A ) Venture Agreement)
Why investing?
y g
Develop & improve infrastructure of Cambodia Positive outsourcing for foreign investors A k t illi t d !
4/08/2012 Product Presentation –Foundation Piles 5
A market willing to upgrade!
ធនធនមនុស គឺជគន្វ្វឹះេឆ ព ះេទកន់ភពេជគជ័យ
្វ្វ ព បេងកើនសមតថភពបុគលិកកមពុជមរយៈ
ករេផទរចំេនះដឹងែផនក្លគប់្លគង (មែបបអឺរ៉ុប) ករេផរចំេនះដឹងែផកផលិតកម (មបទន
(Cylinder & Cube Sample)
ករេផទរចេនះដងែផនកផលតកមម (មបទ ្ឌ ន េវៀតម & អឺរ៉ុប) ករេផទរចំេនះដឹងែផនក្លបតិបត្ថិ្លបកបេយ ្លបសិទភព
l b d ff
្លបសទធភព
Develop Cambodian staff:
Management knowledge transfer = Europe Production knowledge transfer = Vietnam & Europe Optimization knowledge transfer = & Vietnam & Europe
(Product controlling)
19/12/2011 Product Presentation – Foundation Piles 6
The maximum ‘average’ = 170 products/day.
Requirements according to JIS standards (JIS A5335-1987)
OR OR
Requirements according to CLIENT
4/08/2012 Product Presentation –Foundation Piles 7
q g
Batching Plant (1) Mobile crane on rail (1)
Steel cutting & Heading machine(2)
Steel cage making machine(1) Steel tension machine (2)
4/08/2012 Product Presentation –Foundation Piles 8
Spinning Systems (6) Over head crane (7)
4/08/2012 Product Presentation –Foundation Piles 9
Spinning Systems(6)
Sand Sieving Machine (1)
4/08/2012 Product Presentation –Foundation Piles 10
Gravel Cleaning (1)
Modern machines and devices Modern machines and devices. Rigorously checked input materials.
4/08/2012 Product Presentation –Foundation Piles 11
4/08/2012 Product Presentation –Foundation Piles 12
ករេធើពិេធន៍
Put pile on test platform Check the visual crack Testing variety loading levels
ករេធ្ឝ្ឝពេធន
Testing variety loading levels
4/08/2012 Product Presentation –Foundation Piles 13
4/08/2012 Product Presentation –Foundation Piles 15
4/08/2012 Product Presentation –Foundation Piles 16
High loading capacity per pile
g
g capac ty pe p e
A wide range of applications Adaptable to ground condition Ease of transportation Rapid construction, high efficiency
Driving by hammering
4/08/2012 Product Presentation –Foundation Piles 17
Clean and tidy working environment
C ea a d t dy wo g e v o e t
High strength, good penetration power Reliable quality Ease of inspection and testing Wide range of installation methods
4/08/2012 Product Presentation –Foundation Piles 18
Round prestressed foundation piles (JIS-A5335-1987)
Centrifugal technology makes concrete become solid and firm:
increases concrete resistance against corrosion and erosion from the environment increases concrete resistance against corrosion and erosion from the environment Products life cycle is longer
Industrial production conditions: Industrial production conditions:
Stable quality
Save on materials: Save on materials: light structure
R d d i h
4/08/2012 Product Presentation –Foundation Piles 19
Reduced weight
Can not control 100% of
មិនច្លគប់្លគងគណភព
Can not control 100% of
្ល ្ល ុ បន១០០%
េ្លគច
subsequently inspected
ប ឬ ្ល
េ្លកយេពលចក់េបតុងរួច។
subsequently inspected.
្ល ុ ួ
េធ្ឝើ្លឲ ថយ គុណភពេបតុង
cohesionless materials
និង សំភ រៈមិនបនល្ឣ។
ំៃ ៃ ិង ំ cohesionless materials.
High price and vast time Low capacity
តៃលៃថ្វ នងចយេពល
េ្លចើន
សមភពទប
សមថភពទប
4/08/2012 Product Presentation –Foundation Piles 21
Can not control 100% of
មិនច្លគប់្លគងគណភព
Can not control 100% of quality
emperature
្ល ្ល ុ បន១០០%
្ឡ ភព បន
High price and vast time
បន
តំៃលខស់ និងេ្លបើេពលេ្លចើន
High price with transportation
L it
តៃលខពស នងេ្លបេពលេ្លចន ពិបកដឹកជញ
ជូ ន និងមនតំ ៃលៃថ
Low capacity Can not produce big
di t ៃលៃថ្វ
សមតថភពេខយ
diamenter
Pile joint connection is poor មិនចផលិតមុខកត់ធំ តំណតភប់មិនធនបននវ
4/08/2012 Product Presentation –Foundation Piles 22
តណតភ ជ បមនធនបននូវ គុណ
The tendency to bend on the
្លបឈមនឹងករេកងេពល
The tendency to bend on the weak axis during driving. ្ល បញ ចុ ះ្លគឹះ ំ ំង ង
Little end bearing stress.
L f i i
កង្លទចុងសសរេខយ កំំងកកិតេខយ: Low friction:
កងកកតេខយ:
ជ នដល់្លសទប់ Need to be driven to a dense sand or resistant layers. ្ល ូ ជូ ្ល រឹង
4/08/2012 Product Presentation –Foundation Piles 23
4/08/2012 Product Presentation –Foundation Piles 25 Management Transfer – Flanders Concrete NV Technology Transfer – THU DUC LONG AN
4/08/2012 Product Presentation –Foundation Piles 26 7FTD has got certificate of appreciation from Ministry of interior for flood donation.
IBC Project
7NG Group Co., Ltd NURI D&C T
Borey Sen Sok EVERGREEN VVF Development Co., EVERGREEN Consotium Co., Ltd VVF Development Co., ltd Thya Ktech Co.,ltd Mekong View Tower HOTEL 13 Floor Kampongcham Mol Product Presentation –Foundation Piles 28 Dung Try Construciton Kampongcham, Mol
Dina
After driving Start pile driving Welding joint Painting after welding joint Pile driving process
t NURI D&C C t NURI D&C
d t PC D P d t PC D300 300
j t Fi d A t S h l ( P j t Fi d A t S h l (9 Fl ) Fl )
Product Presentation –Foundation Piles 29
Customer : NURI D&C
Start date : 28 28/11 11/2011 2011
Product :PC D300 300
Depth : 22 22m ( m (10 10+12 12)m )m
Project: Find Art School (9 9 Floors) Floors)
Address: Behind Wat Wat Lanka, PP Lanka, PP
Pile driving process After driving Pile measurement Welding joint Position measurement
t EVERGREEN C t EVERGREEN
d t PC D P d t PC D400 400 & D & D500 500
j t C d i i P j t C d i i
Product Presentation –Foundation Piles 30
Customer : EVERGREEN
Start date : 30 30/11 11/2011 2011
Product :PC D400 400 & D & D500 500
Depth : 32 32m ( m (10 10+10 10+12 12)m )m
Project: Condominium
Address: Chak Chak Angre Angre Krom Krom, PP , PP
Pile driving process Setting point for pile driving Pile driving process After driving After driving Pile driving process
t VVF C t VVF
d t PC D P d t PC D300 300
j t Ri W h P j t Ri W h
Product Presentation –Foundation Piles 31
VVF Customer : VVF
Start date : 04 04/01 01/2012 2012
Product :PC D300 300
Depth : 22 22m ( m (10 10+12 12)m )m
Project: Rice Warehouse
Address: Kampot Kampot, Cambodia , Cambodia
Pile drilling & driving process Pile shoe connection Pile driving process Welding joint After driving
t M k Vi C t M k Vi
d t PC D P d t PC D400 400
j t C d i i ( P j t C d i i (15 15 Fl ) Fl )
Product Presentation –Foundation Piles 32
View Customer : Mekong View
Start date : 01 01/05 05/2012 2012
Product :PC D400 400
Depth : 24 24m ( m (12 12+12 12)m )m
Project: Condominium (15 15 Floors ) Floors )
Address: Chroy Chroy Chang Chang Var Var, PP , PP
Pile driving process Pile driving process Pile driving process Pile driving process Control compression After driving
t R C t R C t ti C t ti
d t PC/PHC D P d t PC/PHC D400 400
j t F d Sh R P j t F d Sh R
Product Presentation –Foundation Piles 33
Customer : R-Construction Construction
Start date : 12 12/05 05/2012 2012
Product :PC/PHC D400 400
Depth : 12 12m m
Project: Ford Show Room
Address: Norodom Norodom Blvd, PP Blvd, PP
Pile pressing process Pile pressing process Infront of IBC construction Pile pressing process Pile pressing process After pressing
t C t B S S k S k
d t PC/PHC D P d t PC/PHC D350 350
j t IBC ( P j t IBC (3 Fl ) Fl )
Product Presentation –Foundation Piles 34
Customer : Borey Borey Sen Sen Sok Sok
Start date : 15 15/05 05/2012 2012
Product :PC/PHC D350 350
Depth : 24 24m ( m (12 12+12 12)m )m
Project: IBC (3 3 Floors) Floors)
Address: Sihaknou Sihaknou Blvd, PP Blvd, PP
Pile delevery process Pile for pressing Pile pressing process Pile for pressing Pile delevery process
t M TO C t M TO S h th S h th
d t PC D P d t PC D300 300
j t Fl t H ( P j t Fl t H (9 Fl ) Fl )
Product Presentation –Foundation Piles 35
Customer : Mr. TO Sochanthy Sochanthy
Start date : 15/06/2012
Product :PC D300 300
Depth : 21 21m ( m (10 10+11 11)m )m
Project: Flat House (9 9 Floors) Floors)
Address: B.Keng B.Keng Kang I, PP Kang I, PP
Site Area Pile for pressing Load Test Verification Pile for pressing Pile delevery process
t M M l Di C t M M l Di
d t PHC D P d t PHC D300 300
j t H t l ( P j t H t l (15 15 Fl ) Fl )
Product Presentation –Foundation Piles 36
Customer : Mr. Mol Dina
Start date : 22 22/06 06/2012 2012
Product :PHC D300 300
Depth : 26 26m ( m (10 10+10 10+6 6) )
Project: Hotel (15 15 Floors) Floors)
Address: River site, Kampongcham Kampongcham
Site Area Piling process Infront of construciton site Finishing work Piling process
t M C t M Ch l d t Ch l d t
d t PC D P d t PC D300 300
j t Fl t ( P j t Fl t (5 Fl ) Fl )
Product Presentation –Foundation Piles 37
Customer : Mr. Chanladet Chanladet
Start date : 18 18/07 07/2012 2012
Product :PC D300 300
Depth : 12 12m
Project: Flat (5 5 Floors) Floors)
Address: #87 87A, A, St.Sothearuos St.Sothearuos, PP , PP
After piling After piling Piling process Transport processing
t M Si Ki C t M Si Ki H
d t PC D P d t PC D300 300
j t P j t A t t A t t ( (10 10 Fl ) Fl )
Product Presentation –Foundation Piles 38
Customer : Mr. Sin Kim Heng Heng
Start date : 20 20/07 07/2012 2012
Product :PC D300 300
Depth : 14 14m ( m (6 6+9 9+9 9) )
Project: Appartment Appartment ( (10 10 Floors) Floors)
Address: Dounpenh Dounpenh, , Pnom Pnom Penh Penh
7FTD CO Ltd 7FTD CO.,Ltd
FOUNDATION FOUNDATION PILES PILES