Building a foundation Building a foundation for for Cambodia - - PowerPoint PPT Presentation

building a foundation building a foundation for for
SMART_READER_LITE
LIVE PREVIEW

Building a foundation Building a foundation for for Cambodia - - PowerPoint PPT Presentation

7FTD CO Ltd 7FTD CO.,Ltd FOUNDATION FOUNDATION PILES PILES PILES PILES 7FTD CO., Ltd FTD CO., Ltd Building a foundation Building a foundation for for Cambodia Cambodia : INDEX : INDEX


slide-1
SLIDE 1

7FTD CO Ltd 7FTD CO.,Ltd

FOUNDATION FOUNDATION PILES PILES PILES PILES

7FTD CO., Ltd FTD CO., Ltd

‘Building a foundation ‘Building a foundation for for Cambodia’ Cambodia’

slide-2
SLIDE 2

មតិក មតិក: INDEX : INDEX

1)

COMPANY PROFILE

3)

CERTIFICATES

 INTRODUCTION  HUMAN RESOURCES  MANAGEMENT TRANSFER  TECHNOLOGY TRANSFER  PRODUCTION ABILITY  MACHINE & CAPACITY  SOCIAL CERTIFICATE  QUALITY MANAGEMENT

2) FOUNDATION PILES 4) NETWORK & CLIENTS 2) FOUNDATION PILES

 PRODUCT OVERVIEW  ADVANTAGES (OF 7FTD PILES)  7FTD STANDARD

4/08/2012 Product Presentation –Foundation Piles 2

slide-3
SLIDE 3
slide-4
SLIDE 4

េសចក្ថ្ថីេផ្ថ្ថើម េសចក្ថ្ថីេផ្ថ្ថើម: INTRODUCTION : INTRODUCTION ្ថ្ថ ្ថ្ថ ្ថ្ថ ្ថ្ថ

7FTD CO., LTD = expert @

្លកុមហ៊ុន៧េអហ្ឝធីឌីខូអិលធីឌី ិ

 manufacturing electrical poles  manufacturing foundation piles

ឯកេទសកនុងករផលិតៈ

បេង គ លេភ្វើង សសរ្លគឹះ

 manufacturing foundation piles

following the European standard. សសរ្លគះ

េគរពមបទ ្ឌ នអុឺរ៉ុប។

(Drawing view of factory) (View of factory) (Drawing view of factory) (View of factory)

4/08/2012 Product Presentation –Foundation Piles 4

slide-5
SLIDE 5

េសចក្ថ្ថីេផ្ថ្ថើម េសចក្ថ្ថីេផ្ថ្ថើម: INTRODUCTION : INTRODUCTION

 Joint Venture partners:

្ថ្ថ ្ថ្ថ ្ថ្ថ ្ថ្ថ

p

 SOKCHOEURN DEVELOPMENT CO., Ltd  FLANDERS CONCRETE NV  THU DUC LONG AN CENTRIFUGAL JOINT STOCK COMPANY

( The Signing Ceremony of Joint V A ) Venture Agreement)

 Why investing?

y g

Develop & improve infrastructure of Cambodia Positive outsourcing for foreign investors A k t illi t d !

4/08/2012 Product Presentation –Foundation Piles 5

A market willing to upgrade!

slide-6
SLIDE 6

េសចក្ថ្ថីេផ្ថ្ថើម េសចក្ថ្ថីេផ្ថ្ថើម: INTRODUCTION : INTRODUCTION

ធនធនមនុស គឺជគន្វ្វឹះេឆ ព ះេទកន់ភពេជគជ័យ

្ថ្ថ ្ថ្ថ ្ថ្ថ ្ថ្ថ

្វ្វ ព បេងកើនសមតថភពបុគលិកកមពុជមរយៈ

ករេផទរចំេនះដឹងែផនក្លគប់្លគង (មែបបអឺរ៉ុប) ករេផរចំេនះដឹងែផកផលិតកម (មបទន

(Cylinder & Cube Sample)

ករេផទរចេនះដងែផនកផលតកមម (មបទ ្ឌ ន េវៀតម & អឺរ៉ុប) ករេផទរចំេនះដឹងែផនក្លបតិបត្ថិ្លបកបេយ ្លបសិទភព

Human resources = KEY to success

l b d ff

្លបសទធភព

Develop Cambodian staff:

 Management knowledge transfer = Europe  Production knowledge transfer = Vietnam & Europe  Optimization knowledge transfer = & Vietnam & Europe

(Product controlling)

19/12/2011 Product Presentation – Foundation Piles 6

slide-7
SLIDE 7

សមតថភពផលិតកមម សមតថភពផលិតកមម: : PRODUCTION ABILITY PRODUCTION ABILITY PRODUCTION ABILITY PRODUCTION ABILITY C bilit t d f d ti il Capability to produce foundation piles:

The maximum ‘average’ = 170 products/day.

Quality of foundation piles’ production

Requirements according to JIS standards (JIS A5335-1987)

OR OR

Requirements according to CLIENT

4/08/2012 Product Presentation –Foundation Piles 7

q g

slide-8
SLIDE 8

េ្លគងច្លក េ្លគងច្លក & & សមតថភព សមតថភព MACHINE & CAPACITY MACHINE & CAPACITY MACHINE & CAPACITY MACHINE & CAPACITY

Batching Plant (1) Mobile crane on rail (1)

Steel cutting & Heading machine(2)

Steel cage making machine(1) Steel tension machine (2)

4/08/2012 Product Presentation –Foundation Piles 8

slide-9
SLIDE 9

េ្លគងច្លក េ្លគងច្លក & & សមតថភព សមតថភព MACHINE & CAPACITY MACHINE & CAPACITY MACHINE & CAPACITY MACHINE & CAPACITY

Spinning Systems (6) Over head crane (7)

4/08/2012 Product Presentation –Foundation Piles 9

Spinning Systems(6)

slide-10
SLIDE 10

ករ្លគប់្លគងគុណភព ករ្លគប់្លគងគុណភព

QUALITY MANAGEMENT QUALITY MANAGEMENT

“Everything is based “Everything is based

  • n quality in order to
  • n quality in order to

q y q y keep our customers keep our customers forever” forever” forever forever

Sand Sieving Machine (1)

“Excellent quality is “Excellent quality is q y q y

  • ur commitment”
  • ur commitment”

4/08/2012 Product Presentation –Foundation Piles 10

Gravel Cleaning (1)

slide-11
SLIDE 11

ករ្លគប់្លគងគុណភព ករ្លគប់្លគងគុណភព

How to obtain ‘QUALITY’?

QUALITY MANAGEMENT QUALITY MANAGEMENT

How to obtain QUALITY ?

Modern machines and devices Modern machines and devices. Rigorously checked input materials.

4/08/2012 Product Presentation –Foundation Piles 11

slide-12
SLIDE 12

ករ្លគប់្លគងគុណភព ករ្លគប់្លគងគុណភព

High tech laboratory + All necessary

QUALITY MANAGEMENT QUALITY MANAGEMENT

High tech laboratory + All necessary equipment and instruments Investigating materials and examining product quality.

4/08/2012 Product Presentation –Foundation Piles 12

slide-13
SLIDE 13

ករ្លគប់្លគងគុណភព ករ្លគប់្លគងគុណភព

Testing the end-product:

ករេធើពិេធន៍

QUALITY MANAGEMENT QUALITY MANAGEMENT

g p

Put pile on test platform Check the visual crack Testing variety loading levels

ករេធ្ឝ្ឝពេធន

Testing variety loading levels

4/08/2012 Product Presentation –Foundation Piles 13

slide-14
SLIDE 14
slide-15
SLIDE 15

ព័ត៌មនអំពីផលិតផល ព័ត៌មនអំពីផលិតផល PRODUCT OVERVIEW PRODUCT OVERVIEW

4/08/2012 Product Presentation –Foundation Piles 15

slide-16
SLIDE 16

ព័ត៌មនអំពីផលិតផល ព័ត៌មនអំពីផលិតផល PRODUCT OVERVIEW PRODUCT OVERVIEW

4/08/2012 Product Presentation –Foundation Piles 16

slide-17
SLIDE 17

គណ្លបេយជន៍ៈ គណ្លបេយជន៍ៈ ADVANTAGES ADVANTAGES គុណ្លបេយជនៈ គុណ្លបេយជនៈ ADVANTAGES ADVANTAGES

 High loading capacity per pile

g

  • ad

g capac ty pe p e

 A wide range of applications  Adaptable to ground condition  Ease of transportation  Rapid construction, high efficiency

  • Driving by hammering

Driving by hammering

  • Static pressing
  • Using a bored hole

4/08/2012 Product Presentation –Foundation Piles 17

slide-18
SLIDE 18

គណ្លបេយជន៍ៈ គណ្លបេយជន៍ៈ ADVANTAGES ADVANTAGES គុណ្លបេយជនៈ គុណ្លបេយជនៈ ADVANTAGES ADVANTAGES

 Clean and tidy working environment

C ea a d t dy wo g e v o e t

 High strength, good penetration power  Reliable quality  Ease of inspection and testing  Wide range of installation methods

4/08/2012 Product Presentation –Foundation Piles 18

slide-19
SLIDE 19

បទ ្ឌ ន្លកុមហ៊ុន បទ ្ឌ ន្លកុមហ៊ុន៧ ៧េអហ្ឝធីឌី េអហ្ឝធីឌី ុ 7FTD STANDARD FTD STANDARD

Why use 7FTD-standard? Why use 7FTD standard?

Round prestressed foundation piles (JIS-A5335-1987)

 Centrifugal technology makes concrete become solid and firm:

 increases concrete resistance against corrosion and erosion from the environment  increases concrete resistance against corrosion and erosion from the environment  Products life cycle is longer

 Industrial production conditions:  Industrial production conditions:

 Stable quality

 Save on materials:  Save on materials:  light structure

 R d d i h

4/08/2012 Product Presentation –Foundation Piles 19

 Reduced weight

slide-20
SLIDE 20
slide-21
SLIDE 21

BORED PILES BORED PILES

 Can not control 100% of

BORED PILES BORED PILES

 មិនច្លគប់្លគងគណភព

 Can not control 100% of

quality

  • Waisting or necking

្ល ្ល ុ បន១០០%

  • ងយបក់ ឬ

េ្លគច

  • Waisting or necking.
  • Concrete cannot be

subsequently inspected

ប ឬ ្ល

  • មិនច្លតូតពិនិតយបន

េ្លកយេពលចក់េបតុងរួច។

subsequently inspected.

  • Water and mud washing
  • ut cement

្ល ុ ួ

  • ទឹកនិងភក់យចូលេបតុង

េធ្ឝើ្លឲ ថយ គុណភពេបតុង

  • ut cement.
  • Can not be formed in

cohesionless materials

  • ភពស្ឣិតរងេបតុង

និង សំភ រៈមិនបនល្ឣ។

ំៃ ៃ ិង ំ cohesionless materials.

 High price and vast time  Low capacity

 តៃលៃថ្វ នងចយេពល

េ្លចើន

 សមភពទប

Low capacity

សមថភពទប

4/08/2012 Product Presentation –Foundation Piles 21

slide-22
SLIDE 22

SQUARE PILES SQUARE PILES

 Can not control 100% of

SQUARE PILES SQUARE PILES

 មិនច្លគប់្លគងគណភព

Can not control 100% of quality

  • T

emperature

្ល ្ល ុ បន១០០%

  • មិនចកំនត់សីតុណ

្ឡ ភព បន

  • Feeding water

 High price and vast time

បន

  • មិនចផគត់ផគង់ទឹកបនល្ឣ

តំៃលខស់ និងេ្លបើេពលេ្លចើន

 High price with transportation

L it

 តៃលខពស នងេ្លបេពលេ្លចន  ពិបកដឹកជញ

ជូ ន និងមនតំ ៃលៃថ

 Low capacity  Can not produce big

di t ៃលៃថ្វ

 សមតថភពេខយ

diamenter

 Pile joint connection is poor  មិនចផលិតមុខកត់ធំ  តំណតភប់មិនធនបននវ

4/08/2012 Product Presentation –Foundation Piles 22

តណតភ ជ បមនធនបននូវ គុណ

slide-23
SLIDE 23

H- PILES PILES

 The tendency to bend on the

H- PILES PILES

 ្លបឈមនឹងករេកងេពល

The tendency to bend on the weak axis during driving. ្ល បញ ចុ ះ្លគឹះ ំ ំង ង

 Little end bearing stress.

L f i i

 កង្លទចុងសសរេខយ  កំំងកកិតេខយ:  Low friction:

  • Lower resistance.
  • Need to be driven to a dense

 កងកកតេខយ:

  • ភពធន់សសរមិន្លគប់្លគន់
  • ្លតវករបញ

ជ នដល់្លសទប់ Need to be driven to a dense sand or resistant layers. ្ល ូ ជូ ្ល រឹង

4/08/2012 Product Presentation –Foundation Piles 23

slide-24
SLIDE 24
slide-25
SLIDE 25

TRANSFERING FROM TRANSFERING FROM FLANDERS FLANDERS CO C C CO C C O G O G CONCRETE & THU DUC CONCRETE & THU DUC-LONG AN LONG AN

4/08/2012 Product Presentation –Foundation Piles 25 Management Transfer – Flanders Concrete NV Technology Transfer – THU DUC LONG AN

slide-26
SLIDE 26

SOCIAL CERTIFICATE SOCIAL CERTIFICATE SOCIAL CERTIFICATE SOCIAL CERTIFICATE

4/08/2012 Product Presentation –Foundation Piles 26 7FTD has got certificate of appreciation from Ministry of interior for flood donation.

slide-27
SLIDE 27
slide-28
SLIDE 28

FOUNDATION PILES REFERENCES FOUNDATION PILES REFERENCES FOUNDATION PILES REFERENCES FOUNDATION PILES REFERENCES

IBC Project

7NG Group Co., Ltd NURI D&C T

  • RO Construction

Borey Sen Sok EVERGREEN VVF Development Co., EVERGREEN Consotium Co., Ltd VVF Development Co., ltd Thya Ktech Co.,ltd Mekong View Tower HOTEL 13 Floor Kampongcham Mol Product Presentation –Foundation Piles 28 Dung Try Construciton Kampongcham, Mol

Dina

slide-29
SLIDE 29

PROJECT REFERENCE ( PROJECT REFERENCE (1) PROJECT REFERENCE ( PROJECT REFERENCE (1)

After driving Start pile driving Welding joint Painting after welding joint Pile driving process

  • C

t NURI D&C C t NURI D&C

  • P

d t PC D P d t PC D300 300

  • P

j t Fi d A t S h l ( P j t Fi d A t S h l (9 Fl ) Fl )

Product Presentation –Foundation Piles 29

  • Customer : NURI D&C

Customer : NURI D&C

  • Start date :

Start date : 28 28/11 11/2011 2011

  • Product :PC D

Product :PC D300 300

  • Depth :

Depth : 22 22m ( m (10 10+12 12)m )m

  • Project: Find Art School (

Project: Find Art School (9 9 Floors) Floors)

  • Address: Behind

Address: Behind Wat Wat Lanka, PP Lanka, PP

slide-30
SLIDE 30

PROJECT REFERENCE ( PROJECT REFERENCE (2) PROJECT REFERENCE ( PROJECT REFERENCE (2)

Pile driving process After driving Pile measurement Welding joint Position measurement

  • C

t EVERGREEN C t EVERGREEN

  • P

d t PC D P d t PC D400 400 & D & D500 500

  • P

j t C d i i P j t C d i i

Product Presentation –Foundation Piles 30

  • Customer : EVERGREEN

Customer : EVERGREEN

  • Start date :

Start date : 30 30/11 11/2011 2011

  • Product :PC D

Product :PC D400 400 & D & D500 500

  • Depth :

Depth : 32 32m ( m (10 10+10 10+12 12)m )m

  • Project: Condominium

Project: Condominium

  • Address:

Address: Chak Chak Angre Angre Krom Krom, PP , PP

slide-31
SLIDE 31

PROJECT REFERENCE ( PROJECT REFERENCE (3) PROJECT REFERENCE ( PROJECT REFERENCE (3)

Pile driving process Setting point for pile driving Pile driving process After driving After driving Pile driving process

  • C

t VVF C t VVF

  • P

d t PC D P d t PC D300 300

  • P

j t Ri W h P j t Ri W h

Product Presentation –Foundation Piles 31

  • Customer :

VVF Customer : VVF

  • Start date :

Start date : 04 04/01 01/2012 2012

  • Product :PC D

Product :PC D300 300

  • Depth :

Depth : 22 22m ( m (10 10+12 12)m )m

  • Project: Rice Warehouse

Project: Rice Warehouse

  • Address:

Address: Kampot Kampot, Cambodia , Cambodia

slide-32
SLIDE 32

PROJECT REFERENCE (4) PROJECT REFERENCE (4) PROJECT REFERENCE (4) PROJECT REFERENCE (4)

Pile drilling & driving process Pile shoe connection Pile driving process Welding joint After driving

  • C

t M k Vi C t M k Vi

  • P

d t PC D P d t PC D400 400

  • P

j t C d i i ( P j t C d i i (15 15 Fl ) Fl )

Product Presentation –Foundation Piles 32

  • Customer : Mekong

View Customer : Mekong View

  • Start date :

Start date : 01 01/05 05/2012 2012

  • Product :PC D

Product :PC D400 400

  • Depth :

Depth : 24 24m ( m (12 12+12 12)m )m

  • Project: Condominium (

Project: Condominium (15 15 Floors ) Floors )

  • Address:

Address: Chroy Chroy Chang Chang Var Var, PP , PP

slide-33
SLIDE 33

PROJECT REFERENCE ( PROJECT REFERENCE (5) PROJECT REFERENCE ( PROJECT REFERENCE (5)

Pile driving process Pile driving process Pile driving process Pile driving process Control compression After driving

  • C

t R C t R C t ti C t ti

  • P

d t PC/PHC D P d t PC/PHC D400 400

  • P

j t F d Sh R P j t F d Sh R

Product Presentation –Foundation Piles 33

  • Customer : R

Customer : R-Construction Construction

  • Start date :

Start date : 12 12/05 05/2012 2012

  • Product :PC/PHC D

Product :PC/PHC D400 400

  • Depth :

Depth : 12 12m m

  • Project: Ford Show Room

Project: Ford Show Room

  • Address:

Address: Norodom Norodom Blvd, PP Blvd, PP

slide-34
SLIDE 34

PROJECT REFERENCE ( PROJECT REFERENCE (6) PROJECT REFERENCE ( PROJECT REFERENCE (6)

Pile pressing process Pile pressing process Infront of IBC construction Pile pressing process Pile pressing process After pressing

  • C

t C t B S S k S k

  • P

d t PC/PHC D P d t PC/PHC D350 350

  • P

j t IBC ( P j t IBC (3 Fl ) Fl )

Product Presentation –Foundation Piles 34

  • Customer :

Customer : Borey Borey Sen Sen Sok Sok

  • Start date :

Start date : 15 15/05 05/2012 2012

  • Product :PC/PHC D

Product :PC/PHC D350 350

  • Depth :

Depth : 24 24m ( m (12 12+12 12)m )m

  • Project: IBC (

Project: IBC (3 3 Floors) Floors)

  • Address:

Address: Sihaknou Sihaknou Blvd, PP Blvd, PP

slide-35
SLIDE 35

PROJECT REFERENCE ( PROJECT REFERENCE (7) PROJECT REFERENCE ( PROJECT REFERENCE (7)

Pile delevery process Pile for pressing Pile pressing process Pile for pressing Pile delevery process

  • C

t M TO C t M TO S h th S h th

  • P

d t PC D P d t PC D300 300

  • P

j t Fl t H ( P j t Fl t H (9 Fl ) Fl )

Product Presentation –Foundation Piles 35

  • Customer : Mr. TO

Customer : Mr. TO Sochanthy Sochanthy

  • Start date : 15/06/2012

Start date : 15/06/2012

  • Product :PC D

Product :PC D300 300

  • Depth :

Depth : 21 21m ( m (10 10+11 11)m )m

  • Project: Flat House (

Project: Flat House (9 9 Floors) Floors)

  • Address:

Address: B.Keng B.Keng Kang I, PP Kang I, PP

slide-36
SLIDE 36

PROJECT REFERENCE ( PROJECT REFERENCE (8) J ( J ( )

Site Area Pile for pressing Load Test Verification Pile for pressing Pile delevery process

  • C

t M M l Di C t M M l Di

  • P

d t PHC D P d t PHC D300 300

  • P

j t H t l ( P j t H t l (15 15 Fl ) Fl )

Product Presentation –Foundation Piles 36

  • Customer : Mr. Mol Dina

Customer : Mr. Mol Dina

  • Start date :

Start date : 22 22/06 06/2012 2012

  • Product :PHC D

Product :PHC D300 300

  • Depth :

Depth : 26 26m ( m (10 10+10 10+6 6) )

  • Project: Hotel (

Project: Hotel (15 15 Floors) Floors)

  • Address: River site,

Address: River site, Kampongcham Kampongcham

slide-37
SLIDE 37

PROJECT REFERENCE ( PROJECT REFERENCE (9) J ( J ( )

Site Area Piling process Infront of construciton site Finishing work Piling process

  • C

t M C t M Ch l d t Ch l d t

  • P

d t PC D P d t PC D300 300

  • P

j t Fl t ( P j t Fl t (5 Fl ) Fl )

Product Presentation –Foundation Piles 37

  • Customer : Mr.

Customer : Mr. Chanladet Chanladet

  • Start date :

Start date : 18 18/07 07/2012 2012

  • Product :PC D

Product :PC D300 300

  • Depth :

Depth : 12 12m

  • Project: Flat (

Project: Flat (5 5 Floors) Floors)

  • Address: #

Address: #87 87A, A, St.Sothearuos St.Sothearuos, PP , PP

slide-38
SLIDE 38

PROJECT REFERENCE ( PROJECT REFERENCE (10 10) J ( J ( )

After piling After piling Piling process Transport processing

  • C

t M Si Ki C t M Si Ki H

  • P

d t PC D P d t PC D300 300

  • P

j t P j t A t t A t t ( (10 10 Fl ) Fl )

Product Presentation –Foundation Piles 38

  • Customer : Mr. Sin Kim

Customer : Mr. Sin Kim Heng Heng

  • Start date :

Start date : 20 20/07 07/2012 2012

  • Product :PC D

Product :PC D300 300

  • Depth :

Depth : 14 14m ( m (6 6+9 9+9 9) )

  • Project:

Project: Appartment Appartment ( (10 10 Floors) Floors)

  • Address:

Address: Dounpenh Dounpenh, , Pnom Pnom Penh Penh

slide-39
SLIDE 39

្ល ្លកុមហ៊ុន ្ល ្លកុមហ៊ុន 7 7 7FTD CO., LTD 7FTD CO., LTD FTD CO., LTD FTD CO., LTD No. No. No.124 No.124 124, 124, , S , St.S t.Samdek St St.Sam amdek dek Sot

  • thearos

hearos Sot Sothearos, hearos, , Sangkate , Sangkate Sangka Sangkate te Tonle Tonle Tonle Tonle Basac asac Basac, Basac, , , Khan Khan Khan ChamKar Khan ChamKar ChamKar ChamKar Morn, PP,

  • rn, PP, Cambodi

Cambodia. Morn, PP, Morn, PP, Cambodi Cambodia.

7FTD CO Ltd 7FTD CO.,Ltd

FOUNDATION FOUNDATION PILES PILES

Website: http://www. Website: http://www.7 7ftd.com.kh ftd.com.kh Telephone: ( Telephone: (855 855)23 996 876 23 996 876 / 24 636 7077 24 636 7077 Telephone: ( Telephone: (855 855)23 996 876 23 996 876 / / 24 636 7077 24 636 7077 Fax: ( Fax: (855 855) )23 996 877 23 996 877 Contact: sales@ Contact: sales@7 7ftd.com.kh ftd.com.kh or

  • r info@

info@7 7ftd.com.kh ftd.com.kh