BROOKLINE HIGH SCHOOL EXPANSION SCHOOL COmmIttEE mEEtING APRIL 30, - - PowerPoint PPT Presentation

brookline high school expansion
SMART_READER_LITE
LIVE PREVIEW

BROOKLINE HIGH SCHOOL EXPANSION SCHOOL COmmIttEE mEEtING APRIL 30, - - PowerPoint PPT Presentation

BROOKLINE HIGH SCHOOL EXPANSION SCHOOL COmmIttEE mEEtING APRIL 30, 2020 BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 1 AGENDA PROJECT OVERVIEW PROJECT GOALS AND IDEAS SCHEDULE COMMUNITY ENGAGEMENT DESIGN OVERVIEW


slide-1
SLIDE 1

BROOKLINE HIGH SCHOOL EXPANSION PAGE 1 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION

SCHOOL COmmIttEE mEEtING APRIL 30, 2020

slide-2
SLIDE 2

BROOKLINE HIGH SCHOOL EXPANSION PAGE 2 APRIL 30, 2020

AGENDA

  • PROJECT OVERVIEW
  • PROJECT GOALS AND IDEAS
  • SCHEDULE
  • COMMUNITY ENGAGEMENT
  • DESIGN OVERVIEW
  • CONSTRUCTION PROGRESS
  • BUDGET
slide-3
SLIDE 3

BROOKLINE HIGH SCHOOL EXPANSION PAGE 3 APRIL 30, 2020

BROOkLINE HIGH SCHOOL ExPANSION

slide-4
SLIDE 4

BROOKLINE HIGH SCHOOL EXPANSION PAGE 4 APRIL 30, 2020

BROOkLINE HIGH SCHOOL TAPPAN STREET GYM & kIRRANE AQUATIC CENTER

THIRD FLOOR RENOVATION

UNIFIED ARTS BUILDING

TO RIVERSIDE

D

P

CYPRESS FIELD & PLAYGROUND

TAPPAN STREET B R I N G T O N R D TO LECHMERE D A V I S A V E GREENOUGH STREET CYPRESS STREET B R O O K L I N E H I L L S

111 CYPRESS BUILDING NEW STEM WING

current project scope (2020)

NEW BUILDING AT 111 CYPRESS ST

RENOVATION TO PARTS OF TAPPAN GYM RENOVATION OF CYPRESS FIELD

NEW STEM WING AT MAIN BUILDING RENOVATION OF 3RD FLOOR OLD SCIENCE WING

BROOkLINE HILLS PLATFORM RENOVATION TAPPAN STREETSCAPE

NEW CYPRESS BUILDING BROOkLINE HILLS PLATFORM RENO. NEW STEM WING 3rD FLoor reno. (oLD science wing) TAPPAN GYM RENOVATION CYPRESS FIELD RENOVATION DEFERRED MAINTENANCE TAPPAN STREETSCAPE IMPROVEMENTS MBTA PLAzA OLD LINCOLN SWING SPACE

B R I N G T O N R D

MBTA PLAzA OLD LINCOLN SWING SPACE DEFERRED MAINTENANCE

slide-5
SLIDE 5

BROOKLINE HIGH SCHOOL EXPANSION PAGE 5 APRIL 30, 2020

PROjECt tEAm ASSEmBLEd tOwN Of BROOKLINE OWNERS PROJECT MANAGER HILL INtERNAtIONAL ARCHITECT wILLIAm RAwN ASSOCIAtES CONSTRUCTION MANAGER SKANSKA MBTA PLATFORM ARCHITECT AECOm MBTA PLATFORM CM SKANSKA CIvIL

slide-6
SLIDE 6

BROOKLINE HIGH SCHOOL EXPANSION PAGE 6 APRIL 30, 2020

PROjECt SCHEdULE

Brookline High School Expansion Overall Project Schedule

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

CONCEPT DESIGN (HMFH Architects) PROGRAMMING (WRA) SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION PROGRAM VERIFICATION SCHEMATIC DESIGN CONCEPT DESIGN HMFH ARCHITECTS DESIGN DEVELOPMENT CONSTRUCTION CD PHASE 2016 2017 2018 2019 2020 2021

  • SCHEmAtIC dESIGN COmPLEtE

mAR 2018

  • tOwN ELECtION

mAY 2018

  • tOwN vOtE

jUN 2018

  • dESIGN dEvELOPmENt COmPLEtE

jAN 2019

  • mBtA mOA SIGNEd:

jUL 2018

  • EARLY PACKAGES fOR BId BEGINS

jAN 2019

  • CONStRUCtION dOCUmENtS fOR BId

AUG 2019

  • dEmOLItION BEGINS

AUG 2019

slide-7
SLIDE 7

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 7

REASONS FOR THE PROJECT

  • 1. Increased Enrollment
  • Enrollment at Brookline High School has increased from around 1,700 students seven years ago to 2,025 in the

2017-2018 academic year. The current BHS facilitjes cannot handle a student body of this size.

  • 2. outmoded science Facilitjes
  • A 21st century STEM (Science, Technology, Engineering & Math) educatjon requires fmexible, adaptable spaces.
  • New designated places are needed to promote collaboratjon between teachers and students across various
  • disciplines. STEM program will leverage UAB arts programming.
  • 3. BHs educatjon plan
  • BHS has taken the opportunity to rethink how it can carry its traditjon of excellence and innovatjon forward.

Three key questjons that propel the development of the Educatjon Plan are:

  • How will BHS engage students more deeply?
  • How will BHS betuer serve all students?
  • How do we expand BHS and stjll maintain a cohesive, unifjed campus?
  • 4. Facilitjes Maintenance & upkeep
  • BHS has recognized the project as an opportunity to improve and upgrade key elements of campus

infrastructure.

slide-8
SLIDE 8

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 8

Bring 9th graders to rest of campus

  • World Languages (Main Building)
  • Electjves (Unifjed Arts Building /Main Building)
  • Health & Fitness (Tappan)

Bring 10-12th graders to cypress Building

  • Optjonal courses:
  • Creatjve Writjng
  • Social & Racial Justjce
  • Advanced Placement (AP) Physics
  • Multj-use White Box Space
  • Drama, Dance, Music
  • Guest Speakers for other Classes
  • Interdisciplinary Work

BROOkLINE HIGH SCHOOL TAPPAN STREET GYM & kIRRANE AQUATIC CENTER UNIFIED ARTS BUILDING

TO RIVERSIDE

D

CYPRESS FIELD & PLAYGROUND

T A P P A N S T R E E T B R I N G T O N R D TO LECHMERE D A V I S A V E GREENOUGH STREET CYPRESS STREET

111 CYPRESS SITE

B R O O K L I N E H I L L S

NEW STEM WING

GOAL: CREATE A UNIFIED CAMPUS

N

100’ 50’ 0’ 200’

slide-9
SLIDE 9

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 9

NEW, WELCOMING “FRONT PORCHES” UNIFY BHS CAMPUS

FRONTING A CIVIC GREEN

CYPRESS FIELD & PLAYGROUND

strengthen sense of civic instjtutjon around cypress Field

  • STEM Wing: Create gracious New Entry to Main

Building campus

  • Tappan Athletjc Complex: Unite Gym and Pool with

New Lobby

  • 111 Cypress: Lean-in toward Cypress Field

STUDENTS HANGING OUT ON GREENOUGH STREET AFTER SCHOOL

slide-10
SLIDE 10

BROOKLINE HIGH SCHOOL EXPANSION PAGE 10 APRIL 30, 2020

COMMUNITY ENGAGEMENT TEACHER AND PUBLIC FEEDBACk

slide-11
SLIDE 11

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 11

MEETINGS WITH THE PUBLIC THROUGHOUT DESIGN

slide-12
SLIDE 12

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 12

MEETINGS WITH FACULTY AND STUDENTS THROUGHOUT DESIGN

slide-13
SLIDE 13

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 13

Listening - iDp sessions

  • Four Intensive Design Process (IDP) sessions at BHS,

including more than 50 hours of discussions with faculty, stafg, students, and athletjcs & recreatjon:

  • iDp 1: September 13 - 15, 2017

3 days, 30 meetjngs, 21 groups

  • iDp 2: October 3, 2017

1 day, 10 meetjngs, 10 groups

  • iDp 3: October 31, 2017

1 day, 8 meetjngs, 10 groups

  • iDp 4: December 14 - 15, 2017

2 days, 17 meetjngs, 21 groups

  • Brington road neighbors’ Meetjng: December 20, 2017
  • Faculty & student open House at BHs: February 15, 2018
  • six BHs expansion Advisory Building commituee Meetjngs

since September 2017, open to public

WRA & BHS Faculty during IDP session at BHS campus WRA & Community Members at BHS Expansion Advisory Building Commituee Meetjng

slide-14
SLIDE 14

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 14

BRINGTON ROAD NEIGHBORS’ MEETING (DEc 20, 2017)

slide-15
SLIDE 15

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 15 WRA with BHS Faculty & Students during Open House Session at BHS campus

FACULTY & STUDENT OPEN HOUSE AT BHS (FEb 15, 2018)

slide-16
SLIDE 16

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 16

REVIEW OF STEM WING PLANS WITH BHS FACULTY (May 11, 2018)

slide-17
SLIDE 17

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 17

FULL SCALE CHEM / BIO LAB MOCkUP (JUNE 21, 2018)

slide-18
SLIDE 18

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 18

BHS OPEN HOUSE (FEbrUary 2020)

slide-19
SLIDE 19

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 19

BHS OPEN HOUSE (FEbrUary 2020)

slide-20
SLIDE 20

BROOKLINE HIGH SCHOOL EXPANSION PAGE 20 APRIL 30, 2020

111 cypress BuiLDing (now 22 tAppAn st)

slide-21
SLIDE 21

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 21

111 CYPRESS: RESPONDING TO EDUCATION PLAN

  • 1. create a unifjed campus
  • Civic Presence on Cypress Field
  • Main Door facing West toward rest of Campus
  • 111 Cypress Building programmed primarily for 9th grade students, with several classrooms for specifjcally for

upper class courses

  • 9th Grade students will take classes in Unifjed Arts Building (UAB), Tappan Athletjc Complex and Main Building
  • 2. engage students Deeply
  • Interdisciplinary “Quilt” organizatjon: classrooms programmed as any discipline (Math, English, or Social Studies)
  • Flexible classroom seatjng and teaching arrangements
  • Integrated breakout spaces
  • “Front Porch” on Tappan: a place like Greenough Street for afuer-school gathering
  • See & Be Seen at Cafeteria
  • 3. Serve All Students
  • Adult presence on each fmoor
  • Find your Niche: variety of places to gather, study in groups, seek help, get engaged
  • library, library porch, science

collaboratjon zone, south stair

slide-22
SLIDE 22

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 22

111 CYPRESS: MaJor pUblic spacEs FroNtiNg cyprEss FiElD (lEvEl 1)

CAFETERIA SEATING SERVERY CAFETERIA SEATING CAFETERIA SEATING WHITE BOX FRONT PORCH

LECTURES / MEETINGS CLASSES PERFORMANCE WHITE BOX - MULTIPLE USES

LEVEL 1

C Y P R E S S S T R E E T TAPPAN STREET BRINGTON ROAD

slide-23
SLIDE 23

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 23

WHITE BOX BELOW LIBRARY Cypress MEETING ROOM

Library Porch Precedent: Concord Carlisle High School

111 CYPRESS: MaJor pUblic spacEs FroNtiNg cyprEss FiElD (lEvEl 2)

CAFETERIA BELOW

Library Reading Room Precedent: Noble & Greenough Academic Inquiry Center (Under Constructjon)

LeVeL 2

C Y P R E S S S T R E E T TAPPAN STREET BRINGTON ROAD

slide-24
SLIDE 24

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 24

111 CYPRESS: INTERDISCIPLINARY CLASSROOM ORGANIzATION

AP PHYSICS AP PHYSICS

PHYSICS MATH SOCIAL STUDIES ENGLISH GUIDANCE / SPEC ED. COLLABORATION SPACE

BRINGTON ROAD CYPRESS STREET TAPPAN STREET

PHYSICS PHYSICS

PURPOSE BUILT PROGRAM FLExIBLE USE PROGRAM

LEVEL 3

COLLABORATION/ BREAKOUT SPACE

slide-25
SLIDE 25

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 25

111 CYPRESS: 3rD & 4tH Floor plaNs collaboratioN / brEaKoUt spacEs

COLLABORATION/ BREAKOUT SPACE

AP PHYSICS Collaboratjon Haven Garage doors can connect Physics class/labs to the collaboratjon space

CLASS- ROOM CLASS- ROOM CLASS- ROOM CLASS- ROOM CLASS- ROOM CLASS- ROOM BRINGTON ROAD CYPRESS STREET TAPPAN STREET

LEVEL 3

AP PHYSICS PHYSICS PHYSICS

slide-26
SLIDE 26

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 26

111 CYPRESS: A CIVIC PRESENCE

CYPRESS STREET TAPPAN STREET M A I N E N T R Y

slide-27
SLIDE 27

BROOKLINE HIGH SCHOOL EXPANSION PAGE 27 APRIL 30, 2020

TAPPAN STREET “FRONT PORCH”

slide-28
SLIDE 28

BROOKLINE HIGH SCHOOL EXPANSION PAGE 28 APRIL 30, 2020

TAPPAN STREET “FRONT PORCH”

slide-29
SLIDE 29

BROOKLINE HIGH SCHOOL EXPANSION PAGE 29 APRIL 30, 2020

CAFETERIA

slide-30
SLIDE 30

BROOKLINE HIGH SCHOOL EXPANSION PAGE 30 APRIL 30, 2020

SOUTH COLLABORATION SPACE

slide-31
SLIDE 31

BROOKLINE HIGH SCHOOL EXPANSION PAGE 31 APRIL 30, 2020

PHYSICS COLLABORATION SPACE

slide-32
SLIDE 32

BROOKLINE HIGH SCHOOL EXPANSION PAGE 32 APRIL 30, 2020

CYPRESS StREEt LANdSCAPE PLAN

CYPRESS BUILdING UNIfIEd ARtS BUILdING

tAPPAN StREEt BRINGtON ROAd

slide-33
SLIDE 33

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 33

ENERGY CONSERVATION MEASURES 1. LeeD certiFiABLe - LeeD siLVer 2. pArtiAL cooLing in Lieu oF FuLL cooLing Lowers oVerALL energy use For tHe project. 3. REDUNDANT HEATING STRATEGY TO REDUCE ENERGY COSTS: PERIMETER FIN TUBE RADIATORS HEAT THE BUILDING AT NIGHT AND DURING UNOCCUPIED HOURS ALLOWING SHUT DOWN OF AIR HANDLING UNITS 4. IMPROVED WALL AND ROOF INSULATION PERFORMANCE 5. GLAzING SELECTION MAxIMIzES PASSIVE SOLAR HEAT GAIN REDUCING WINTERTIME HEATING LOADS 6. reDuceD interior LigHting tHrougH use oF HigH-eFFiciency LeD LigHt Fixtures 7. HIGH EFFICIENCY VAV MECHANICAL UNITS WITH ENERGY RECOVERY CAPABILITY 8. HigH eFFiciency conDensing BoiLers AnD Air-cooLeD cHiLLer 9. pV reADy rooF (soutHern portion oF tHe rooF ALong Brington rD): $5,500 AnnuAL energy sAVings AnticipAteD

  • 10. HigHLy reFLectiVe rooF: reDuces HeAt isLAnD eFFect
  • 11. OCCUPANCY SENSORS FOR LIGHTING AND VENTILATION
  • 12. ABunDAnt nAturAL DAyLigHting coupLeD witH DAyLigHt sensors reDuces eLectricAL energy consuMption
  • 13. OPERABLE WINDOWS FOR NATURAL VENTILATION: WINDOW SENSORS REDUCE MECHANICAL VENTILATION TO INTERIOR SPACES

WHEN WINDOWS ARE OPEN.

CYPRESS BUILdING - SUStAINABILItY

slide-34
SLIDE 34

BROOKLINE HIGH SCHOOL EXPANSION PAGE 34 APRIL 30, 2020

STEM WING

slide-35
SLIDE 35

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 35

  • 1. create a unifjed campus
  • New Entry to Main Building at corner of Tappan & Greenough
  • Strong visual connectjon and accessibility to Quad
  • Direct access to staircase connectjng fmoors 1, 2, and 3, toward auditorium & library
  • 2. engage students Deeply
  • Science Resource Center serves as academic hub
  • Chemistry and Biology classrooms share fmoors to encourage collaboratjon; see classes you’ll

take in subsequent years

  • Movable furniture to facilitate diverse learning environments
  • Multjple classrooms share breakout spaces with view to the outdoors
  • 3. Serve All Students
  • New 20’ wide accessible entry
  • Places to gather, study in groups: expanded network of collaboratjon zones in Main Building
  • STEM wing will have places all students will want to use
  • Multj-use cafe space can be used for classes, cafe, community meetjngs, and adult educatjon

programs

STEM WING: RESPONDING TO EDUCATION PLAN

slide-36
SLIDE 36

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 36

STEM WING: crEatE a MaJor HigH scHool bUilDiNg ENtraNcE

CULINARY KITCHEN MAKERSPACE CULINARY CAFE

A major building entrance sized to accommodate student preference for entry here:

  • 20’ wide entry hallway
  • Direct access to staircase connectjng fmoors 2 & 3
  • Accessible entrance

LEVEL 1

SEATING AREA QUAD MAJOR NEW ENTRY RETAIL

connectjng to the Quad

  • New doorway to the Quad
  • Abundant glazing for views to the Quad
  • Gathering / seatjng area adjacent to the Quad

expanding cafeteria seatjng

  • Seatjng area facing the Quad expands cafeteria

capacity at peak lunch hours

GREENOUGH STREET SUMNER ROAD Tappan STREET

CLOSED DURING SCHOOL DAY

slide-37
SLIDE 37

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 37

STEM WING: FACILITATE CIRCULATION THROUGH THE BUILDING

TO MAIN AUDITORIUM entrAnce on LeVeL 2 TO LIBRARY TO CAFETERIA

LeVeL 2 LEVEL 1

UP TO AUDITORIUM UP TO THIRD FLOOR

LEVEL 3

slide-38
SLIDE 38

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 38

STEM WING: A NEW HUB FOR SCIENCE

LeVeL 2 LEVEL 3

Science Crossroads:

  • Adjacent to Science Resource Center

& Flex Classroom on Level 2

  • Adjacent to Faculty Spaces on Level 3

interdisciplinary:

  • Biology & Chemistry on each fmoor

UP UP UP

COLLAB/ BREAkOUT CHEM CLASSLAB CHEM CLASSLAB CHEM CLASSLAB CHEM CLASSLAB CHEM CLASSLAB CHEM CLASSLAB CHEM CLASSLAB CHEM CLASSLAB BIO CLASSLAB BIO CLASSLAB BIO CLASSLAB BIO CLASSLAB BIO CLASSLAB BIO CLASSLAB COLLAB/ BREAkOUT COLLAB/ BREAkOUT SCIENCE RESOURCE CENTER FLEx CLASSROOM FACULTY CONFERENCE ROOM COLLAB/ BREAkOUT CROSSROADS CROSSROADS

slide-39
SLIDE 39

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 39

STEM WING: EXpaNDiNg a NEtWorK oF co-cUrricUlar gatHEriNg spacEs

PROPOSED ExISTING

GATHERING CIRCULATION GATHERING CIRCULATION

collaboratjon & Breakout space

  • New seatjng on ground fmoor of the STEM wing facing the

Quad expands cafeteria capacity at peak lunch hours

  • New collaboratjon spaces expands a network of co-

curricular gathering spaces

slide-40
SLIDE 40

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 40

STEM WING: MODEL PHOTO

T A P P A N S T G R E E N O U G H S T

slide-41
SLIDE 41

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 41

STEM WING: MODEL PHOTO

TAPPAN STREET G R E E N O U G H S T R E E T MAIN ENTRY TO STEM WING

slide-42
SLIDE 42

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 42

STEM WING: MODEL PHOTO

T A P P A N S T R E E T

S T E M W I N G E x I S T I N G A U D I T O R I U M & C A F E T E R I A

GREENOUGH STREET

slide-43
SLIDE 43

BROOKLINE HIGH SCHOOL EXPANSION PAGE 43 APRIL 30, 2020

CULINARY ARTS CAFE

slide-44
SLIDE 44

BROOKLINE HIGH SCHOOL EXPANSION PAGE 44 APRIL 30, 2020

1ST LEVEL COLLABORATION

slide-45
SLIDE 45

BROOKLINE HIGH SCHOOL EXPANSION PAGE 45 APRIL 30, 2020

LEVEL 1 MAkER SPACE

slide-46
SLIDE 46

BROOKLINE HIGH SCHOOL EXPANSION PAGE 46 APRIL 30, 2020

StEm wING - SUStAINABILItY

ENERGY CONSERVATION MEASURES 1. LeeD certiFiABLe – LeeD siLVer 2. pArtiAL cooLing in Lieu oF FuLL cooLing Lowers oVerALL energy use For tHe project During suMMer MontHs. 3. REDUNDANT HEATING STRATEGY TO REDUCE ENERGY COSTS: PERIMETER FIN TUBE RADIATORS HEAT THE BUILDING AT NIGHT AND DURING UNOCCUPIED HOURS ALLOWING SHUT DOWN OF AIR HANDLING UNITS 4. IMPROVED WALL AND ROOF INSULATION PERFORMANCE 5. GLAzING SELECTION MAxIMIzES PASSIVE SOLAR HEAT GAIN REDUCING WINTERTIME HEATING LOADS 6. reDuceD interior LigHting tHrougH use oF HigH-eFFiciency LeD LigHt Fixtures 7. HigH eFFiciency 100% outsiDe Air VAV energy recoVery units 8. HIGH EFFICIENCY BOILERS 9. HIGHLY REFLECTIVE ROOF: REDUCES HEAT ISLAND EFFECT

  • 10. occupAncy sensors For LigHting AnD VentiLAtion
  • 11. ABUNDANT NATURAL DAYLIGHTING COUPLED WITH DAYLIGHT SENSORS REDUCES ELECTRICAL ENERGY CONSUMPTION
  • 12. operABLe winDows For nAturAL VentiLAtion: winDow sensors reDuce MecHAnicAL VentiLAtion to interior spAces wHen

WINDOWS ARE OPEN.

slide-47
SLIDE 47

BROOKLINE HIGH SCHOOL EXPANSION PAGE 47 APRIL 30, 2020

THIRD FLOOR RENOVATION

DW DW DW A1-02-D 1 A1-03-D 1 C L C L C L C L C L C L CLASSROOM 347 CLASSROOM 345 LEARNING CENTER 348 OFFICE 348A CLASSROOM 351 ACE SCIENCE 352 OFFICE 353B MECH 353A CLASSROOM 350 OFF. 354B OFF. 354C RECEP. 354 OFF. 354A MEETING ROOM 354D MEN'S RESTRM 358A WOMEN'S RESTRM 358B OFF. 357A CLASSROOM 357 CLASSROOM 358 CLASSROOM 359 CLASSROOM 360 CLASSROOM 361 COMP-SCI CLASSROOM 364 CLASSROOM 362 LEARNING CENTER 363 SE OFFICE 365 SE OFFICE 365A ELEV. IT ROOM 366A SE OFF. 366D SE OFF. 366C SE OFF. 366B COLLAB SPACE 366 SE CONFERENCE ROOM 369 BUSINESS CLASSROOM 370 ELL-SEI CLASSROOM 371 CLASSROOM 368 CLASSROOM 373 LEARNING CENTER TUTORIAL 374 CLASSROOM 378 CLASSROOM 379 CLASSROOM 372 EXCEL CAREER CENTER 375B EXCEL SCIENCE 375A EXCEL CLASSROOM 380A EXCEL CLASSROOM 380B EXCEL CLASSROOM 380C EXCEL WAITING AREA 376A EXCEL OFFICE 377B EXCEL OFFICE 377A OFFICE 367 C L NOT IN WORK AREA : NOT IN CONTRACT EXISTING WALLS WALLS TO BE CONSTRUCTED KEY NOT IN WORK AREA : COSMETIC IMPROVEMENTS ONLY CG CORNER GUARD GENERAL NOTES
  • 1. ALL DIMENSIONS ARE TO FACE OF WALL (NEW AND EXISTING)
UNLESS OTHERWISE NOTED.
  • 2. AFTER REMOVING WALL PAPER, SAND, PRIME, AND REPAINT
WALLS.
  • 3. FOR ROOMS WITH ONLY COSMETIC UPGRADES, SEE FINISH
PLAN FOR INFORMATION ON FINISHES.
  • 4. FOR ROOMS WITH ONLY COSMETIC UPGRADES, SEE RCPS
FOR INFORMATION ON CEILINGS.
  • 5. FOR ROOMS WITH ONLY COSMETIC UPGRADES,
THOROUGHLY CLEAN INSIDE AND OUTSIDE OF EXISTING MOBILE CASEWORK BEFORE PLACING BACK IN ROOMS. RE-URETHANE WOODEN TOPS OF MOBILE CASEWORK. N BROOKLINE, MA 02445 DATE: TOWN OF BROOKLINE BROOKLINE HIGH SCHOOL DRAWING TITLE: DRAWING NUMBER: SCALE: CHECKED BY: DRAWN BY: KEY PLAN: REVISIONS: © 2013 WILLIAM RAWN ASSOCIATES, ARCHITECTS, INC. PROJECT NORTH PROJECT D: THIRD FLOOR EXPANSION WRA PROJECT # 21706 ACOUSTICS & AUDIOVISUAL Acentech Inc. (617) 499-8000 33 Moulton Street Cambridge, MA 02138 CIVIL ENGINEER Nitsch Engineering, Inc. (617) 338-0063 2 Center Plaza, Suite 430 Boston, MA 02108-1928 MEP, FP, IT, SECURITY ENGINEER Rist-Frost-Shumway Engineering, P.C (603) 524-4647 71 Water Street Laconia, NH 03246 LANDSCAPE ARCHITECT Lemon Brooke LLC. (978) 222-3700 31 Oxbow Road Concord, MA 01742 STRUCTURAL ENGINEER Lemessurier Consultants (617) 868-1200 1380 Soldiers Field Road Boston, MA 02135 William Rawn Associates, Architects, INC. (617) 423-3470 10 Post Office Square, Suite 1010 Boston, Massachusetts 02109 ARCHITECT CODE CONSULTING Hastings Consulting (508) 397-8417 142 Hanlon Road Holliston, MA 01746 FOOD SERVICE CONSULTING Crabtree McGrath Associates, Inc. (978) 352-8500 161 W Main St, Georgetown, MA 01833 SURVEYOR Feldman Land Surveyors (617) 357-9740 152 Hampden St, Boston, MA 02119 SUSTAINABLITY CONSULTANT The Green Engineer, Inc. (617) 713-5098 54 Junction Square Drive Concord, MA 01742 GEOTECHNICAL ENGINEER McPhail Associates, LLC. (617) 868-1420 2269 Massachusetts Ave, Cambridge, MA 02140 INTERIOR DESIGN, FF&E Stefura Associates, Inc. (617) 723-5164 77 N. Washington Street Boston, MA 02114 COST ESTIMATOR PM&C Cost Estimating (781) 740-807 20 Downer Ave Suite 1C, Hingham, MA 02043 SPECIFICATIONS Kalin Associates (617) 964-5477 1121 Washington St, West Newton, MA 02465 HAZMAT/ABATEMENT Universal Environmental Consultants (508) 628-5486 12 Brewster Rd. Framingham, MA LIGHTING DESIGNER Horton Lees Brogden Lighting Design (857) 702-8830 233 Lewis Wharf Boston, MA 02110 MBTA STATION DESIGNER AECOM (617) 723-1700 1 Federal Street, 8th Floor Boston, MA 02110 01/31/2020 GMP BID SET 1/16" = 1'-0" 1/31/2020 1:38:43 PM D:\Local Revit\21706-BHS-THIRD FLOOR_adrummH5NLS.rvt

A1-01-D

Author Checker THIRD FLOOR OVERALL PLAN EXISTING COLUMN TO REMAIN 1/16" = 1'-0" THIRD FLOOR PLAN 1
  • REV. NO.
DATE REVISION

*SUBjECT TO BUDGET vOTE AT jUNE 2020 TOWN MEETING

slide-48
SLIDE 48

BROOKLINE HIGH SCHOOL EXPANSION PAGE 48 APRIL 30, 2020

690 SF ENG RES 710 SF SS RES 660 SF CR 670 SF CR 730 SF CR 950 SF CR 590 SF CR 1010 SF CR 570 SF CR 950 SF CR 580 SF CR 690 SF CR 630 SF CR 750 SF CR 740 SF CR 740 SF CR 720 SF CR 755 SF CR 740 SF CR 720 SF CR 740 SF LC 2220 SF BALC 740 SF CR 1940 SF BLACK BOX 1130 SF CHORUS 530 SF CR 510 SF CR 750 SF CR 640 SF CR 640 SF CR 650 SF CR BIO STOR 860 SF BIO CR 930 SF BIO CR 740 SF CR 490 SF CR 830 SF CR 730 SF BIO CR 690 SF AP CHEM LAB 1060 SF LAB AID BIO CR 890 SF BIO CR 950 SF BIO CR 650 SF CHEM CR 970 SF BIO CR 900 SF CHEM CR 970 SF BIO CR 690 SF CHEM CR 620 SF CHEM CR

460 SF STAFF LUNCH RM SILENT TEACHING RM

1020 SF CHEM CR 1240 SF PHYS CR 1090 SF PHYS/CHEM CR 910 SF CHEM CR 930 SF CHEM CR 1030 SF CHEM CR 800 SF CHEM CR 820 SF PHYS CR 840 SF PHYS CR 850 SF PHYS CR 820 SF COMP LAB 410 SF OFF

400 SF BOOK STOR 400 SF BOOK STOR DEAN’S BL TM MTG

580 SF BIO PREP

150 SF OFF 150 SF DEAN POON’S OFF

300 SF OFF 550 SF PHYS CR 440 SF CHEM STOR 550 SF PHYS

307 302 303 308 311 395 394 393 392 396 390 388 389 387 385A 385 384 383 382 381 386 313 314 318A 324 335C 336 341 343 344 340 342 346 345 348 347 360 354 357 358 359 360 362 361 364 363 367 366 370 371 375 376 379 378 372 372 369 368 380 377 352 351 353B 335B 335A 322 318A 332 312

50 SF OFF

310A

170 SF RECEPT

310 309 300 301

150 SF OFF

317K

140 SF OFF

317J

3Rd fLOOR RENOvAtION SCOPE

slide-49
SLIDE 49

BROOKLINE HIGH SCHOOL EXPANSION PAGE 49 APRIL 30, 2020

3Rd fLOOR RENOvAtION SCOPE

DW DW DW A1-02-D 1 A1-03-D 1 C L C L C L C L C L C L

CLASSROOM 347 CLASSROOM 345 LEARNING CENTER 348 OFFICE 348A CLASSROOM 351 ACE SCIENCE 352 OFFICE 353B MECH 353A CLASSROOM 350 OFF. 354B OFF. 354C RECEP. 354 OFF. 354A MEETING ROOM 354D MEN'S RESTRM 358A WOMEN'S RESTRM 358B OFF. 357A CLASSROOM 357 CLASSROOM 358 CLASSROOM 359 CLASSROOM 360 CLASSROOM 361 COMP-SCI CLASSROOM 364 CLASSROOM 362 LEARNING CENTER 363 SE OFFICE 365 SE OFFICE 365A ELEV. IT ROOM 366A SE OFF. 366D SE OFF. 366C SE OFF. 366B COLLAB SPACE 366 SE CONFERENCE ROOM 369 BUSINESS CLASSROOM 370 ELL-SEI CLASSROOM 371 CLASSROOM 368 CLASSROOM 373 LEARNING CENTER TUTORIAL 374 CLASSROOM 378 CLASSROOM 379 CLASSROOM 372 EXCEL CAREER CENTER 375B EXCEL SCIENCE 375A EXCEL CLASSROOM 380A EXCEL CLASSROOM 380B EXCEL CLASSROOM 380C EXCEL WAITING AREA 376A EXCEL OFFICE 377B EXCEL OFFICE 377A OFFICE 367

C L NOT IN WORK AREA : NOT IN CONTRACT EXISTING WALLS WALLS TO BE CONSTRUCTED

KEY

NOT IN WORK AREA : COSMETIC IMPROVEMENTS ONLY CG CORNER GUARD

GENERAL NOTES

  • 1. ALL DIMENSIONS ARE TO FACE OF WALL (NEW AND EXISTING)

UNLESS OTHERWISE NOTED.

  • 2. AFTER REMOVING WALL PAPER, SAND, PRIME, AND REPAINT

WALLS.

  • 3. FOR ROOMS WITH ONLY COSMETIC UPGRADES, SEE FINISH

PLAN FOR INFORMATION ON FINISHES.

  • 4. FOR ROOMS WITH ONLY COSMETIC UPGRADES, SEE RCPS

FOR INFORMATION ON CEILINGS.

  • 5. FOR ROOMS WITH ONLY COSMETIC UPGRADES,

THOROUGHLY CLEAN INSIDE AND OUTSIDE OF EXISTING MOBILE CASEWORK BEFORE PLACING BACK IN ROOMS. RE-URETHANE WOODEN TOPS OF MOBILE CASEWORK. N

BROOKLINE, MA 02445

DATE:

TOWN OF BROOKLINE

BROOKLINE HIGH SCHOOL

DRAWING TITLE: DRAWING NUMBER: SCALE: CHECKED BY: DRAWN BY: KEY PLAN: REVISIONS: © 2013 WILLIAM RAWN ASSOCIATES, ARCHITECTS, INC. PROJECT NORTH

PROJECT D: THIRD FLOOR EXPANSION

WRA PROJECT # 21706

ACOUSTICS & AUDIOVISUAL Acentech Inc. (617) 499-8000 33 Moulton Street Cambridge, MA 02138 CIVIL ENGINEER Nitsch Engineering, Inc. (617) 338-0063 2 Center Plaza, Suite 430 Boston, MA 02108-1928 MEP, FP, IT, SECURITY ENGINEER Rist-Frost-Shumway Engineering, P.C (603) 524-4647 71 Water Street Laconia, NH 03246 LANDSCAPE ARCHITECT Lemon Brooke LLC. (978) 222-3700 31 Oxbow Road Concord, MA 01742 STRUCTURAL ENGINEER Lemessurier Consultants (617) 868-1200 1380 Soldiers Field Road Boston, MA 02135 William Rawn Associates, Architects, INC. (617) 423-3470 10 Post Office Square, Suite 1010 Boston, Massachusetts 02109 ARCHITECT CODE CONSULTING Hastings Consulting (508) 397-8417 142 Hanlon Road Holliston, MA 01746 FOOD SERVICE CONSULTING Crabtree McGrath Associates, Inc. (978) 352-8500 161 W Main St, Georgetown, MA 01833 SURVEYOR Feldman Land Surveyors (617) 357-9740 152 Hampden St, Boston, MA 02119 SUSTAINABLITY CONSULTANT The Green Engineer, Inc. (617) 713-5098 54 Junction Square Drive Concord, MA 01742 GEOTECHNICAL ENGINEER McPhail Associates, LLC. (617) 868-1420 2269 Massachusetts Ave, Cambridge, MA 02140 INTERIOR DESIGN, FF&E Stefura Associates, Inc. (617) 723-5164 77 N. Washington Street Boston, MA 02114 COST ESTIMATOR PM&C Cost Estimating (781) 740-807 20 Downer Ave Suite 1C, Hingham, MA 02043 SPECIFICATIONS Kalin Associates (617) 964-5477 1121 Washington St, West Newton, MA 02465 HAZMAT/ABATEMENT Universal Environmental Consultants (508) 628-5486 12 Brewster Rd. Framingham, MA LIGHTING DESIGNER Horton Lees Brogden Lighting Design (857) 702-8830 233 Lewis Wharf Boston, MA 02110 MBTA STATION DESIGNER AECOM (617) 723-1700 1 Federal Street, 8th Floor Boston, MA 02110

01/31/2020 GMP BID SET

1/16" = 1'-0" 1/31/2020 1:38:43 PM D:\Local Revit\21706-BHS-THIRD FLOOR_adrummH5NLS.rvt

A1-01-D

Author Checker

THIRD FLOOR OVERALL PLAN

EXISTING COLUMN TO REMAIN

1/16" = 1'-0"

THIRD FLOOR PLAN

1

  • REV. NO.

DATE REVISION

3RD FLOOR RENOVATION PROGRAM

  • GENERAL USE CLASSROOMS
  • SPECIAL EDUCATION OFFICES
  • LEARNING CENTER
  • ACE SCIENCE CLASSROOM
  • ExCEL CLASSROOMS
slide-50
SLIDE 50

BROOKLINE HIGH SCHOOL EXPANSION PAGE 50 APRIL 30, 2020

TAPPAN RENOVATION

EXTENT OF EXISTING CANOPY ABOVE FOOTPRINT OF CURRENT DESIGN

PROPOSED DESIGN

*SUBjECT TO BUDGET vOTE AT jUNE 2020 TOWN MEETING

slide-51
SLIDE 51

BROOKLINE HIGH SCHOOL EXPANSION PAGE 51 APRIL 30, 2020

tAPPAN GYmNASIUm BUILdING: EXIStING CONdItIONS 1St fLOOR

e n c r e n c r

1670 SF POOL LKRM 1150 SF POOL LKRM 3410 SF GIRLS LKRM 2360 SF DANCE STUDIO 2700 SF FITNESS CENTER

KIRRANE POOL

STOR.

UP DN

slide-52
SLIDE 52

BROOKLINE HIGH SCHOOL EXPANSION PAGE 52 APRIL 30, 2020

fItNESS ROOm 3,100 NSf dANCE StUdIO COmm. ROOm KIRRANE POOL LOBBY

914 SF MEN'S LOCKER ROOM 1528 SF WOMEN'S LOCKER ROOM 121 SF OFFICE 218 SF 1ST-AID 3129 SF LAP POOL 1185 SF DIVING POOL 74 SF STOR. 384 SF STORAGE/ RECEIVING 248 SF STAIR 4 256 SF STAIR 3 132 SF STAFF LOCKER 253 SF STOR. 2378 SF DANCE STUDIO 180 SF STOR. 377 SF STAIR 2 812 SF CLASSROOM 355 SF CORRIDOR 82 SF MENS ROOM 85 SF UNI SHOWER 28 SF T 93 SF UNI SHOWER 3' - 5 3/4" 947 SF WADING POOL 76 SF OFFICE OPEN TO BELOW 77 SF WOMEN'S ROOM

TAPPAN STREET SUMNER ROAD

156 SF STORAGE MECH Option Conflict FITNESS CENTER 117 SF VESTIBULE 124 SF MENS ROOM WORKOUT LANE DN UP 57 16 847 SF COMMUNITY WELLNESS CENTER 109 SF STORAGE 129 SF STORAGE 69 SF UNISEX TOILET 168 SF WOMENS BATHROOM 139 SF WOMENS BATHROOM 112 SF T 114 SF T 56 SF JAN CL Option Conflict WOMENS LOCKER ROOM 168 SF MENS BATHROOM

1/8" = 1'-0"

LEVEL 1 FLOOR PLAN

11/15/2019

REMOVE FROM LIGHT RENOVATION SCOPE

TAPPAN RENOVATION: 1ST FLOOR PLAN

FITNESS CENTER COMM. ROOM LOBBY kIRRANE POOL

slide-53
SLIDE 53

BROOKLINE HIGH SCHOOL EXPANSION PAGE 53 APRIL 30, 2020

2366 SF WRESTLING 256 SF STAIR 155 SF STAIR 69 SF FAN ROOM 201 SF CORR. 301 SF MECH 140 SF JAN CL. 253 SF STO. 253 SF MECH 364 SF MECH ROOM 200 SF CORR. 171 SF STAIR 2941 SF DANCE STUDIO 43' - 0" 633 SF TRAINING ROOM 23 SF STO. 43 SF STO. 83 SF SWITCHGEAR 293 SF BAG DROP 1101 SF TRAINING ROOM 44 SF STORAGE 44' - 4 5/8" 590 SF OPEN OFFICE 176 SF GN LOCKER 78 SF CORR 27 SF J CL 89 SF CORR 201 SF JAN OFFICE 410 SF GN LOCKER 19 SF STOR 1759 SF MENS LOCKER ROOM 135 SF T 260 SF COACH OFF 260 SF MENS BATHROOM 41 SF STOR 41 SF STOR 34 SF STOR 36 SF STOR 36 SF STOR 34 SF STOR 246 SF DIRECTOR'S OFFICE 379 SF TEAM LOCKER ROOM

1/8" = 1'-0"

BASEMENT LEVEL FLOOR PLAN

11/15/2019

GARDEN

TAPPAN RENOVATION: LOWER LEVEL PLAN

slide-54
SLIDE 54

BROOKLINE HIGH SCHOOL EXPANSION PAGE 54 APRIL 30, 2020

TAPPAN STREETSCAPE

*SUBjECT TO BUDGET vOTE AT jUNE 2020 TOWN MEETING

slide-55
SLIDE 55

BROOKLINE HIGH SCHOOL EXPANSION PAGE 55 APRIL 30, 2020

CAmPUS PLAN

STEM WING CYPRESS BUILDING TAPPAN / kIRRANE UAB BHS

slide-56
SLIDE 56

BROOKLINE HIGH SCHOOL EXPANSION PAGE 56 APRIL 30, 2020

PEdEStRIAN ImPROvEmENtS

kEY IMPROVEMENTS

  • 1. WIDEN TAPPAN STREET SIDEWALK

A major pedestrian sidewalk links the new Cypress Building with the main high school building.

  • 2. RAISE CROSSWALKS ALONG TAPPAN STREET

Raised crosswalks calm traffjc and provide safer crossings at the UAB build- ing and new Cypress Building.

  • 3. DIRECT CONNECTION TO THE MBTA STATION

A direct pedestrian path links Davis Street to the Brookline Hills T statjon.

  • 4. SEATING AND GATHERING ALONG TAPPAN

New seatjng areas at STEM, Tappan/Kirrane, UAB, and the MBTA plaza welcome pedestrians and provide gathering and waitjng areas for stu- dents, stafg, and the community.

  • 5. CURB BULB OUTS ALONG TAPPAN STREET

New curb bulb outs slow traffjc and defjne drop-ofg areas increasing pedes- trian safety.

slide-57
SLIDE 57

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 57

ExISTING CONDITION: AN INCONSISTENT & UNWELCOMING ExPERIENCE

1/64” = 1’-0”

  • Width of sidewalk is inconsistent along Tappan Street
  • current sidewalk width (6’ wide generally) will not be suffjcient for traffjc fmow to & from new cypress building

EXISTING RAISED CROSSING EXISTING CROSSING WIDTH OF SIDEWALK IS INCONSISTENT ALONG TAPPAN STREET SHORTAGE OF BIKE RACKS ON CAMPUS 4’ WALL IN FRONT OF TAPPAN GYM WITH NO gUarDrail: Not to coDE TRAFFIC WORSENED BY DisorDErly Drop-oFF at PEAK HOURS 6’ 7’ 5.5’ 14’ 53 SCHOOL PARkING SPACES 32 SCHOOL SPACES 8 MBTA PARkING SPACES

UAB kIRRANE POOL TAPPAN GYM

slide-58
SLIDE 58

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 58

CREATE A UNIFIED CAMPUS: A TRANSFORMED TAPPAN STREETSCAPE

RAISED CROSSING NEW DESIGNATED Drop-oFF arEa 17 BIKE RACKS + 15 BLUE BIKE SPACES NEW MBTA / CYPRESS BUILDING ENTRY PLAzA WIDENED CROSSWALK TO FACILITATE SAFER STUDENT crossiNg & Mbta accEss 2’ sEat Wall & HaNgoUt SPACE IN FRONT OF TAPPAN GYM 2’ SEAT WALL IN FRONT OF NEW CYPRESS BUILDING 11’ 11’ 11’

  • the sidewalk has been increased from 6’ to 11’ wide contjnuously, with an additjonal 4’ of plantjng and seatjng zone
  • New trees along tappan street create contjnuity with greenough facades
  • Benches along Greenough Street popular with students; concept brought to Tappan Street

42 pArking spAces 6 SCHOOL SPACES 10 SCHOOL SPACES 8 MBTA SPACES biKE laNE & “boX” @ INTERSECTION OF TAPPAN STREET AND CYPRESS STREET NEW CYPRESS BUILDING UNIFIED ARTS BUILDING kIRRANE POOL TAPPAN GYMNASIUM TAPPAN STREET PARKLET SEATING AREA WIDENED SIDEWALK AT CORNER OF TAPPAN AND CYPRESS

slide-59
SLIDE 59

BROOKLINE HIGH SCHOOL EXPANSION PAGE 59 APRIL 30, 2020

CYCLING ImPROvEmENtS

kEY IMPROVEMENTS

  • 1. COMPLETE GREEN ROUTES AT BROOKLINE HIGH

Bike lanes on Davis, Greenough, and Tappan link Brookline’s Green Routes around the Cypress Field

  • 2. IMPROVE BIKE SAFETY ON BHS ROADWAYS FOR THE

COMMUNITY

Bike lanes on Davis St, Greenough Street, and Tappan Street improve bicy- cle safety.

  • 3. INCREASE BIKE PARKING CAPACITY BY 67%

89 bike parking spaces have been added to the BHS campus.

slide-60
SLIDE 60

BROOKLINE HIGH SCHOOL EXPANSION PAGE 60 APRIL 30, 2020

CYCLING ImPROvEmENtS: BIKE LANES

STEM WING CYPRESS BUILDING TAPPAN / kIRRANE UAB

1 2 4 3

slide-61
SLIDE 61

BROOKLINE HIGH SCHOOL EXPANSION PAGE 61 APRIL 30, 2020

B

STEM WING CYPRESS BUILDING TAPPAN / kIRRANE UAB

A D

CYPRESS STREET

23 Bikes 72 Bikes 32 Bikes* 42 Bikes 21 Bikes 18 BIkES 10 Bikes 6 BIkES TOTAL BIkE PARkING SPACES:

224

E

*32 BIKE pARKING SpACES + 15 BlUE BIKES

F B D E F A C C H H G G G

yElloW + RED SyMBol INDICATES NEW BIKE pARKING

EXIStING BIKE PARKING At BHS / mBtA PLAzA / CYPRESS fIELd

slide-62
SLIDE 62

BROOKLINE HIGH SCHOOL EXPANSION PAGE 62 APRIL 30, 2020

DEFERRED MAINTENANCE

*SUBjECT TO BUDGET vOTE AT jUNE 2020 TOWN MEETING

  • MAin H.s. BuiLDing eLeVAtor repLAceMent (5 eLeVAtors)
  • NEW BOILERS IN UAB
  • FIRE PROTECTION UPGRADES
  • Fire ALArM repLAceMent* (now in steM project)
  • HEAT ExCHANGER REPLACEMENT
  • BELOW GRADE OIL TANk REMOVAL BETWEEN TAPPAN & UAB
  • PUMPS VFD REPLACEMENT
slide-63
SLIDE 63

BROOKLINE HIGH SCHOOL EXPANSION PAGE 63 APRIL 30, 2020

MBTA PLAzA & BROOkLINE HILLS PLATFORM

slide-64
SLIDE 64

BROOKLINE HIGH SCHOOL EXPANSION PAGE 64 APRIL 30, 2020

mBtA PLAzA ANd BROOKLINE HILLS StAtION RENOvAtION

slide-65
SLIDE 65

BROOKLINE HIGH SCHOOL EXPANSION PAGE 65 APRIL 30, 2020

mBtA / CYPRESS BUILdING PLAzA EXIStING CONdItION

slide-66
SLIDE 66

BROOKLINE HIGH SCHOOL EXPANSION PAGE 66 APRIL 30, 2020

mBtA / CYPRESS BUILdING PLAzA dESIGN UPdAtE

vIEw fROm tAPPAN St CROSSwALK

slide-67
SLIDE 67

BROOKLINE HIGH SCHOOL EXPANSION PAGE 67 APRIL 30, 2020

mBtA / CYPRESS BUILdING PLAzA dESIGN UPdAtE

AERIAL vIEw

slide-68
SLIDE 68

BROOKLINE HIGH SCHOOL EXPANSION PAGE 68 APRIL 30, 2020

construction pHotos - steM wing

slide-69
SLIDE 69

BROOKLINE HIGH SCHOOL EXPANSION PAGE 69 APRIL 30, 2020

steM construction progress pHoto - septeMBer 2019

slide-70
SLIDE 70

BROOKLINE HIGH SCHOOL EXPANSION PAGE 70 APRIL 30, 2020

steM enABLing construction progress pHoto - septeMBer 2019

slide-71
SLIDE 71

BROOKLINE HIGH SCHOOL EXPANSION PAGE 71 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: STEM PROGRESS PHOTOS

STEM PROGRESS PHOTOS STEM PROGRESS PHOTOS STEM PROGRESS PHOTOS

steM construction progress pHoto - jAnuAry 2020

slide-72
SLIDE 72

BROOKLINE HIGH SCHOOL EXPANSION PAGE 72 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: STEM PROGRESS PHOTOS

STEM PROGRESS PHOTOS STEM PROGRESS PHOTOS STEM PROGRESS PHOTOS

steM construction progress pHoto - MArcH 2020

slide-73
SLIDE 73

BROOKLINE HIGH SCHOOL EXPANSION PAGE 73 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: STEM PROGRESS PHOTOS

STEM PROGRESS PHOTOS STEM PROGRESS PHOTOS STEM PROGRESS PHOTOS

steM construction progress pHoto - MArcH 2020

slide-74
SLIDE 74

BROOKLINE HIGH SCHOOL EXPANSION PAGE 74 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: STEM PROGRESS PHOTOS

STEM PROGRESS PHOTOS STEM PROGRESS PHOTOS STEM PROGRESS PHOTOS

steM construction progress pHoto - MArcH 2020

slide-75
SLIDE 75

BROOKLINE HIGH SCHOOL EXPANSION PAGE 75 APRIL 30, 2020

steM construction progress pHoto - ApriL 2020

slide-76
SLIDE 76

BROOKLINE HIGH SCHOOL EXPANSION PAGE 76 APRIL 30, 2020

steM construction progress pHoto - ApriL 2020

slide-77
SLIDE 77

BROOKLINE HIGH SCHOOL EXPANSION PAGE 77 APRIL 30, 2020

construction pHotos - cypress BuiLDing

slide-78
SLIDE 78

BROOKLINE HIGH SCHOOL EXPANSION PAGE 78 APRIL 30, 2020

cypress construction progress pHoto - septeMBer 2019

slide-79
SLIDE 79

BROOKLINE HIGH SCHOOL EXPANSION PAGE 79 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: CYPRESS PROGRESS PHOTOS

CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS

cypress construction progress pHoto - jAnuAry 2020

slide-80
SLIDE 80

BROOKLINE HIGH SCHOOL EXPANSION PAGE 80 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: CYPRESS PROGRESS PHOTOS

CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS

cypress construction progress pHoto - jAnuAry 2020

slide-81
SLIDE 81

BROOKLINE HIGH SCHOOL EXPANSION PAGE 81 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: CYPRESS PROGRESS PHOTOS

CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS

cypress construction progress pHoto - jAnuAry 2020

slide-82
SLIDE 82

BROOKLINE HIGH SCHOOL EXPANSION PAGE 82 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: CYPRESS PROGRESS PHOTOS

CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS

cypress / MBtA ocs construction progress pHoto - MArcH 2020

slide-83
SLIDE 83

BROOKLINE HIGH SCHOOL EXPANSION PAGE 83 APRIL 30, 2020

cypress construction progress pHoto - MArcH 2020

slide-84
SLIDE 84

BROOKLINE HIGH SCHOOL EXPANSION PAGE 84 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: CYPRESS PROGRESS PHOTOS

CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS

cypress construction progress pHoto - MArcH 2020

slide-85
SLIDE 85

BROOKLINE HIGH SCHOOL EXPANSION PAGE 85 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: CYPRESS PROGRESS PHOTOS

CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS

cypress construction progress pHoto - MArcH 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: BROOKLINE HIGH SCHOOL EXPANSION PROJECT: CYPRESS PROGRESS PHOTOS

CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS CYPRESS PROGRESS PHOTOS

slide-86
SLIDE 86

BROOKLINE HIGH SCHOOL EXPANSION PAGE 86 APRIL 30, 2020

cypress construction progress pHoto - ApriL 2020

slide-87
SLIDE 87

BROOKLINE HIGH SCHOOL EXPANSION PAGE 87 APRIL 30, 2020

cypress construction progress pHoto - ApriL 2020

slide-88
SLIDE 88

BROOKLINE HIGH SCHOOL EXPANSION PAGE 88 APRIL 30, 2020

cypress construction progress pHoto - ApriL 2020

slide-89
SLIDE 89

BROOKLINE HIGH SCHOOL EXPANSION PAGE 89 APRIL 30, 2020

PROjECt SCHEdULE

Brookline High School Expansion Overall Project Schedule

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

CONCEPT DESIGN (HMFH Architects) PROGRAMMING (WRA) SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION PROGRAM VERIFICATION SCHEMATIC DESIGN CONCEPT DESIGN HMFH ARCHITECTS DESIGN DEVELOPMENT CONSTRUCTION CD PHASE 2016 2017 2018 2019 2020 2021

slide-90
SLIDE 90

BROOKLINE HIGH SCHOOL EXPANSION PAGE 90 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT 3 MONTH LOOK AHEAD SCHEDULE

WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK5 WEEK 3 WEEK 4 4-May 5/112020 18-May 25-May 1-Jun 8-Jun 15-Jun 22-Jun 29-Jun 19-Jul 26-Jul Stair 1 Impacts due to COVID not realized or fully understood are not reflected in the above information. CONSTRUCTABILITY FAÇADE MOCK UP DESIGN AND CONSTRUCTION STRUCTURAL STEEL AND PRECAST ERECTION CONCRETE FOUNDATIONS AND WALLS WATERPROOFING

June

WEEK 1 WEEK 2 5-Jul 12-Jul SUBCONTRACT PROCUREMENT AND SUBMITTAL APPROVAL MISCELLANEOUS SITE UTILITIES

111 CYPRESS ST

BACK FILL WALLS AND FOUNDATIONS MEP COORDINATION

May July

slide-91
SLIDE 91

BROOKLINE HIGH SCHOOL EXPANSION PAGE 91 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT 3 MONTH LOOK AHEAD SCHEDULE

WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK5 WEEK 3 WEEK 4 4-May 5/112020 18-May 25-May 1-Jun 8-Jun 15-Jun 22-Jun 29-Jun 19-Jul 26-Jul L1 SLAB ON DECK INSTALL STAIR 1 MEP COORDINATION IN PLACE FAÇADE MOCK UP CONSTRUCTION STRUCTURAL STEEL AND PRECAST CONCRETE ERECTION PREP & PLACE SLAB ON DECK MISC SITEWORK AND FOUNDATIONS

STEM ADDITION

SUBCONTRACT PROCUREMENT AND SUBMITTAL APPROVAL WEEK 1 WEEK 2 5-Jul 12-Jul

May June July

CONCRETE FOUNDATUIONS

slide-92
SLIDE 92

BROOKLINE HIGH SCHOOL EXPANSION PAGE 92 APRIL 30, 2020

BROOKLINE HIGH SCHOOL EXPANSION PROJECT 3 MONTH LOOK AHEAD SCHEDULE

WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK5 WEEK 3 WEEK 4 4-May 5/112020 18-May 25-May 1-Jun 8-Jun 15-Jun 22-Jun 29-Jun 19-Jul 26-Jul INSTALL DUCTBANKS AND REFEED BUNGALOWS DEMO/RE-FEED EXIST MBTA PLATFORM SYS. DEMO & ROUGH GRADE

MBTA WORK

PLATFORM: SUBCONTRACT PROCUREMENT AND SUBMITTAL APPROVAL

May June July

WEEK 1 WEEK 2 5-Jul 12-Jul

slide-93
SLIDE 93

BROOKLINE HIGH SCHOOL EXPANSION PAGE 93 APRIL 30, 2020

BUDGET

slide-94
SLIDE 94

BROOKLINE HIGH SCHOOL EXPANSION APRIL 30, 2020 PAGE 94

  • 1. Hard Costs

New Cypress Street Building New STEM Building 3rd Floor renovatjon Deferred Maintenance tappan gym renovatjons constructjon contjngency

  • 2. sofu costs

Professional Fees Commissioning Agent cM at risk preconstructjon Utjlity costs testjng agents Moving Costs project contjngency

  • 3. FF&e & technology

Furniture Fixtures and Equipment A/V equipment IT and Telephone

  • 4. Real Estate Costs

cypress street acquisitjon & relocatjon MBTA Air Rights

  • 5. Other Costs

Campus Landscaping, Sidewalks and Student Safety Swing Space at Old Lincoln School real Estate contjngencies

  • 6. cypress Field

total preliminary project costs $137.6 Million $23.6 Million $5.5 Million $23.5 Million $9.6 Million $5.8 Million $205.6 Million

  • riginAL BuDget ApproVeD During 2018 town Meeting
slide-95
SLIDE 95

BROOKLINE HIGH SCHOOL EXPANSION PAGE 95 APRIL 30, 2020

BuDget AnD cost estiMAting History prior to 2018 town Vote

  • 1. concept Design cost estiMAte

(HMFH) spring 2017

  • 2. scHeMAtic Design cost estiMAte (pM+c / wrA) FeBruAry 2018
slide-96
SLIDE 96

BROOKLINE HIGH SCHOOL EXPANSION PAGE 96 APRIL 30, 2020

BuDget AnD cost estiMAting History AFter 2018 town Vote

  • 1. project BuDget (town Vote) MAy 2018
  • 2. construction MAnAger HireD june 2018
  • 3. reconciLeD gooD FAitH sD estiMAte octoBer 2018
  • 4. Design DeVeLopMent estiMAte

jAnuAry 2019

  • 5. 60% construction cost estiMAte MAy 2019
  • 6. First eArLy BiD pAckAge issueD

jAnuAry 2019

slide-97
SLIDE 97

BROOKLINE HIGH SCHOOL EXPANSION PAGE 97 APRIL 30, 2020

CONTINUOUS DUAL ESTIMATING AND VALUE MANAGEMENT EFFORTS

  • 1. DESIGN DEVELOPMENT ESTIMATE

HARD COSTS $133.5 M VALUE MANAGEMENT

  • $3.2 M (47 accepted VE items)

soFt costs (iNclUDEs $5.8 For cyprEss FiElD) $75.3 M totAL: $205.6 M

  • 2. 60% construction cost estiMAte

HARD COSTS $136.2 M VALUE MANAGEMENT

  • $4.8 M (43 accepted VE items)

soFt costs (iNclUDEs $5.8 For cyprEss FiElD) $74.2 M totAL: $205.6 M

  • 3. CURRENT PROJECTED COST

gMp HarD costs (cyprEss, stEM, ElEvator MoDErNizatioN, Mbta (gMp UNDEr rEviEW) $145.6 M

EstiMatED HarD costs (tappaN, 3rD Floor, DEFErrED MaiNtENaNcE, strEEtscapE)

$22.6 M*

EstiMatED HarD cost (cyprEss FiElD)

$5.8 M *

SOFT COSTS

$63.8 M totAL: $237.8 M**

* NOT BID yET ** DoES NoT INClUDE CoST oR SCHEDUlE IMpACTS ASSoCIATED WITH CoVID-19 AND TEMpoRARy SUSpENSIoN of MBTA opERATIoNAl SUppoRT.

slide-98
SLIDE 98

BROOKLINE HIGH SCHOOL EXPANSION PAGE 98 APRIL 30, 2020

WHAT CHANGED?

  • 1. UNPRECEDENTED ESCALATION IN THE CONSTRUCTION MARkET
  • 2. UNkNOWN CONDITIONS
  • 3. steM BAseMent LeVeL (ADDeD scope, reDuceD risk)
  • 4. coMMunity Meetings - MBtA pLAzA (ADDeD scope)
  • 5. work ArounD AnD For tHe MBtA (ADDeD scope)
  • bUilDiNg rEqUirEMENts
  • sitE accEss / DivErsioNs
  • statioN DEsigN
slide-99
SLIDE 99

BROOKLINE HIGH SCHOOL EXPANSION PAGE 99 APRIL 30, 2020

mARKEt SOURCE: mSBA wEBSItE

Graph from MSBA Website : http://info.massschoolbuildings.org/TabPub/TableauCostData.aspx

slide-100
SLIDE 100

BROOKLINE HIGH SCHOOL EXPANSION PAGE 100 APRIL 30, 2020

mSBA PROjECt COmPARISONS

SCHOOL NEw OR RENO/Add COSt/Sf GmP wALtHAm SR HIGH SCHOOL NEw $722 APR 2021 wEStBOROUGH ELEmENtARY NEw $652 mAY 2020 BOStON ARtS ACAdEmY NEw $652 jAN 2020 ARLINGtON HIGH SCHOOL NEw $577 dEC 2020 fRAmINGHAm fULLER mIddLE SCHOOL NEw $573 jAN 2020 BROOKLINE HIGH SCHOOL EXPANSION BLENdEd $570 mAR 2020 (70% NEw / 30% RENO) BELmONt HIGH SCHOOL NEw $521 mAR 2020 wEYmOUtH mARIA wEStON m.S. NEw $510 SEP 2020 NAUSEt HIGH SCHOOL RENO/Add $489 mAY 2021

slide-101
SLIDE 101

BROOKLINE HIGH SCHOOL EXPANSION PAGE 101 APRIL 30, 2020

WHERE ARE WE NOW

Project Budget Projected Costs Variance over/(under)

Hard Costs $137.6 Million $161.6 Million $24 Million

New Cypress Street Building New STEM Building 3rd Floor Renovation Deferred Maintenance Tappan Gym Renovations & Front Addition Construction Contingency

Soft Costs $23.6 Million $23.3 Million ($0.3) Million

Professional Fees Commissioning Agent CM at Risk Preconstruction Utility Costs Testing Agents Moving Costs Project Contingency

FF&E & Technology $5.5 Million $4.8 Million ($0.7) Million

Furniture Fixtures and Equipment A/V equipment IT and Telephone

Real Estate Costs $23.5 Million $38.9 Million $15.4 Million

Cypress Street Acquisition & Relocation MBTA Air Rights & Station Improvements Real Estate Contingencies

Other Costs $9.6 Million $3.4 Million ($6.2) Million

Campus Landscaping, Sidewalks and Student Safety Swing Space at Old Lincoln School

Cypress Field $5.8 Million $5.8 Million N/A Total Project Costs $205.6 Million $237.8 Million $32.2 Million

* noT BiD yeT **noT inCluDeD - unknoWn CoviD 19 iMPACTS: MBTA TeMPorArily SuSPenDinG STAff SuPPorT for ProjeCT DiverSion for 3 WeekS

* * * * * * **

slide-102
SLIDE 102

BROOKLINE HIGH SCHOOL EXPANSION PAGE 102 APRIL 30, 2020

CHOICES TO BE MADE

  • INCREASE FUNDING THROUGH TOWN MEETING
  • PURSUE MBTA COST SHARING
  • ALREADY REMOVED SCOPES OF WORk

REDUCED TAPPAN RENOVATION REDUCED 3RD FLOOR RENOVATION

  • REMOVE SCOPES OF WORk

TAPPAN RENOVATION 3RD FLOOR RENOVATION DEFERRED MAINTENANCE CYPRESS FIELD

slide-103
SLIDE 103

BROOKLINE HIGH SCHOOL EXPANSION PAGE 103 APRIL 30, 2020

ENd