" Hydropower Norway 2017 Make Hydropower Great Again "! Benefits from technological advances in hydropower Fredrik Ringnes April 25th 2017 About Rainpower Rainpower is an experienced project organisation based on Norwegian


  1. " Hydropower Norway 2017 – Make Hydropower Great Again "! Benefits from technological advances in hydropower Fredrik Ringnes April 25th 2017

  2. About Rainpower Rainpower is an experienced project organisation based on Norwegian technology. Rainpower is specialised in Hydro Power industry. Our main area of expertise is development and production of turbines, valves and control systems Our portfolio covers new power • Head office at Kjeller, Norway plants, rehabilitation, upgrade as • 100% Norwegian ownership well as service and spare parts. • 200 employees in six countries • Revenue in 2016: 510 MNOK

  3. Rainpower Locations Northern Europe Kjeller, Norway Headquarter & Technological Centre Trondheim, Norway Turbine laboratory Northern Europe Sørumsand, Norway Fabrication & Service Kristinehamn, Sweden Sales & project office Oslo, Norway Control systems Central Europe Baden, Sales & project Switzerland office Eastern Europe / Asia Istanbul, project Turkey office South East Asia North & South Hangzhou, Supply & Engineering America China Sales & project office Project based Africa Mozambique Project office

  4. The international competition is challenging Ø The industry is a moving circus (Andes/Rockies/Himalaya) -> The challenge to be local, but act global -> CSR/Compliance/Financing Ø An everyday world championship for best turbine efficiency -> At lowest price ! Ø The big bet for each competition -> How to pick the best partners and be the winning team *Lindeberg, NEF Teknisk Møte 2014

  5. New challenges for the turbine manufacturers Low electricity prices • Changes in the • operations of the plants – Unbalanced power into the grid – Frequency Restoration Reserve (FRR) – Start/ stop *Lindeberg, NEF Teknisk Møte 2014

  6. The winner takes it all-> must be best in class ! New calculation tools New production methods • • Dynamic stresses T-Blade francis – – runners Mechanical integrity – Cavitation – waterway –

  7. Sales->Execution->Reputation->Sales «say-do ratio» 96 95 94 93 New guaranteed efficiency 92 New measured efficiency 91 90 89 88 0 100 200 300 400 500 600

  8. Rainpower current R&D programs Robotic welding of Francis Runners q Energi X q Why do High Head Francis runners crack? – Basic models ready – Requires real time testing at power plants – Lifetime expectancy, project with Statkraft q Prediction models for lifetime of runners – Commercialisation in 2018 – Monitoring of turbine/generator/governor q OH YES-BIG DATA ! ü Connexi q New tech. platform for governor systems – In stock in 2017 –

  9. High head Francis - HiFrancis Secure reliable operation • and lifetime for high head Francis turbines operating in the future energy market. Common R&D effort • – power utilities – Turbine manufacturers – Consultants – University Supported by government • funds source;: NTNU

  10. New Challenges also gives great opportunities Installed capacity MW Amounts of plants Average year start Share older than 40 Refurbishment rate in Main turbine type commercial operation years in MW MW Austria 12 617 579 1976 40% 4,2% Pelton France 24 345 957 1966 54% 1,4% Francis Italy 21 417 1190 1964 56% 5,1% Pelton Portugal 5 145 169 1972 33% 1,3% Francis Romania 6 604 414 1983 27% 0,02% Kaplan Spain 18 080 848 1962 57% 1,0% Francis Sweden 16 950 652 1963 60% 1,6% Francis Switzerland 13 918 644 1970 64% 9,9% Pelton Slovenia 1 155 87 1966 43% 0,7% Kaplan Croatia 2 108 36 1963 46% 2,3% Francis Albania 1 483 93 1973 24% 0,1% Francis Georgia 2 798 62 1962 36% 0,2% Francis Turkey 17 645 303 1992 5% 0,2% Francis Source: Intpow Average age of equipment: 45 years (2015 no’s)

  11. Upgrade Case – Røldal Power Plant Production Power Output (GWh) (MW) 1050 95 1000 90 950 85 900 80 850 800 75 Before After Before After +12,2% +13,4% … equivalent to 10 small hydro plants or 20 wind mills or some xx footballpitches PV

  12. Thank you www.rainpower.no

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.