Barrett Lakes Blvd & Big Shanty Road Corridor Studies Meeting - - PowerPoint PPT Presentation
Barrett Lakes Blvd & Big Shanty Road Corridor Studies Meeting - - PowerPoint PPT Presentation
Stakeholder Committee Kickoff September 12, 2018 Barrett Lakes Blvd & Big Shanty Road Corridor Studies Meeting Agenda 1. Introductions Study Team Stakeholders 2. Study Overview 3. Role of the Stakeholder Committee 4.
Meeting Agenda
1. Introductions
- Study Team
- Stakeholders
2. Study Overview 3. Role of the Stakeholder Committee 4. Study Focus Areas 5. Existing Conditions 6. Listening Session: Study Goals & Objectives 7. Next Steps/Study Timeline
Study Objectives
- Understand short-term and long-term transportation needs
- f each corridor
- Identify and evaluate a broad range of multi-modal
improvements to:
- Improve mobility, connectivity, and safety for all users
- Support adjacent land uses
- Integrate people and places into a ‘Complete Streets’
transportation network
Study Area
Barrett Lakes Blvd Big Shanty Road
Role of the Stakeholder Committee
- Provide input and feedback on:
➢ Corridor needs ➢ Study goals and objectives ➢ Study recommendations
- Provide an assessment of study findings for consistency
with community perspectives
- Promote community awareness of these corridor studies
Study Focus pedestrian/bicycle
- Safety
- Facilities
- Amenities
- Destinations
Study Focus roadway/intersection
- Safety
- Mobility
- Traffic congestion
- Access
management
Study Focus roadway/intersections
- Truck traffic
- Effect of Express
lanes
- Complete streets
Study Focus transit
- Big Owl Bus
- Cobb Linc
- GRTA Xpress
Existing Conditions
Traffic Count Locations
Existing Conditions
Crash Analysis
- Frequency
- Severity
- Type
- Trends
Existing Conditions
Crash Analysis
- Frequency
- Severity
- Type
- Trends
Listening Session
goals & objectives
- What is important to you?
- What is your vision for the corridor(s)?
- What types of recommendations would you like to see?
reduced congestion aesthetics travel times ped/bike safety streetscape ped/bike facilities transit service access to interstate economic development truck traffic multi-use trails access management support development trends reduced auto- dependency
Study Timeline
Needs Assessment
- Confirm goals & objectives
- Traffic forecast and analysis
- Future conditions analysis
Alternatives
- Develop alternatives
- Short term needs
- Long term needs
Recommendations
- Finalize project recommendations
- Prioritize recommendations
- Document
Stakeholder Meetings Public Meetings
- Goals & objectives for corridor
- Data collection
- Existing conditions assessment
Existing Conditions