Bank Regulation and Stability: An Examination of the Basel Market - - PowerPoint PPT Presentation

bank regulation and stability an examination of the basel
SMART_READER_LITE
LIVE PREVIEW

Bank Regulation and Stability: An Examination of the Basel Market - - PowerPoint PPT Presentation

Bank Regulation and Stability: An Examination of the Basel Market Risk Framework Gordon J. Alexander Alexandre M. Baptista Shu Yan University of The George Washington University of University Minnesota South Carolina October 20, 2011


slide-1
SLIDE 1

Bank Regulation and Stability: An Examination of the Basel Market Risk Framework

October 20, 2011 Basel III and Beyond: Regulating and Supervising Banks in the Post-Crisis Era Jointly organized by the Deutsche Bundesbank and the Centre for European Economic Research (ZEW) Gordon J. Alexander University of Minnesota Alexandre M. Baptista The George Washington University Shu Yan University of South Carolina

slide-2
SLIDE 2

2

  • 1. Motivation
  • Bank regulators:

– Value-at-Risk (VaR) is used to measure the risk in the trading books of large banks and to determine the corresponding minimum capital requirements; – Stress Testing (ST) is used to assess whether banks withstand ‘extreme’ events.

  • Practitioners:

– Banks use VaR and ST to set risk exposure limits (survey of Committee on the

Global Financial System, 2005).

  • Researchers:

– VaR is not sub-additive; – VaR does not consider losses beyond VaR; – Advocate Conditional-Value-at-Risk (CVaR): it is sub-additive, and considers losses beyond VaR.

  • Our paper:

– Examines the extent of the conflict between: (1) the popularity of VaR and ST among regulators and practitioners; and (2) the advocacy of CVaR by researchers. – More specifically, we examine the effectiveness of a risk management system based on both VaR and ST constraints in controlling CVaR. – Put differently: is the joint use of VaR and ST ‘equivalent’ to the use of CVaR?

slide-3
SLIDE 3
  • 2. Main result
  • The joint use of VaR and ST constraints allows the selection of

portfolios with relatively large CVaRs.

  • Hence, the joint use of VaR and ST constraints is ineffective in

controlling CVaR.

  • This result is consistent with:

− Banks around the world suffered sizeable trading losses during the recent crisis. − Trading losses notably exceeded VaR (and even minimum capital requirements).

  • Our paper supports the view that the Basel market risk framework

did not promote bank stability.

3

slide-4
SLIDE 4
  • 3. VaR, CVaR, and ST

For simplicity, consider a portfolio with a normally distributed return:

Return

95%

confidence level

VaR at the 95% confidence level (maximum loss under ‘normal’ conditions)

4

slide-5
SLIDE 5

95%

Return confidence level

VaR at the 95% confidence level (maximum loss under ‘normal’ conditions) CVaR= E [ loss | loss ≥ VaR] (expected loss under ‘abnormal’ conditions)

5

  • 3. VaR, CVaR, and ST

For simplicity, consider a portfolio with a normally distributed return:

slide-6
SLIDE 6

95%

Losses in ST events (e.g., crash of 87 and 9/11)

Return confidence level

VaR at the 95% confidence level (maximum loss under ‘normal’ conditions)

6

CVaR= E [ loss | loss ≥ VaR] (expected loss under ‘abnormal’ conditions)

  • 3. VaR, CVaR, and ST

For simplicity, consider a portfolio with a normally distributed return:

slide-7
SLIDE 7
  • 4. Methodology
  • Allocation problem among nine asset classes:

– T-bills (assumed to be risk-free); – Government bonds; – Corporate bonds; and – Six size/value-growth Fama-French portfolios.

  • Monthly investment horizon;
  • Historical simulation:

– 73% of banks that disclose methodology to estimate VaR report the use of historical simulation (Pérignon and Smith, 2010); – Monthly data during the period 1982–2006; – ST events: (i) 1987 stock market crash; and (ii) 9-11 (CGFS survey, 2005).

  • Consider three different risk management systems based on:

– A single VaR constraint; – Two ST constraints; and – A single VaR constraint and two ST constraints.

  • Examine whether each set of constraints precludes the selection of all

portfolios with relatively large CVaRs;

– If a set of constraints precludes such portfolios, it is effective in controlling CVaR; – Otherwise, it is ineffective in controlling CVaR.

7

slide-8
SLIDE 8
  • 4. Methodology

8

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

slide-9
SLIDE 9
  • 4. Methodology

E E Risk-free return

9

Expected return CVaR

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

E

slide-10
SLIDE 10
  • 4. Methodology

E E Risk-free return

10

Expected return CVaR

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine

. 100 / ) ( E E − = δ E

slide-11
SLIDE 11
  • 4. Methodology

E0= E E Risk-free return E50 E100= and between halfway is

50

E E E

11

Expected return CVaR

E . 100 / ) ( E E − = δ

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

E

slide-12
SLIDE 12
  • 4. Methodology

CVaR E0= E E Risk-free return E100= and between way the

  • f

% is E E i Ei Ei

12

Expected return

. 100 / ) ( E E − = δ

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

E E

slide-13
SLIDE 13
  • 4. Methodology

E0= E E Risk-free return E100=

Portfolio with minimum CVaR

A Mean-CVaR frontier and between way the

  • f

% is E E i Ei Ei

13

Expected return CVaR

E . 100 / ) ( E E − = δ

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

E

slide-14
SLIDE 14
  • 4. Methodology

E0= E E Risk-free return E100=

Portfolio with minimum CVaR Portfolio with maximum CVaR

B A Mean-CVaR frontier and between way the

  • f

% is E E i Ei Ei

14

Expected return CVaR

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

E . 100 / ) ( E E − = δ E

slide-15
SLIDE 15
  • 4. Methodology

Maximum efficiency loss Mi E0= E E Risk-free return E100=

Portfolio with minimum CVaR

B A Mean-CVaR frontier and between way the

  • f

% is E E i Ei Ei

Portfolio with maximum CVaR

15

Expected return CVaR

E . 100 / ) ( E E − = δ

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

E

slide-16
SLIDE 16
  • 4. Methodology

Maximum efficiency loss Mi E0= E E Risk-free return E100=

Portfolio with minimum CVaR

B A Mean-CVaR frontier and between way the

  • f

% is E E i Ei Ei

Portfolio with maximum CVaR

  • > For example, if Mi = 3%, then the VaR constraint allows the selection of a portfolio with

a CVaR that exceeds the CVaR of the minimum CVaR portfolio by 3%.

16

Expected return CVaR

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

E . 100 / ) ( E E − = δ E

slide-17
SLIDE 17
  • 4. Methodology

Maximum efficiency loss Mi (small) E0= E E Risk-free return E100=

Portfolio with minimum CVaR

B A Mean-CVaR frontier and between way the

  • f

% is E E i Ei Ei

  • > More generally, if maximum efficiency loss Mi is relatively small, then the VaR constraint

is effective in controlling CVaR when the required expected return is Ei.

Portfolio with maximum CVaR

17

Expected return CVaR

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

E . 100 / ) ( E E − = δ E

slide-18
SLIDE 18
  • 4. Methodology

Maximum efficiency loss Mi (large) E0= E E Risk-free return E100=

Portfolio with minimum CVaR

B A Mean-CVaR frontier and between way the

  • f

% is E E i Ei Ei

  • > However, if maximum efficiency loss Mi is relatively large, then the VaR constraint is

ineffective in controlling CVaR when the required expected return is Ei.

Portfolio with maximum CVaR

18

Expected return CVaR

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

E . 100 / ) ( E E − = δ E

slide-19
SLIDE 19
  • 4. Methodology
  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

  • 6. Compute average and largest

efficiency losses

. 100 / ) ( E E − = δ

Maximum efficiency loss Mi E0= E E Risk-free return

Expected return

E100= B A Mean-CVaR frontier and between way the

  • f

% is E E i Ei Ei

Portfolio with maximum CVaR Portfolio with minimum CVaR

19

E E

CVaR

slide-20
SLIDE 20
  • 4. Methodology

Maximum efficiency loss Mi E0= E E Risk-free return E100= B A Mean-CVaR frontier

frontier CVaR mean

  • n the

portfolio

  • f

CVaR loss efficiency loss efficiency

  • relative

=

and between way the

  • f

% is E E i Ei Ei

Portfolio with maximum CVaR Portfolio with minimum CVaR

20

Expected return CVaR

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

  • 6. Compute average and largest

efficiency losses, and average and largest relative efficiency losses

E . 100 / ) ( E E − = δ E

slide-21
SLIDE 21
  • 4. Methodology

Maximum efficiency loss Mi E0= E E Risk-free return E100= B A Mean-CVaR frontier and between way the

  • f

% is E E i Ei Ei

Portfolio with maximum CVaR Portfolio with minimum CVaR

For example, if the relative efficiency loss is 100%, then the VaR constraint allows the selection of a portfolio with a CVaR that is twice as large as the CVaR of the minimum CVaR portfolio.

21

Expected return CVaR

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

  • 6. Compute average and largest

efficiency losses, and average and largest relative efficiency losses

E . 100 / ) ( E E − = δ

A i B

M relative CVaR loss efficiency =

E

slide-22
SLIDE 22
  • 4. Methodology

CVaR

Maximum efficiency loss Mi E0= E E Risk-free return E100= B A Mean-CVaR frontier

A i B

M relative CVaR loss efficiency = and between way the

  • f

% is E E i Ei Ei

  • As CVaR ↓ 0, the relative efficiency loss ↑ ∞;
  • In the computation of average and largest relative

efficiency losses, we only consider levels of expected return for which the CVaR in the denominator is larger than 1%.

Portfolio with maximum CVaR Portfolio with minimum CVaR

22

Expected return

  • 1. Choose confidence level α (e.g., 99%)

and VaR bound V (e.g., 4%) for the constraint.

  • 2. Given the VaR constraint, find

maximum feasible expected return (the minimum expected return E is set to the risk-free return).

  • 3. Determine
  • 4. Construct grid of expected returns:

E0= E; E1= E + δ; ... ; E100 = .

  • 5. For each value in this grid Ei, find

maximum efficiency loss Mi.

  • 6. Compute average and largest

efficiency losses, and average and largest relative efficiency losses

E E . 100 / ) ( E E − = δ

slide-23
SLIDE 23
  • 5. Results: VaR constraint (fixed bound)

23

Fixed bound

Confidence level α

99%

Bound V

4% 8%

Efficiency loss: Average

8.25 14.94

Largest

11.11 20.97

Relative efficiency loss: Average

366.99 501.75

Largest

934.56 1844.67

Maximum feasible expected return

1.59 2.07

slide-24
SLIDE 24
  • 5. Results: VaR constraint (fixed bound)
  • Small bound

(tight constraint)

  • Large average loss
  • Large average relative loss

Fixed bound

Confidence level α

99%

Bound V

4% 8%

Efficiency loss: Average

8.25 14.94

Largest

11.11 20.97

Relative efficiency loss: Average

366.99 501.75

Largest

934.56 1844.67

Maximum feasible expected return

1.59 2.07

24

slide-25
SLIDE 25
  • 5. Results: VaR constraint (fixed bound)
  • Larger bound

(looser constraint)

  • Larger average loss

Fixed bound

Confidence level α

99%

Bound V

4% 8%

Efficiency loss: Average

8.25 14.94

Largest

11.11 20.97

Relative efficiency loss: Average

366.99 501.75

Largest

934.56 1844.67

Maximum feasible expected return

1.59 2.07

25

slide-26
SLIDE 26
  • 5. Results: VaR constraint (fixed bound)
  • Larger bound

(looser constraint)

  • Larger average loss
  • Larger average relative loss

Fixed bound

Confidence level α

99%

Bound V

4% 8%

Efficiency loss: Average

8.25 14.94

Largest

11.11 20.97

Relative efficiency loss: Average

366.99 501.75

Largest

934.56 1844.67

Maximum feasible expected return

1.59 2.07

26

slide-27
SLIDE 27
  • 5. Results: VaR constraint (fixed bound)
  • Larger bound

(looser constraint)

  • Larger average loss
  • Larger average relative loss
  • Larger maximum feasible

expected return

Fixed bound

Confidence level α

99%

Bound V

4% 8%

Efficiency loss: Average

8.25 14.94

Largest

11.11 20.97

Relative efficiency loss: Average

366.99 501.75

Largest

934.56 1844.67

Maximum feasible expected return

1.59 2.07

27

slide-28
SLIDE 28
  • 6. Results: VaR constraint (fixed versus variable bounds)

Fixed bound Variable bound

Confidence level α

99% 99%

Bound V

4% 8% Depends on E

Efficiency loss: Average

8.25 14.94 3.86

Largest

11.11 20.97 9.56

Relative efficiency loss: Average

366.99 501.75 105.93

Largest

934.56 1844.67 174.24

Maximum feasible expected return

1.59 2.07 2.16

28

slide-29
SLIDE 29
  • 6. Results: VaR constraint (fixed versus variable bounds)

Advantages of variable bounds:

  • Smaller average

loss

Fixed bound Variable bound

Confidence level α

99% 99%

Bound V

4% 8% Depends on E

Efficiency loss: Average

8.25 14.94 3.86

Largest

11.11 20.97 9.56

Relative efficiency loss: Average

366.99 501.75 105.93

Largest

934.56 1844.67 174.24

Maximum feasible expected return

1.59 2.07 2.16

29

slide-30
SLIDE 30
  • 6. Results: VaR constraint (fixed versus variable bounds)

Advantages of variable bounds:

  • Smaller average

loss

  • Smaller average

relative loss

Fixed bound Variable bound

Confidence level α

99% 99%

Bound V

4% 8% Depends on E

Efficiency loss: Average

8.25 14.94 3.86

Largest

11.11 20.97 9.56

Relative efficiency loss: Average

366.99 501.75 105.93

Largest

934.56 1844.67 174.24

Maximum feasible expected return

1.59 2.07 2.16

30

slide-31
SLIDE 31

Fixed bound Variable bound

Confidence level α

99% 99%

Bound V

4% 8% Depends on E

Efficiency loss: Average

8.25 14.94 3.86

Largest

11.11 20.97 9.56

Relative efficiency loss: Average

366.99 501.75 105.93

Largest

934.56 1844.67 174.24

Maximum feasible expected return

1.59 2.07 2.16

  • 6. Results: VaR constraint (fixed versus variable bounds)

Advantages of variable bounds:

  • Smaller average

loss

  • Smaller average

relative loss

  • Larger maximum

feasible expected return

  • Variable bounds are more effective in controlling CVaR than fixed bound
slide-32
SLIDE 32

Fixed bound Variable bound

Confidence level α

99% 99%

Bound V

4% 8% Depends on E

Efficiency loss: Average

8.25 14.94 3.86

Largest

11.11 20.97 9.56

Relative efficiency loss: Average

366.99 501.75 105.93

Largest

934.56 1844.67 174.24

Maximum feasible expected return

1.59 2.07 2.16

  • 6. Results: VaR constraint (fixed versus variable bounds)
  • Large average

loss

  • Large average

relative loss

  • VaR constraint with variable bounds is still ineffective in controlling CVaR
slide-33
SLIDE 33
  • 7. Results: variable bounds

(VaR versus ST constraints)

Constraints VaR ST Confidence level α

99% 99%

Efficiency loss: Average

3.86 15.54

Largest

9.56 26.97

Relative efficiency loss: Average

105.93 505.27

Largest

174.24 2280.65

33

  • Larger average

loss

slide-34
SLIDE 34
  • 7. Results: variable bounds

(VaR versus ST constraints)

Constraints VaR ST Confidence level α

99% 99%

Efficiency loss: Average

3.86 15.54

Largest

9.56 26.97

Relative efficiency loss: Average

105.93 505.27

Largest

174.24 2280.65

34

  • Larger average

loss

  • Larger average

relative loss

  • The use of ST constraints is even less effective in controlling CVaR

than the use of a VaR constraint

slide-35
SLIDE 35
  • 7. Results: variable bounds

(VaR and ST constraints)

Constraints VaR ST VaR + ST Confidence level α

99% 99% 99%

Efficiency loss: Average

3.86 15.54 1.96

Largest

9.56 26.97 4.03

Relative efficiency loss: Average

105.93 505.27 56.56

Largest

174.24 2280.65 138.53

35

  • Smaller average

loss

slide-36
SLIDE 36

36

Constraints VaR ST VaR + ST Confidence level α

99% 99% 99%

Efficiency loss: Average

3.86 15.54 1.96

Largest

9.56 26.97 4.03

Relative efficiency loss: Average

105.93 505.27 56.56

Largest

174.24 2280.65 138.53

  • Smaller average

loss

  • Smaller average

relative loss

  • 7. Results: variable bounds

(VaR and ST constraints)

  • Hence, there are notable benefits arising from using both VaR and ST

constraints (relative to using just one type of constraint).

slide-37
SLIDE 37
  • 7. Results: variable bounds

(VaR and ST constraints)

Constraints VaR ST VaR + ST Confidence level α

99% 99% 99%

Efficiency loss: Average

3.86 15.54 1.96

Largest

9.56 26.97 4.03

Relative efficiency loss: Average

105.93 505.27 56.56

Largest

174.24 2280.65 138.53

37

  • Large average

loss

  • Large average

relative loss

  • However, the joint use of VaR and ST constraints is ineffective in

controlling CVaR.

slide-38
SLIDE 38
  • 8. Robustness checks
  • Consider additional cases:
  • 1. A larger number of ST events (87 crash, 9-11, 97 Asian crisis, 98

Russian crisis);

  • 2. A larger number of assets (T-bills, T-bonds, corporate bonds, ten

size Fama-French portfolios);

  • 3. Larger numbers of both ST events and asset classes;
  • 4. Data during the period 1982-2009; and
  • 5. Daily data.

38

slide-39
SLIDE 39

9 assets 2 ST events 1982-2006 39

  • 8. Robustness checks

(box plots of efficiency losses with VaR and ST constraints)

Maximum efficiency loss (%) Largest Smallest Median First quartile Third quartile

slide-40
SLIDE 40

9 assets 2 ST events 1982-2006 9 assets 4 ST events 1982-2006 40

  • 8. Robustness checks

(box plots of efficiency losses with VaR and ST constraints)

Maximum efficiency loss (%)

slide-41
SLIDE 41

9 assets 2 ST events 1982-2006 9 assets 4 ST events 1982-2006 13 assets 2 ST events 1982-2006 41

  • 8. Robustness checks

(box plots of efficiency losses with VaR and ST constraints)

Maximum efficiency loss (%)

slide-42
SLIDE 42

9 assets 2 ST events 1982-2006 9 assets 4 ST events 1982-2006 13 assets 2 ST events 1982-2006 13 assets 4 ST events 1982-2006 42

  • 8. Robustness checks

(box plots of efficiency losses with VaR and ST constraints)

Maximum efficiency loss (%)

slide-43
SLIDE 43

9 assets 2 ST events 1982-2006 9 assets 4 ST events 1982-2006 13 assets 2 ST events 1982-2006 13 assets 4 ST events 1982-2006 9 assets 2 ST events 1982-2009 43

  • 8. Robustness checks

(box plots of efficiency losses with VaR and ST constraints)

Maximum efficiency loss (%)

slide-44
SLIDE 44

Monthly data Investment horizon of one month Daily data Investment horizon of one day

  • In sum, all robustness checks indicate that the joint use of VaR and ST

constraints is still ineffective in controlling CVaR.

44

  • 8. Robustness checks

(box plots of efficiency losses with VaR and ST constraints)

Maximum efficiency loss (%)

slide-45
SLIDE 45
  • 9. Conclusion
  • The joint use of VaR and ST constraints allows the selection of

portfolios with relatively large CVaRs.

  • Hence, the joint use of VaR and ST constraints is ineffective in

controlling CVaR.

  • This result is consistent with:

− Banks around the world suffered sizeable trading losses during the recent crisis. − Trading losses notably exceeded VaR (and even minimum capital requirements).

  • Our paper supports the view that the Basel market risk framework

did not promote bank stability.

45

slide-46
SLIDE 46
  • 10. Related Research
  • Revised Basel market risk framework: stressed VaR

− Motivation: revised framework is based on VaR, stressed VaR, and ST. − Question: is the revised framework effective in controlling tail risk? − Main result I: a risk management system based on the revised framework still allows the selection of trading portfolios with substantive tail risk. − Main result II: while the minimum capital requirements set by the

  • riginal framework for such portfolios can be wiped out by losses

during a period of just one day, this is much less likely with the revised framework. − Reference: Alexander, Baptista, and Yan, 2011, A comparison of the

  • riginal and revised Basel market risk frameworks for regulating bank

capital.

46

slide-47
SLIDE 47

47

  • 10. Related Research
  • An alternative: using multiple VaR constraints

− Motivation: practitioners and regulators criticize the performance of VaR during the recent crisis, but still use it. − Question: does there exist more effective VaR-based risk management systems? − Main result: regulations and risk management systems based on multiple VaR constraints are more effective in reducing tail risk than those based on a single VaR constraint. − Reference: Alexander, Baptista, and Yan, 2011, When more is less: Using multiple constraints to reduce tail risk, Journal of Banking and Finance, forthcoming.