Bainbridge Island School District Community Forum Master Plan Update Fall 2015 Background Master Plan History 2005 to 2015 2005 Facility Master Plan 15 year facility planning document Recommendations 2005 2015: Address
Background
2005 – Facility Master Plan – 15 year facility planning document
Recommendations 2005 – 2015:
- Address district-wide health, life-safety and infrastructure issues at all facilities
- Replace BHS 200 Building
- Replace Bainbridge High School 100 Building including performance space
- Replace Wilkes Elementary School
- Replace Blakely Elementary School
- Replace Ordway Elementary School
- Replace Commodore Options School
2006 – Capital Bond
- Bainbridge High School 200 Building replacement to address core facility needs
- Essential renovations district-wide (asset preservation and postpone, patch and
repair)
2009 – Capital Bond
- Wilkes Elementary School replacement
- Essential renovations district-wide (asset preservation and postpone, patch and
repair)
Master Plan History
2005 to 2015
Built on strongly held community values and a history of educational support. Focused on 21st Century student learning, sustainability, energy efficiency, longevity, flexibility and community use.
Quick Facts:
- 75+ year building (more than double the state standard)
- Geo-thermal heating, radiant floor, fresh air exchange,
- Rubber flooring
- Individualized instruction
- Small group learning
- Shared learning spaces
- Keyless access system
- Commons/cafeteria
- Interior/exterior learning
- Casework-storage
- Natural day lighting
- Full sized gymnasium for community, wood floor
- Upsized water line for fire flow protection
- Large on-site septic system (LOSS)
“Architecture affects the lives of people directly. It comes with an extraordinary
- responsibility. I think one needs to take that responsibility very seriously. It’s the quality
- f life it gives to its inhabitants”. Moshe Safdie
BISD Construction Standards
Wilkes Elementary School
Cost Comparison – How does it Compare?
- WILKES ELEMENTARY SCHOOL COST PER SQUARE FOOT $370
- SAMPLE AVERAGE COST PER SQUARE FOOT $368
- SAMPLE MEDIAN COST PER SQUARE FOOT $370
Comparison to elementary schools in the Puget Sound region:
School (District) Year /Esc Size/GSF* Design ** Bid/Cost*** 2015 Cost**** $ / SF Wilkes Elementary 2012/3 66463 450 $21.78M $24.6M $370 med Mercer Island Elementary #4 (MI) 2016/0 77277 550 $30.39M $31.91M $412 Arbor Heights Elementary (Seattle) 2016/0 78375 490 $22.85M $24.00M $306 Enatai Elementary (Bvue) 2016/0 82260 650 $29.65M $31.13M $378 Lake Stickney Elementary (Muk) 2016/0 74167
- $23.42M
$25.60M $345 Benjamin Rush Elementary (LkWsh) 2013/2 65306 550 $24.70M $27.49M $420 Cherry Crest Elementary (Bvue) 2011/4 76950 550 $22.35M $26.28M $341 Carl Sandburg Elementary (LkWsh) 2012/3 66580 550 $21.73M $24.86M $373 Rachel Carson Elementary (LkWsh) 2008/7 56506 560 $17.30M $21.97M $388 St Thomas School (Ind) 2008/7 55000 300 $19.10M $24.26M $441 Helen Keller Elementary (LkWsh) 2011/4 56,600 450 $17.51M $20.59M $363 John Muir Elementary (LkWsh) 2012/3 58,000 400 $19.22M $21.99M $379 Alexander Graham Bell Elementary (LkWsh) 2011/4 65,300 500 $20.71M $24.35M $373 Eastgate Elementary (Bvue) 2008/7 63,500 450 $19.66M $24.98M $393 Ardmore Elementary (Bvue) 2009/6 71,147 450 $17.00M $21.06M $296 low Riverview Elementary (Snohomish) 2009/6 82,210 550 $21.61M $26.77M $325 Machias Elementary (Snohomish) 2009/6 79,778 550 $20.12M $24.93M $312 Briarwood Elementary (Iss) 2011/4 70,000 475 $18,87M $22.19M $317 University Place Primary (UnivPl) 2007/8 56,100 575 $15.58M $20.28M $361 Midway Elementary (Highline) 2007/8 67,997 600 $23.41M $30.47M $448 high Sherwood Forest Elementary (Bvue) 2007/8 63,900 440 $19.06M $24.82M $388 (REVISED 10.06.2015) * Based on best information for actual constructed school size in gross square feet ** Estimated facility design head-count capacity *** Construction cost based on most readily-available source (const bid; bid + alts; const cost; board approvals; historical) **** Construction cost in either actual or escalated @ 3% per year (2015 dollars) and adjusted to “Island dollar factor” of +5%
Cap apit ital F Fund und
Pays ys for:
- New
w constr tructi ction
- Essen
ssential ren enovation of f ex existing buildings (roofs, HVAC, , etc.) tc.)
- Ene
nergy c cons nservation
- n
- Maj
Major c cap apital improvem emen ents ( s (syst stem em upgrades, s, classr ssroom a alter erations f s for new pro rogra rams, f field/tra rack improvement, , etc.) .)
- Tec
ech L Lev evy (eq equipment so soft ftware, traini ning ng)
- Staff (F
(FTE di E directly-related t d to funde ded d proje jects) )
Gene neral F al Fund
Pays ys For:
- Da
Day-to to-da day costs of ope perating g school
- ols
- Staff s
ff salaries & es & benefi fits
- Curricul
ulum um & suppl pplies
- Utilit
litie ies & & insurance
- Trans
nspor
- rtation
- n
General Fund vs Capital Fund
Both Serve Vital Student Needs
MAJOR OR PROJE JECTS
- Bainbridge High School 200 Building Replacement
- Maintenance Building Replacement
OTHER ER P PROJEC ECTS Bainbri bridge dge High S School
- (4) Portables purchased to house students during construction
- f the 200 Building
- Energy Conservation (Lighting upgrades)
- 100
00 Bld ldg
- LGI Stage Area Safety Improvements
- HVAC (Failing boiler system valve replacement)
- 300
00 Bld ldg
- Conversion and Upgrade of 3 Science Rooms
- Lab Prep Room Conversion and Upgrade
- Unification to New Boiler System-Hydronic Heat
- 400
00 Bld ldg
- HVAC Upgrades – Boiler Controls
- 500
00 Bld ldg
- Unification to New Boiler System/Hydronic Heat
- Remediate water infiltration
- Roof Replacement
- Sta
tadiu ium
- Roof Replacement & Exterior Paint
- Track and Field Replacement
- Baseball Field Minor Improvements
Commodore Fa Facilit ility
- Commons/lunchroom and kitchen
- Music Room Floor Replacement
- Intercom Upgrades
- Energy Conservation (Lighting Upgrades)
- Partial Roof Replacement
- Partial Building Demolition
- Science Room Renovation
- Heat Recover Unit Replacement
Woodw dward rd Middle S School
- ol
- Energy Conservation (Lighting upgrades)
- Connecting Pathway to Sakai
Sakai I Inter erme mediate S e School
- Energy Conservation (Lighting upgrades)
- Connecting Pathway to Woodward
- Drainage improvements
- Intercom upgrade
Blake akely E Element ntar ary S Scho hool
- Energy Conservation (Lighting upgrades)
- Domestic Hot Water System Improvement
- South Island Sewer Connection (payoff)
- Seismic Improvement to Covered Play Area
- Gymnasium Floor Replacement
- Portable relocation from BHS
Ordway E Elementary School
- ol
- Energy Conservation (Lighting upgrades)
- Gymnasium Floor Replacement
- Fascia Abatement and Replacement
- Domestic Hot Water System Replacement
- Bathroom Remodels
- Clock and Intercom improvements
- Interior paint
Wilkes es E Elemen ementary S School
- Roof Postpone Patch & Repair
Dis istr tric ictwide
- Boardroom
- Communications Upgrade
- Minor paving Improvements
Capital Projects & Facilities
The 2006 2006 $45M $45M Bond a accomplished t the followi wing:
MAJOR P R PROJECT CTS
- Wilkes Elementary School Replacement
- Transportation Buildings Remodel
OTHER ER P PROJEC ECTS Bainbri bridge dge High S School
- Tennis Court Resurfacing
- 100
00 Bld ldg
- Roof Postpone Patch & Repair
- Computer Lab Electrical Upgrade
- Composite Lab
- Drafting Room Renovation
- 300
00 Bld ldg
- Photo Lab Renovation
- 400
00 Bld ldg
- Energy Conservation (Lighting Upgrades)
- Sta
tadiu ium
- Energy Conservation (Lighting Upgrades)
Commodore Fa Facilit ility
- Office Remodel
- Heat Recovery Unit Installation (Steam System Replacement)
Woodw dward M rd Middl dle School
- ol
- Field & Track Replacement
- Commons Paint and Baseboard
- Roof Replacement
- Gymnasium Floor Replacement
- Gymnasium Paint
- Gymnasium Lighting Retrofit
- HVAC Controls Upgrade
- Partial Exterior Paint
- Field Drainage Improvements
- Library Reconfiguration
Sakai I Inter erme mediate S e School
- HVAC Controls Upgrade
- Interior Paint
- Music Room Acoustic Improvements
- Lighting Retrofit
Blake akely E Element ntar ary S Scho hool
- Roof Postpone Patch & Repair
- (STEM) Room Conversion
- Lighting Retrofit
Ordway E Elementary School
- ol
- Portable roof replacement
- STEM Room Conversion
- Lighting Retrofit
- Play Shed and Playground Improvements
- Portables (2) Upgrades
- Portables (2) Relocation
- HVAC Improvements
- ILC Room Enhancements
- Library Pit Infill
Wilkes es E Elemen ementary S School
- STEM Room Conversion
Dis istr tric ict A Adminis istration O Offic ice
- HVAC Improvements
- Reconfiguration
Dis istr tric ictwide
- Security Cameras
- Energy Conservation
- Minor Pavement Improvements
Capital Projects & Facilities
The he 2009 $42M 2009 $42M B Bond accomplished the f followi wing:
Master Plan Update
2014 – Study and Survey
Facility condition and analysis portion facilitated by Hutteball & Oremus Architects 2014 Study and Survey Team: Includes architects, structural, mechanical, electrical and civil engineers.
Findings:
The following buildings were identified to be in poor condition in accordance with the Office of Superintendent of Public Instruction (OSPI) guidelines:
- Blakely Elementary School
- Bainbridge High School
100 Building
- Ordway Elementary School
- Commodore Options School
- Master Plan Update 2014 to 2015
2015 – Facility Master Plan
Update facilitated by Mahlum Architects Spring 2015 Master Plan Committee: Includes architects, structural, mechanical, electrical and civil engineers, as well as community members and staff.
Committee Recommendations:
- Address district-wide health, life-safety
and infrastructure issues
- Replace Blakely Elementary School
- Replace Bainbridge High School
100 Building with performance space
- Replace Ordway Elementary School
- Replace Commodore Options School
Board Directed State Mandated
Summary:
- (4) district buildings need replacement Blakely Elementary School,
Ordway Elementary School, Bainbridge High School 100 building and Commodore Options School
- Initial focus on Blakely Elementary School and Bainbridge Island High
School 100 building
- All bond requests will include funding for asset preservation and
essential postpone, patch and repairs
- Majority of school construction is funded locally
- Several community forums will be held prior to board decision
- BISD Board gives direction to engage community in discussion about
- ptions to replace Blakely Elementary and Bainbridge High School 100
building including the Large Group Instruction (LGI).
Master Plan Update
Summer 2015
Blakely Elementary School
School District
Blakely Elementary School :: EXISTING CONDITION
43,505 GROSS SQUARE FEET NORTH
Blakely Elementary School :: CONSTRUCTION HISTORY
43,505 GROSS SQUARE FEET
Quick Facts:
- Serves Grades Kindergarten through Fourth
- Site area is approximately 12 acres (11.98)
- Constructed in 1965; two additions in 1989 and 1993
- Permanent Building Area is 43,505 gross square feet (GSF); 21,645 GSF short of
required program space.
Study & Survey Summary of Findings:
- The current facility is over 50 years old
- There are limited opportunities and lack of space for alternative educational
delivery
- The mechanical, plumbing and electrical systems are beyond their useful life
- Natural daylighting is limited
- The building is structurally overstressed; there are deficiencies in seismic-load
handling capabilities
- There is inadequate ADA/accessibility
- There is no fire sprinkler system in the building
- Interior wall finishes, floors, ceilings and hardware are in need of complete
replacement
- Conflicts between buses, loading and unloading and pedestrians create day-to-day
safety issues
Blakely Elementary School
Blakely Elementary School
Blakely Elementary School - Exterior
Roof Asphalt Safety fence Covered Play
Blakely Elementary School - Infrastructure
Blakely Elementary School – Interior
Hallways Hallways
Blakely Elementary School – Learning
Individualized Learning Creative Work Station
Blakely Elementary School – Learning
Blakely Elementary School
Options:
- Postpone, Patch and Repair (unsustainable):
$3.95M + $1.5M (in systems that cannot be physically supported with current structure)
- Modernize existing building:
$38.15M
- Replace:
$38.96M
Blakely Elementary School
Bainbridge High School – 100 Building
Bainbridge Island High School
Bainbridge Island High School 100 Building
Bainbridge Island High School
100 Building – Bainbridge High School
Bainbridge High School – 100 Building
Quick Facts:
- Constructed in 1970
- 41,509 Gross Square Feet (GSF); 19,292 GSF of classroom space and 22,971 GSF
- f theater space (42,300 GSF) is needed
Study & Survey Summary of Findings:
- The building is over 45 years old
- There are limited opportunities for flexibility in educational delivery
- The mechanical, plumbing and electrical systems are beyond their useful life
- There is limited or non-existent natural daylighting
- The building is structurally overstressed; there are serious deficiencies in
seismic-load handling capabilities
- There is inadequate thermal insulation/single-pane windows
- The roof is in immediate need of replacement
- There is no fire sprinkler system
- Interior wall finishes, floors, ceilings and hardware are in need of
complete replacement
- There is chronic water infiltration in below-grade areas
- Large Group Instruction (LGI) exterior canopy is beyond serviceable life
Bainbridge High School – 100 Building
Bainbridge High School – 100 Building
Large Group Instruction (LGI) - Lobby
Sight Lines “We can’t see!”
Bainbridge High School – 100 Building
Large Group Instruction (LGI) - House
Lighting and tech sound booth
Bainbridge High School – 100 Building
Large Group Instruction (LGI) – Stage | Technical Theater
Light switch
Green room Costume changes Set storage Multi-purpose room and set construction and …
Bainbridge High School – 100 Building
Large Group Instruction (LGI) – Back Stage
Bainbridge High School – 100 Building
Storage
Bainbridge High School – 100 Building
Infrastructure
Bainbridge High School – 100 Building
Finishes and Bathrooms
Bainbridge High School – 100 Building
Learning Environments
Bainbridge High School
CTE (Robotics) Issues that affect 100 Building
Caution! Chemicals mixed with robotics storage.
Bain inbrid idge H Hig igh S Scho hool
- l :: P
Proj
- ject C
Capit ital l Cost
- sts :
:: A April il 2 2015 * *
Sum ummary ry
- f
- f
Findi dings gs New w in Li Lieu Po Postpone Pa Patch & Repair ir Imme Immedi diate Asset Preser ervati tion Other r Conside ideratio ions 100 100 Buil ildi ding $15,378,622 $27,022,727 $7,183,578 $1,269,266 300 300 Buil ildi ding $6,690,254 $653,756 400 400 Buil ildi ding $4,124,149 $145,846 500 500 Buil ildi ding $10,756,027 $3,665,317
*Estimates include “Soft” costs
Bainbridge High School - 100 Building
3 Options Black Box 450 Seat Theater 600 Seat Theater
Intimate Black Box Theatres
Black Box
More Black Box Theatres
Full Facility Floor Plans
Black Box
Intimate Black Box Theatres
Full Theater
Nathan Hale High School Seattle, Washington
Bainbridge High School 100 Building
3 Options Black Box 300 Seat Theater 600 Seat Theater
2012 MAHLUM ARCHITECTS INC
Intimate Black Box Theatres
Full Theater
Issaquah High School Issaquah, Washington
2012 MAHLUM ARCHITECTS INC
Intimate Black Box Theatres
Full Theater
Sammamish High School Bellevue, Washington
Bainbridge High School 100 Building
3 Options Black Box 300 Seat Theater 600 Seat Theater
2012 MAHLUM ARCHITECTS INC
Bainbridge High School – 100 Building
Options:
- Short-term immediate need for Postpone, Patch and Repair (unsustainable):
$7.18M + $1.27M (in structural upgrades that may not be feasible)
- Modernize existing building (unsustainable):
$15.38M + $1.27M (in work that may trigger additional costs due to structural deficiencies)
- New building option A
$15.4M (w/black box 150-175 seat)
- New building option B
$24.3M (w/300-450 seat theater)
- New building option C
$27.02M (w/600 seat theater)
$60.2 M*
:: Replace Blakely Elementary School :: Postpone, Patch, Repair Bainbridge High School – 100 Building Commodore Options School :: Asset Preservation Sakai Intermediate School Woodward Middle School Bainbridge High School 300/400/500 buildings
$68.5M*
:: Replace Blakely Elementary School :: Replace 100 Building :: Black box performance 150-175 seats :: Postpone, Patch, Repair Ordway Elementary School Commodore Options School :: Asset Preservation Sakai Intermediate School Woodward Middle School Bainbridge High School 300/400/500 buildings
Options
$77.5M*
:: Replace Blakely Elementary School :: Replace Bainbridge High School - 100 Building :: Performance theatre 300-450 seats :: Postpone, Patch, Repair Ordway Elementary School Commodore Options School :: Asset Preservation Sakai Intermediate School Woodward Middle School Bainbridge High School 300/400/500 buildings
$80.2 M*
:: Replace Blakely Elementary School :: Replace Bainbridge High School - 100 Building :: Performance theatre 600 seats :: Postpone, Patch, Repair Ordway Elementary School Commodore Options School :: Asset Preservation Sakai Intermediate School Woodward Middle School Bainbridge High School 300/400/500 buildings *Does not include McCleary implications
This is an estima mated ed change from the 2016 levy rate:
2015 Bainbridge Island median house $486,000
Options Cost Increase Per $1000 Assessed Value Cost for Median Home $60.2 M $.22 per $1000 AV $9 per mo ($107/year) $68.5 M $.29 per $1000 AV $12 per mo ($141/year) $77.5 M $.36 per $1000 AV $15 per mo ($175/year) $80.2 M $.38 per $1000 AV $15 per mo ($185/year)
Estimated Capital Investment Impact on Levy Rate
Blakely Elementary School 21 September 2015 7:00 pm Bainbridge High School 15 September 2015 7:00 pm 30 September 2015 7:00 pm Ordway Elementary School 29 September 2015 6:00 pm Commodore Options School 1 October 2015 7:00 pm Wilkes Elementary School 7 October 2015 7:00 pm Woodward & Sakai 14 October 2015 7:00 pm
Community Forums
Questions
We welcome your input. Please share your
- pinions by attending one of our upcoming