Atlas 14 xte rna l Sta ke ho lde rs Me e ting RST July 17, 2018 - - PDF document

atlas 14
SMART_READER_LITE
LIVE PREVIEW

Atlas 14 xte rna l Sta ke ho lde rs Me e ting RST July 17, 2018 - - PDF document

OOD RISK L INS F ANDING AUST Atlas 14 xte rna l Sta ke ho lde rs Me e ting RST July 17, 2018 UNDE E Ove r vie w 2 Ra infa ll Da ta Cha ng e s Ne e d fo r Ac tio n So lutio n Optio ns Re c o mme nde d Co de Ame ndme


slide-1
SLIDE 1

Atlas 14

UNDE RST ANDING AUST IN’S F L OOD RISK

E xte rna l Sta ke ho lde rs Me e ting July 17, 2018

slide-2
SLIDE 2

Ove r vie w

Ra infa ll Da ta Cha ng e s Ne e d fo r Ac tio n So lutio n Optio ns Re c o mme nde d Co de Ame ndme nts I

mpa c ts to Re side nts a nd De ve lo pme nt

Disc ussio n/ Ne xt Ste ps

2

slide-3
SLIDE 3

NOAA Atlas 14 - Bac kgr

  • und

 Na tio nwide study

  • f ra infa ll inte nsitie s

 Pa rtne rs:

 F

e de r al: Na tio na l

We a the r Se rvic e , U. S. Army Co rps o f E ng ine e rs, F e de ra l Hig hwa y Administra tio n

 State / L

  • c al: T

xDOT , Ha rris Co unty F lo o d Co ntro l Distric t, City o f Austin, e t a l.

3

slide-4
SLIDE 4

Histor y of Rainfall Inte nsity Studie s for Austin

4

10.1 12.5 10.2 13.2

8 9 10 11 12 13 14 1960 1970 1980 1990 2000 2010 2020

Ra infa ll De pth (inc he s) Ye a r Study Pub lishe d

Ra infa ll fro m 100-ye a r 24 hr sto rm

T P-40, 1961 Austin DCM, 1977 USGS, 1998 Atlas 14, 2018

slide-5
SLIDE 5

Rainfall De pth Change s (Pr e liminar y)

5

R e c ur r e nc e Inte r val Cur r e nt R ainfall De pth in inc he s Atlas 14 R ainfall in inc he s 25-ye ar 7.6 Almost 10 100-ye ar 10.2 Up to 13+ 500-ye ar 13.5 Not ye t available

slide-6
SLIDE 6

Ar e a Cur r e nt 100-Ye ar Cur r e nt 500-Ye ar Diffe r e nc e

City L imits 3,702 6,533 2,831

Ar e a Cur r e nt 100-Ye ar Cur r e nt 500-Ye ar % L ar ge r

City L imits 7% 9% 26%

6

City-wide Atlas 14 Impac ts

 Appro xima te numbe r

  • f buildings in floodplain (e xc luding Co lo ra do

Rive r flo o dpla in)

 Appro xima te pe r

c e nt of ar e a in the floodplain (e xc luding Co lo ra do

Rive r flo o dpla in)

slide-7
SLIDE 7

Ne e d for Ac tion

7

slide-8
SLIDE 8

200 400 600 800 1,000 1,200 1,400 1940 1950 1960 1970 1980 1990 2000 2010

Numbe r

  • f Str

uc tur e s

De c ade Built

Wate r she d Re gulations: F lood Mitigation

Count of structures in the current 100‐year floodplain by decade

1983: Regulations

introduced to prevent encroachment into the 100‐ year floodplain

slide-9
SLIDE 9

2,000 4,000 6,000 8,000 10,000 12,000 14,000 1940 1950 1960 1970 1980 1990 2000 2010 2020

Cumulative No. Str uc tur e s in F loodplain

De c ade Built Count of structures in the current 100‐year floodplain by decade Hypothetical number of structures in floodplains without regulatory protections

12,000

Wate r she d Re gulations: F lood Mitigation

slide-10
SLIDE 10

Re gulation Re vision Options

Do No thing Wa it to c ha ng e re g s until flo o dpla in

studie s a re fina l

Upda te re g s no w using c urre ntly

a va ila b le da ta

10

slide-11
SLIDE 11

Re gulation Re vision Options

Do No thing

Disr

e gar d Atlas 14 and maintain c ur r e nt r e gs

Doe sn’t pr

  • te c t r

e side nts fr

  • m flood

hazar ds base d on ne w unde r standing of flood r isks

11

slide-12
SLIDE 12

Re gulation Re vision Options

Wa it to c ha ng e re g s until flo o dpla in

studie s a re upda te d

Updating floodplain studie s will take a

minimum of two ye ar s

L

ife / safe ty implic ations ar e too signific ant to de lay

WPD will initiate floodplain study update s

imme diate ly

12

slide-13
SLIDE 13

Re gulation Re vision Options

Upda te re g s using c urre ntly a va ila b le

da ta

Pr

  • vide s imme diate pr
  • te c tion and vital

infor mation to r e side nts

Use s r

e adily available , valid data

13

slide-14
SLIDE 14

Pr

  • pose d Code Ame ndme nt

Re vise flo o dpla in de finitio ns Re de ve lo pme nt e xc e ptio n Co lo ra do Rive r e xc e ptio n Cha ng e minimum fre e b o a rd to 2 fe e t

14

slide-15
SLIDE 15

Pr

  • pose d Code Ame ndme nt

15

Re c ur r e nc e Inte r val Cur r e nt R ainfall De pth in inc he s Atlas 14 25-ye ar 7.6 Almost 10 inc he s 100-ye ar 10.2 Up to 13+ inc he s 500-ye ar 13.5 Not ye t available

slide-16
SLIDE 16

Re vise floodplain de finitions

100-ye ar

=

Atlas 14 100-ye ar

  • r

F E MA 500-ye ar

25-ye ar

=

Atlas 14 25-ye ar

  • r

fully de ve lope d 100-ye ar

16

slide-17
SLIDE 17

Re vise floodplain de finitions

17

E

nc ro a c hme nt

Must satisfy

floodplain r ule s

Sa fe a c c e ss

Ac c e ss path

  • min. 1-ft above

F

re e b o a rd

Min. 2-ft above

slide-18
SLIDE 18

Color ado Rive r F loodplain

 Maintain c urre nt

100-ye a r flo o dpla in a lo ng Co lo ra do Rive r

18

slide-19
SLIDE 19

Re vise floodplain de finitions – Why?

19

I

nfo rm pub lic o f c urre nt unde rsta nding o f flo o d risk

Curre nt, va lid 500-ye a r is a ppro xima te

ne w 100-ye a r

slide-20
SLIDE 20

Atla s 14 c ha ng e s no t

e xpe c te d to sig nific a ntly a ffe c t Co lo ra do Rive r wa te rshe d upstre a m o f Austin

20

Color ado R ive r wate r she d

Re vise floodplain de finitions – Why?

slide-21
SLIDE 21

Re de ve lopme nt e xc e ption

A re side ntia l b uilding in the 25- o r 100-ye a r

flo o dpla in c a n b e re de ve lo pe d a s lo ng a s:

Above 100-ye ar

floodplain by 2 fe e t

A maximum gr

  • ss floor

ar e a that is the lar ge r

  • f e xisting or

2,200 squar e fe e t

Doe s not inc r

e ase numbe r

  • f dwe lling units

Re pla c e s the pre -1983 e xc e ptio n

21

slide-22
SLIDE 22

Unde r c ur r e nt r ule s:

Pro pe rtie s in g re e n like ly to re de ve lo p unde r the pre -1983 e xc e ptio n Pro pe rtie s in ye llo w like ly to re de ve lo p with a n a dministra tive va ria nc e Pro pe rtie s in re d re q uire a Co unc il va ria nc e to re de ve lo p

Re de ve lopme nt e xc e ption

22

100-ye ar floodplain 25-ye ar floodplain

slide-23
SLIDE 23

Re de ve lopme nt e xc e ption

23

Unde r ne w r ule s:

All pro pe rtie s ha ve sa me

  • ppo rtunity to re de ve lo p

with a size limita tio n a nd e le va te d finishe d flo o r unde r a n e xc e ptio n

F lood r isk will be r e duc e d in all c ase s

100-ye ar floodplain 25-ye ar floodplain

slide-24
SLIDE 24

Re de ve lopme nt e xc e ption

Ho w do e s this a pply to a dditio ns?

If the home me e ts fr

e e boar d and the pr

  • pose d total squar

e footage doe sn’t e xc e e d the size limitation, the n it may be appr

  • ve d unde r

this e xc e ption

24

slide-25
SLIDE 25

Re de ve lopme nt e xc e ption

Ho w do e s this a pply to re no va tio ns?

If the r

e novation is not a substantial impr

  • ve me nt, the n it may be appr
  • ve d

unde r the e xisting c ode

If the r

e novation is a substantial impr

  • ve me nt and the home me e ts

fr e e boar d, the n it may be appr

  • ve d

unde r this e xc e ption

25

slide-26
SLIDE 26

R e de ve lopme nt e xc e ption – Why?

I

nc e ntivize s re de ve lo pme nt while re duc ing flo o d risk

Ove r time re duc e s the numb e r o f

b uilding s a t risk o f flo o ding

Simplify c o de 2,200 sq . ft. is me dia n sing le -fa mily

ho me size in Austin

26

slide-27
SLIDE 27

Color ado Rive r e xc e ption

 E

xpand 100-ye a r

e nc ro a c hme nt e xc e ptio n to inc lude L a ke Austin a nd L a ke T ra vis

27

slide-28
SLIDE 28

Color ado R ive r e xc e ption – Why?

Co lo ra do Rive r

flo o ding is no t e xpe c te d to ha ppe n in a “fla sh”

Still re q uire s no

a dve rse impa c t a nd fre e b o a rd – wa ive s sa fe a c c e ss

28

slide-29
SLIDE 29

Minimum fr e e boar d to 2 fe e t

Minimum he ig ht

b e twe e n b uilding ’ s lo we st flo o r a nd 100- ye a r flo o dpla in

Mo re tha n 140 T

e xa s c o mmunitie s ha ve fre e b o a rd o f 2 fe e t o r hig he r

29

2-ft

slide-30
SLIDE 30

Minimum fr e e boar d to 2 fe e t – Why?

F

re e b o a rd is the sing le -mo st e ffe c tive me a ns fo r re duc ing flo o d risk to a b uilding in the flo o dpla in

Simplify c o de – c urre nt fre e b o a rd re q uire me nt fo r

a dministra tive flo o dpla in va ria nc e s a nd Ce ntra l Busine ss Are a e xc e ptio n is 2 fe e t, e lse whe re it’ s 1 fo o t

Re duc e d flo o d insura nc e c o sts c a n o ffse t inc re a se d

c o nstruc tio n c o st

30

slide-31
SLIDE 31

Atlas 14 Impac t to home owne r s

Ne w unde rsta nding o f flo o d risk F

lo o d insura nc e c ha ng e s a t le a st 3 ye a rs a wa y

Rate s may go up Insur

anc e r e quir e me nts may c hange

T

alk to an insur anc e age nt now

Se e impa c ts a t AT

Xflo o dpro .c o m

31

slide-32
SLIDE 32

Atlas 14 Impac t to De ve lopme nt

Whe n mig ht the se c ha ng e s sta rt b e ing

e nfo rc e d?

Will the se c ha ng e s a ffe c t

de ve lo pme nt a lre a dy sub mitte d?

Will the se c ha ng e s a ffe c t b uilding

pe rmits fo r pla tte d sub divisio ns?

DSD me mo about r

e c omme ndations

32

slide-33
SLIDE 33

33

Atlas 14 Impac t to De ve lopme nt

slide-34
SLIDE 34

Atlas 14 Impac t to De ve lopme nt

Sto rm dra in de sig n De te ntio n po nd de sig n Pha se d de ve lo pme nt

34

slide-35
SLIDE 35

Rainfall De pth Change s (Pr e liminar y)

Onio n Cre e k a t Buda ra in g a ug e

Re c ur r e nc e Inte r val (ye ar s) R ainfall T

  • tals

(inc he s) Inc r e ase in R ainfall T

  • tals (inc he s)

1-hr 24-hr 1-hr 24-hr 25 9.8 2.2 100 13.2 3.0

35

slide-36
SLIDE 36

Rainfall De pth Change s (Pr e liminar y)

Onio n Cre e k a t Buda ra in g a ug e

Re c ur r e nc e Inte r val (ye ar s) R ainfall T

  • tals

(inc he s) Inc r e ase in R ainfall T

  • tals (inc he s)

1-hr 24-hr 1-hr 24-hr 25 3.7 9.8 0.4 2.2 100 4.7 13.2 0.3 3.0

36

slide-37
SLIDE 37

Var iation of Rainfall Ac r

  • ss Re gion

 Pre vio us ra infa ll studie s

yie lde d re la tive ly c o nsiste nt va lue s a c ro ss the Austin Me tro a re a

 Atla s 14 sho ws sig nific a nt

va ria tio n

 Optio ns fo r Crite ria

 Sing le va lue a ssuming the ma ximum  Sing le va lue a ssuming a n a ve ra g e  Multiple va lue s b a se d o n wa te rshe ds  Multiple va lue s b a se d o n c o unty

b o unda rie s

37

slide-38
SLIDE 38

Code Ame ndme nt Pr

  • c e ss and

T ime line

38

Pla nning Co mmissio n Pla nning Co mmissio n Pub lic He a ring Ordina nc e Ado ptio n C&O Co mmitte e (PC & ZAP) E nviro nme nta l Co mmissio n Pub lic He a ring City Co unc il Pub lic He a ring I nte rna l a nd E xte rna l Sta ke ho lde r Me e ting s

3 pub lic he a ring s

At le a st 4 sta ke ho lde r me e ting s

C&O Co mmitte e (PC & ZAP) July I nte rna l a nd E xte rna l Sta ke ho lde r Me e ting s July DI F M Co mmitte e (E nviro nme nta l Co mmissio n) July June July Aug ust Aug ust Aug ust Oc to b e r Pub lic E duc a tio n & Outre a c h

slide-39
SLIDE 39

Ne xt Ste ps

Pub lic He a ring s & Sta ke ho lde r Me e ting s

Che c k AustinT

e xas.gov/ atlas14 for de tails

Pub lic E

duc a tio n & Outre a c h

Post c ar

ds to pr

  • pe r

tie s in 100/ 500-ye ar floodplains

Ge ogr

aphic ally base d public me e tings

WPD sta ff to de te rmine a pplic a tio n o f ra infa ll va lue s

fo r Austin a re a (Oc t-De c 2018)

Rule s c ha ng e pro c e ss – DCM (Q2 o r Q3 o f F

Y 2019)

Re -ma pping o f Austin flo o dpla ins (2019 – 2021)

39

slide-40
SLIDE 40

Disc ussion/ Que stions?

slide-41
SLIDE 41

Rainfall De pth Change s (Pr e liminar y)

 Onio n Cre e k a t Buda ra in g a ug e

Re c ur r e nc e Inte r val (ye ar s) Annual Chanc e (% ) Rainfall T

  • tals (inc he s) for

Var ious Dur ations Inc r e ase in Rainfall T

  • tals (inc he s) for

Var ious Dur ations 1-hr 2-hr 3-hr 6-hr 12-hr 24-hr 1-hr 2-hr 3-hr 6-hr 12-hr 24-hr

2 50 2 2.6 2.8 3.2 3.7 4.2 0.3 0.4 0.5 0.5 0.6 0.8 5 20 2.3 3.4 3.9 4.7 5.4 6.1 0.0 0.5 0.8 1.1 1.3 1.1 10 11 3.1 4.2 4.9 5.9 6.8 7.7 0.4 0.8 1.2 1.7 2.0 1.6

25

4

3.7

5.3 6.3 7.6 8.7

9.8 0.4

1.1 1.7 2.5 2.8

2.2

50 2 4.2 6.1 7.2 8.9 10.2 11.5 0.4 1.2 1.9 3.0 3.3 2.6

100

1

4.7

7 8.3 10.1 11.7

13.2 0.3

1.3 2.2 3.3 3.7

3.0

41

slide-42
SLIDE 42

Rainfall De pth Change s (Pr e liminar y)

 Ca mp Ma b ry ra in g a ug e

Re c ur r e nc e Inte r val (ye ar s) Annual Chanc e (% ) Rainfall T

  • tals (inc he s) for

Var ious Dur ations Inc r e ase in Rainfall T

  • tals (inc he s) for

Var ious Dur ations 1-hr 2-hr 3-hr 6-hr 12-hr 24-hr 1-hr 2-hr 3-hr 6-hr 12-hr 24-hr

2 50 2 2.4 2.6 3.2 3.7 4.1 0.3 0.2 0.3 0.5 0.6 0.7 5 20 2.5 3.3 3.9 4.7 5.4 6 0.2 0.4 0.8 1.1 1.3 1.0 10 11 3.1 4.3 4.9 5.8 6.7 7.5 0.4 0.9 1.2 1.6 1.9 1.4

25

4

3.8

5.3 6.3 7.4 8.7

9.6 0.5

1.1 1.7 2.3 2.8

2.0

50 2 4.3 6.3 7.3 8.9 10.2 11.3 0.5 1.4 2.0 3.0 3.3 2.4

100

1

4.8

7.2 8.5 10.2 11.6

12.9 0.4

1.5 2.4 3.4 3.6

2.7

42

slide-43
SLIDE 43

43

Rule s c hange pr

  • c e ss – DCM

Se c tio n 2.4.3

Rainfall Inte nsity value update s Stor

m dr ain de sign

Se c tio n 2.5.1

Austin 24-Hour

Stor m Rainfall Distr ibution

T

ime line

Q2 or

Q3 of F Y 2019