October 17, 2019
Armstrong Park Community Input Meeting October 17, 2019 Master - - PowerPoint PPT Presentation
Armstrong Park Community Input Meeting October 17, 2019 Master - - PowerPoint PPT Presentation
Armstrong Park Community Input Meeting October 17, 2019 Master Plan Existing Parking Senior Center Existing Restrooms The Entry The Entry Monument Meadow Monument Beach Picnic Shade Flex Stations Fabric Berm Bridge Splashpad
Senior Center Existing Restrooms
The Meadow
Shade Umbrellas Picnic Stations Parkour Play
Existing StorageGroup Pavilion Grill Patio Study Grove Bench Seating
Picnic StationsExisting Amphitheater Shade Fabric
The City The Beach
Splashpad
The Hills
Trail with Interpretive Signage
The Village
Existing Parking Open Space Rolling Berm Sign Wall
The Woods
Existing Parking Existing Parking Berm Play Shaded Exercise Stations Entry Monument Entry Monument Entry Monument Flex Bridge Mural Wall
Seat WallsMaster Plan Phase 1 Improvements - Approved November 2018
Data Gathering
Topographic Survey
Schematic Design
Community Input Meeting
Design Development
Staff Review
Final Design
Construction Documents
Bidding & Construction
Phase 1 – Design Process
Senior Center Existing Restrooms Shade Umbrellas Picnic Stations
Existing StorageGroup Shelter Grill Patio Study Grove
HammocksExisting Amphitheater Shade Fabric Splashpad Existing Parking Open Space Rolling Berm Existing Parking Existing Parking Entry Monument Mechanical Enclosure Rolling Berm Playground
Site Plan
Senior Center Existing Restrooms Shade Umbrellas Picnic Stations
Existing StorageGroup Shelter Grill Patio Study Grove
HammocksExisting Amphitheater Shade Fabric Splashpad Open Space Rolling Berm Existing Parking Entry Monument Mechanical Enclosure Rolling Berm Playground
Site Plan
Playground Splashpad Existing Amphitheater
Section
Senior Center Existing Restrooms Shade Umbrellas Picnic Stations
Existing StorageGroup Shelter Grill Patio Study Grove
HammocksExisting Amphitheater Shade Fabric Splashpad Open Space Rolling Berm Existing Parking Entry Monument Mechanical Enclosure Rolling Berm Playground
Site Plan
Playground Splashpad Existing Amphitheater
Section
Sprayground
Sprayground
Shade Umbrellas Shade Umbrellas 18” HT. Seat Wall 18” HT. Seat Wall 18” HT. Seat Wall 18” HT. Seat Wall
Sprayground
Picnic Table Picnic Table Sprayground Sprayground
Sensory Exploration Interactive Play Immersive Experience
Users
Sensory Exploration Interactive Play Immersive Experience
Equipment Types
Sprayground
Interactive Play Interactive Play Sensory Exploration Sensory Exploration Immersive Experience Immersive Experience
Shade Umbrellas
Seat Walls
Site Furnishings
Site Furnishings Site Furnishings
Sprayground Concept
Picnic Area w/ SplashPad View Sprayground Concept
Sprayground Sprayground
Study Grove Study Grove
Tot Lot Tot Lot Arrival Arrival Swings Swings Signature Structure Signature Structure Rolling Berm Rolling Berm Group Shelter Group Shelter Picnic Tables Picnic Tables
Playground
Shade Fabric Shade Fabric Existing Shade Trees Existing Shade Trees Existing Shade Trees Existing Shade Trees Hammock Station Hammock Station Picnic Tables Picnic Tables Grill Grill
Arrival Art / Recongnition
Shade Fabric Structures
Pavilion Enhancements
Picnic Station
Study Grove
Leathers & Associates
Playground Plan
Playground Concept
Finalize Design
Winter / Spring 2020 Equipment Selection Engineering and Design
Construction Documents
Summer 2020 Construction Documents Fall/Winter – Bidding and Construction Spring 2021 – Grand Opening
Next Steps
Questions?
Senior Center Existing Restrooms Shade Umbrellas Picnic Stations
Existing StorageGroup Shelter Grill Patio Study Grove
HammocksExisting Amphitheater Shade Fabric Splashpad Existing Parking Open Space Rolling Berm Existing Parking Existing Parking Entry Monument Mechanical Enclosure Rolling Berm Playground
Site Plan