P AOL I P IKE C ORRIDOR M AST R P L AN E Presentation to the East Goshen Township Board of Supervisors April 4, 2017 P RE Central Chester County Bicycle and 2013 VIOUS P L Pedestrian Plan ANS AND S T 2014 UDIE S 2015 Comprehensive Plan


slide-1
SLIDE 1

PAOL

I PIKE C ORRIDOR MAST E R PL AN

Presentation to the East Goshen Township Board of Supervisors April 4, 2017

slide-2
SLIDE 2

Central Chester County Bicycle and Pedestrian Plan Comprehensive Plan Update Parks, Recreation, and Open Space Plan Paoli Pike Trail Feasibility Study and Master Plan Paoli Pike Corridor Master Plan

PRE

VIOUS PL ANS AND ST UDIE S 2013 2014 2015 2016 2017

slide-3
SLIDE 3

PAOL

I PIKE T RAIL

ST

AT US

Pursuing funding for design and construction

WCASD Middle & High School Campus

A & B C

Design: Underway Construction: Anticipated 2019/2020 Grant Funding: $1.736 million Design: Underway Construction: Anticipated 2017/2018 Grant Funding: $418,000 Design: Underway Construction: Anticipated 2019/2020 Grant Funding: $1 million

Airport Roa d to Re se r voir Roa d Boot Roa d to Route 352 Route 352 to E xisting T ra ils in Apple brook Pa rk Re se r voir Roa d to Boot Roa d

slide-4
SLIDE 4

PROJE

CT

O VE

RVIE W

T

  • wn Ce nte r Stre e tsc a pe Pla n— T

a sk 5 T ra ffic Ca lming Pla n— T a sk 4 Ne ig hborhood a nd Community Conne c tions Pla n— T a sk 3 L a nd use a nd E c onomic Ana lysis— T a sk 6 Wa yfinding Pla n— T a sk 7

 Consultant Team  Prime: McMahon Associates, Inc.  Sub‐consultant: Thomas Comitua Associates, Inc.  Budget and Funding  Transportation and Community Development Initiative (TCDI): $ 52,500  Township Funds: $22,300  Total: $74,800  Scope of Work

Imple me ntation Pla n— T a sk 8

slide-5
SLIDE 5

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Dec Nov 2— Exisng Condions 3—Neighborhood & Community Connecons Plan

Commiee Meeng #1 3/9/2017 PennDOT & CCPC TBD

Informaon and documents available for review and comment online

Commiee Meeng #2 5/11/2017 Commiee Meeng #3 8/17/2017 Public Meeng #2 6/27/2017

1—Project Management 10—Stakeholder and Public Involvement

Public Meeng #1 4/4/2017 Dra Report for Staff & Commiee Review Commiee Meeng #4 10/12/2017 Dra Report for Public Comment Final Report

9 — Dra & Final Report 4—Traffic Calming Plan 5—Town Center Streetscape Plan 6—Land Use & Economic Analysis 7—Wayfinding Plan 8— Implementaon Plan

Board of Supervisors Presentaon 11/14/2017 Planning Commission 6/7/2017 PAOL

I PIKE C ORRIDOR MAST E R PL AN

SC HEDULE

slide-6
SLIDE 6

DRAF T VISION & G OAL

S

MAKE PAOL

I PIKE A DE ST INAT ION

Conne c t pe ople to the Pao li Pike T

rail and o the r plac e s alo ng the Co rrido r to suppo rt alte rnative mo de s o f transpo rtatio n and e xpand

  • ppo rtunities fo r rec reatio n

Ca lm tra ffic alo ng the Pao li Pike Co rrido r to c reate a safe and

c o mfo rtable e nviro nme ntal fo r walking, biking, and driving

E

nha nc e the T

  • wn Ce nte r to suppo rt c o mmerc e and pro mo te

c o mpac t, mixed-use , walkable de ve lo pme nt with appro priate amenities

Ac tiva te the c o rrido r thro ugh pro grams and c o mmunity e ve nts to

enc o urage peo ple to walk, bike, eat, sho p, and play alo ng Pao li Pike

slide-7
SLIDE 7

NE

IGHBORHOOD C ONNE CT IONS— F ACIL IT IE S T OOL BOX

Ro ute, Alignment, F ac ility T ype….and Prio ritizatio n

slide-8
SLIDE 8

NE

IGHBORHOOD C ONNE CT IONS— O VE RVIE W

slide-9
SLIDE 9

NE

IGHBORHOOD C ONNE CT IONS— PRE L IMINARY PRIORIT IE S

Boot Roa d— South Bow T r e e Conne c tion Re se rvoir Roa d

Re se rvoir Roa d

slide-10
SLIDE 10

T

RAF F IC C AL MING C ONCE PT UAL

PL

ANS

Airport Roa d to E llis L a ne At T

  • wnship Pa rk Drive wa y

L ine Roa d



Hardscape Gateway Median



Realignment of Travel Lanes



Larger Pedestrian Refuge Island



High Visibility Crosswalks



Gateway Sign (Existing)



Hardscape Gateway Median



Pedestrian Flashing Beacon (Existing)



Painted Rumble Strips



Hardscape or Landscaped Gateway Median (Option s)



Gateway Signs (Existing)

slide-11
SLIDE 11

NE

XT

ST

E PS

 Refine Neighborhood Connections & Traffic Calming Plans  Develop Draft Conceptual Plan

 Priority Neighborhood Connections  Town Center Streetscape

 Land Use & Economic Analysis  Public Meeting #2

 June 27, 2017; Open House at 6pm; Presentation at 7pm