P AOL I P IKE C ORRIDOR M AST R P L AN E Presentation to the East Goshen Township Board of Supervisors April 4, 2017 P RE Central Chester County Bicycle and 2013 VIOUS P L Pedestrian Plan ANS AND S T 2014 UDIE S 2015 Comprehensive Plan
Central Chester County Bicycle and Pedestrian Plan Comprehensive Plan Update Parks, Recreation, and Open Space Plan Paoli Pike Trail Feasibility Study and Master Plan Paoli Pike Corridor Master Plan
PRE
VIOUS PL ANS AND ST UDIE S 2013 2014 2015 2016 2017
PAOL
I PIKE T RAIL
ST
AT US
Pursuing funding for design and construction
WCASD Middle & High School Campus
A & B C
Design: Underway Construction: Anticipated 2019/2020 Grant Funding: $1.736 million Design: Underway Construction: Anticipated 2017/2018 Grant Funding: $418,000 Design: Underway Construction: Anticipated 2019/2020 Grant Funding: $1 million
Airport Roa d to Re se r voir Roa d Boot Roa d to Route 352 Route 352 to E xisting T ra ils in Apple brook Pa rk Re se r voir Roa d to Boot Roa d
PROJE
CT
O VE
RVIE W
T
- wn Ce nte r Stre e tsc a pe Pla n— T
a sk 5 T ra ffic Ca lming Pla n— T a sk 4 Ne ig hborhood a nd Community Conne c tions Pla n— T a sk 3 L a nd use a nd E c onomic Ana lysis— T a sk 6 Wa yfinding Pla n— T a sk 7
Consultant Team Prime: McMahon Associates, Inc. Sub‐consultant: Thomas Comitua Associates, Inc. Budget and Funding Transportation and Community Development Initiative (TCDI): $ 52,500 Township Funds: $22,300 Total: $74,800 Scope of Work
Imple me ntation Pla n— T a sk 8
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Dec Nov 2— Exisng Condions 3—Neighborhood & Community Connecons Plan
Commiee Meeng #1 3/9/2017 PennDOT & CCPC TBD
Informaon and documents available for review and comment online
Commiee Meeng #2 5/11/2017 Commiee Meeng #3 8/17/2017 Public Meeng #2 6/27/2017
1—Project Management 10—Stakeholder and Public Involvement
Public Meeng #1 4/4/2017 Dra Report for Staff & Commiee Review Commiee Meeng #4 10/12/2017 Dra Report for Public Comment Final Report
9 — Dra & Final Report 4—Traffic Calming Plan 5—Town Center Streetscape Plan 6—Land Use & Economic Analysis 7—Wayfinding Plan 8— Implementaon Plan
Board of Supervisors Presentaon 11/14/2017 Planning Commission 6/7/2017 PAOL
I PIKE C ORRIDOR MAST E R PL AN
SC HEDULE
DRAF T VISION & G OAL
S
MAKE PAOL
I PIKE A DE ST INAT ION
Conne c t pe ople to the Pao li Pike T
rail and o the r plac e s alo ng the Co rrido r to suppo rt alte rnative mo de s o f transpo rtatio n and e xpand
- ppo rtunities fo r rec reatio n
Ca lm tra ffic alo ng the Pao li Pike Co rrido r to c reate a safe and
c o mfo rtable e nviro nme ntal fo r walking, biking, and driving
E
nha nc e the T
- wn Ce nte r to suppo rt c o mmerc e and pro mo te
c o mpac t, mixed-use , walkable de ve lo pme nt with appro priate amenities
Ac tiva te the c o rrido r thro ugh pro grams and c o mmunity e ve nts to
enc o urage peo ple to walk, bike, eat, sho p, and play alo ng Pao li Pike
NE
IGHBORHOOD C ONNE CT IONS— F ACIL IT IE S T OOL BOX
Ro ute, Alignment, F ac ility T ype….and Prio ritizatio n
NE
IGHBORHOOD C ONNE CT IONS— O VE RVIE W
NE
IGHBORHOOD C ONNE CT IONS— PRE L IMINARY PRIORIT IE S
Boot Roa d— South Bow T r e e Conne c tion Re se rvoir Roa d
Re se rvoir Roa d
T
RAF F IC C AL MING C ONCE PT UAL
PL
ANS
Airport Roa d to E llis L a ne At T
- wnship Pa rk Drive wa y
L ine Roa d
Hardscape Gateway Median
Realignment of Travel Lanes
Larger Pedestrian Refuge Island
High Visibility Crosswalks
Gateway Sign (Existing)
Hardscape Gateway Median
Pedestrian Flashing Beacon (Existing)
Painted Rumble Strips
Hardscape or Landscaped Gateway Median (Option s)
Gateway Signs (Existing)
NE
XT
ST
E PS
Refine Neighborhood Connections & Traffic Calming Plans Develop Draft Conceptual Plan
Priority Neighborhood Connections Town Center Streetscape
Land Use & Economic Analysis Public Meeting #2
June 27, 2017; Open House at 6pm; Presentation at 7pm