Uttarakhand Simply Heaven Presentor: Dr. Umakant Panwar, Secretary, - - PowerPoint PPT Presentation

uttarakhand simply heaven
SMART_READER_LITE
LIVE PREVIEW

Uttarakhand Simply Heaven Presentor: Dr. Umakant Panwar, Secretary, - - PowerPoint PPT Presentation

Uttarakhand Simply Heaven Presentor: Dr. Umakant Panwar, Secretary, Power and Tourism Uttarakhand Dev Bhoomi A Benediction On Earth Investment Opportunities HYDRO POWER GENERATION TOURISM SECTOR AGRO AND FOOD PROCESSING


slide-1
SLIDE 1

Uttarakhand – Simply Heaven

Presentor: Dr. Umakant Panwar, Secretary, Power and Tourism

slide-2
SLIDE 2

Uttarakhand Dev Bhoomi

“A Benediction On Earth” Investment

Opportunities

 HYDRO POWER GENERATION  TOURISM SECTOR  AGRO AND FOOD PROCESSING INDUSTRY  MANUFACTURING  PHARMACEUTICAL INDUSTRY  INFORMATION TECHNOLOGY/ IT ENABLED SERVICES, BIOTECHNOLOGY, HERBAL AND MEDICINAL PLANTS

slide-3
SLIDE 3

Area: 53,483 sq.km. Population: 101.17 lakh Capital: Dehradun(Temporary) Districts: 13 Literacy Rate: 79.63%

slide-4
SLIDE 4
slide-5
SLIDE 5

Investment Opportunities Through PPP Model in Hydro Sector

slide-6
SLIDE 6

Estimated Hydro Power Potential of Uttarakhand

Total Hydro Potential

  • 27,039 MW

Projects Under Operation

  • 3641.29 MW

Projects Under Construction

  • 2248.02 MW

Projects DPR Approved, Clearances obtained/Under Process - 4352.65 MW Projects for which DPR Prepared - 8767.50 MW Projects under Survey & Investigation - 8767.50 MW

slide-7
SLIDE 7

UJVN Limited

Projects Capacity (MW) Under Operation 1296.10 Under Construction 168.50 Projects DPR Approved, Clearances obtained/Under Process 832.50 Projects for which DPR Prepared 1475.00 Projects under Survey & Investigation 984.80 Total 4756.90

slide-8
SLIDE 8
  • Investment Opportunities- Hydro

Projects

  • through PPP mode
  • In JV with State Power Generating Utility
  • free equity over & above 26%
  • And free power
slide-9
SLIDE 9

Investment Opportunities- Hydro Projects

Joint Venture Possibilities

S. No. Project Capacity (MW) Name of River District

Estimated Cost

  • Rs. in Crores

1 Tamak Lata 250 Dhauliganga Chamoli 1053 2 Bowla Nand Prayag 300 Alaknanda Chamoli 3007 3 Nand Prayag Langasu 100 Alaknanda Chamoli 1401 Total 650 5461

slide-10
SLIDE 10

Investment Opportunities- BOOT Basis

S. No. Project Name of River District Capacity (MW) 1 Utyasu Stage I to VI Alaknanda Rudraprayag 745 2 Ming – Nalgaon Pindar Pithoragarh 114 3 Garbyang Mahakali Pithoragarh 108 4 Budhi Mahakali Pithoragarh 192 5 Malipa Mahakali Pithoragarh 138 6 Tawaghat Tapovan Mahakali Pithoragarh 105 7 Tapovan Kalika Mahakali Pithoragarh 160 8 Kalika Baluwakot Mahakali Pithoragarh 120 Total 1682

slide-11
SLIDE 11

Investment Opportunities- in small Hydro projects Construction & Consultancy

  • S. No.

Project River District Capacity (MW) 1 Guptkashi Ravanganga Rudraprayag 1.3 2 Asiganga-III Asiganga Uttarkashi 9.0 3 Chamoli Kailganga Chamoli 4.0 4 Pilangad-II Pilangad Uttarkashi 4.0 5 Sonegad Sonegad Uttarkashi 7.5 6 Painagad Painagad Pithoragarh 9.0 7 Suringad-II Suringad Pithoragarh 5.0 8 Tankul Shyamkholigad Pithoragarh 12.0 9 Urgam-II Kalpganga Chamoli 10.0 10 Bhilangana 2A Bhilangana Tehri 24.0 11 Bhilangana 2B Bhilangana Tehri 21.0 12 Bhilangana 2C Bhilangana Tehri 21.0 Total 127.8

slide-12
SLIDE 12

Investment Opportunities- Renovation Modernization & Upgradation

S. No. Name of projects Total Capacity (MW) Investment (Million US $ / Rs. Crores) Additional Energy Benefits GWh (MU) 1 DHAKRANI 33.75 117 23 2 DHALIPUR 51 117 36 3 KHODRI 120 170 38 4 CHIBRO 240 185 77 5 TILOTH 90 127 38 6 RAMGANGA 198 351 167 7 CHILLA 144 300 390 Total 906 1367 769

slide-13
SLIDE 13

Tourism Sector Disaster and/or opportunity?

…..Rebuilding Build Back Better and Bigger….. and Beautiful New Possibilities…

Invest now!

slide-14
SLIDE 14

Loss of Connectivity, Roads, Bridges, Building, Water, Power suppy….

Opportunities in Infrastructure

  • World Class Roads, Ropeways
  • Parking places
  • Bridges
  • Shelters, prefab structures, Schools, Hospitals, Houses
  • Water supply schemes
  • Power, Solar power

Form Disaster is born Opportunity

slide-15
SLIDE 15

Opportunity in Tourism

  • Services
  • Transport
  • Hospitality

Form Disaster is born Opportunity

slide-16
SLIDE 16

Energy Department, Government of Uttarakhand

Government will spend 5000 crores ….in 3-5 years This means… Massive opportunities for you Civil contracts, New businesses

Parallel investment in assets, businesses

Opportunities

slide-17
SLIDE 17

Energy Department, Government of Uttarakhand

Why should you invest in Uttarakhand Tourism

slide-18
SLIDE 18
slide-19
SLIDE 19

Demand Supply Gap….. Opportunities  Lack of Classified Hotels

(1 five star, 1 four star, 8 three star)

Sever shortage of accommodation units,

e.g. hygiene, staff, basic amenities, trained staff, house keeping..

 Virtual non-existence of Public Private Partnership in Tourism sector

slide-20
SLIDE 20

 Pilgrimage  Spiritual Tourism  Eco-Tourism  Wild Life  Mountaineering  Skiing  Adventure Water Sports  Health and Wellness  Leisure Tourism  Cultural Tourism  Heritage Tourism  Rural Tourism

A Comprehensive Destination for All

slide-21
SLIDE 21

 Environment  6 National Parks, 6 Wild Life Reserves & 1 Biosphere Reserve  Nature and Beauty  Peaks, rivers, waterfalls, rapids, glaciers, etc..  Highest religious shrines and Dhaams  100 + Popular Trekking routes and circuits  83 Scalable Peaks  Ski Slopes and Alpine Meadows  Lakes and Reservoirs  Peace loving community (Best law and order)

slide-22
SLIDE 22

 Jolly Grant Airport, Dehradun – Daily Flights from Delhi, Lucknow and Mumbai  Pantnagar, Chinayalisaur & Gauchar Air Strips Operational  Naini Saini Airport, Pithoragarh – Under enhancement  29 Heliports under construction (50 helpads and ports)

Air Connectivity

slide-23
SLIDE 23

Tehri – Mega Project

slide-24
SLIDE 24

Energy Department, Government of Uttarakhand

Lake Tehri is one of the largest lakes in Asia We want to make it a favourite destination in the world On the lines of best Lake and Water Front Developments International India Tehri – Mega Project

slide-25
SLIDE 25

Tehri Mega Poject

  • Govt Infrastructure

100 crores

  • Tehri Lake

Development Authority

  • 5000 crores in 5

years

  • Private Investment
slide-26
SLIDE 26

Energy Department, Government of Uttarakhand

Tehri – A Planned Destination for All

  • Budget to Luxury

Hotels

  • Clubs, Resorts & Spas
  • Theme Parks
  • Shopping Centres
  • Villas & Apartments
  • Studio & Serviced

Apartments

  • Rental & Retiree

Housing

  • Family Entertainment

Centres

  • Promenade and

Marinas

  • Health & Wellness

Centres

  • Social Infrastructure
  • National Adventure

Academy

  • Olympic Level Water

Sports

  • Lake Cruises
  • Food Courts
  • Eco Safaris
  • Water & Adventure

Sports

  • Nature Trails
  • House Boats
  • Scuba Diving
  • Birding Center
  • Floating Marinas

Work & Live Leisure

  • Schools & Colleges
  • Executive Education

Centres

  • Adventure Training

Institutes

  • Edutainment Parks
  • Non-polluting

Industries

  • Handicrafts, Arts and

Culture

  • Fisheries
  • Biotechnology

Institutes and R&D Centres

  • Convention Centre
  • Management Services

Adventure & Sports

Development at Tehri has been initiated

slide-27
SLIDE 27

Major Land Banks & Tourism Assets

A. Hathi Paon – George Everest Estate – 171 Acres, Dist. Dehradun

  • B. Khanij Nagar – Mussoorie Hills –

54 Acres, Dist. Dehradun C. Abbott Mount (Dist - Champawat) 60 Acres, D. Tehri Lake 100 Acres ++ E. Dayara Bugyal (Dist. Uttarkashi) 100 Acres ++.

LAND BANKS

slide-28
SLIDE 28

Tourism Assets TOURISM ASSETS AVAILABLE ON PPP MODE

  • Ropeway Projects
  • Existing Guest Houses
  • GMVN, KMVN, PWD, Forest, Irrigation
  • Eco Tourism Projects and Clusters
slide-29
SLIDE 29

29

slide-30
SLIDE 30

1. Environment Friendly (minimal disturbance to forest / wildlife) 2. Fast and convenient mode of travel (environment monitoring can be done more frequently) 3. Time - tested established Technologies available 4. Limiting human intervention at terminal points thereby contributing to the environment 5. Fast & easy evacuation in the event of uncertainties

slide-31
SLIDE 31

SPV Environment Clearance Forest Clearance / Lease Wildlife Clearance

  • Pvt. land / ROW

Procurement State Govt. Approvals

 Uttarakhand Infrastructure Project Company (UIPC) – A Joint Venture

between Govt. of Uttarakhand and IL&FS

 Mandated to develop infrastructure projects on PPP format.

slide-32
SLIDE 32

Preliminary Traffic Survey / Conceptualisation Topographic Survey / Geotech investigations Ropeway Alignment / Design & Costing Clearances & Approvals Marketing / Bid Process Management

Project Identification

Award to PPP Player

  • Ensuring all critical clearances
  • Minimising Implementation Risk – an

attractive proposition for private investor

slide-33
SLIDE 33
slide-34
SLIDE 34

Aerial Passenger ropeway of about 3.8 kms from Janki-chatti to Yamunotri Temple (Uttarkashi) Project awarded on PPP - based on imported Technology Estimated Completion Time: 3 years Project Cost: Rs. 75 crores

slide-35
SLIDE 35

Aerial Passenger ropeway system of about 900 meters from Jwala Temple to Purnagiri Temple (Champawat) Project awarded on PPP - based on imported Technology Estimated Completion Time: 2 years Project Cost: Rs. 35 crores

slide-36
SLIDE 36

Project awarded on PPP - based on imported Technology Estimated Completion Time: 1.5 years

LTP – near pony stand UTP – adjacent to Temple 500 m - length Aerial Passenger ropeway system of about 500 at Surkundadevi Temple (Tehri)

Project Cost:

  • Rs. 5 crores
slide-37
SLIDE 37
slide-38
SLIDE 38

The alignment is proposed in 2 Parts: Part 1: Ghangharia to Hemkund Sahib - 2000 m Part 2: Govindghat to Ghangharia (3 Sections) - 11,350 m

  • Govindghat to Bhiundar (5800 m)
  • Bhiundar to area near Laksman Ganga

(3400 m)

  • Area near Laksman Ganga and Helipad

near Ghangharia (2150 m) Tentative Length of Alignment: ~ 13 kms Tentative Capacity: 1000-500 PPH

Aerial Passenger ropeway system of 13 kms from Govindghat to Hemkund Sahib (Chamoli)

Total Project Cost: Rs. 300 crores

slide-39
SLIDE 39

39

Ghangaria to Hemkund Sahib

4179 m 3175 m

slide-40
SLIDE 40
slide-41
SLIDE 41

Purkul, Dehradun Altitude: 923.2 m Area: 42.75 acres Lambidhar Altitude: 1719.16 m Area: 8.6 acres Hathipaon Altitude: 1995.27 m Area: 30.93 acres Radha House Altitude: 2083.81 m Mussoorie Altitude: 1992.57 m Area: 4.25 acres

Section I Section II Total Project Cost:

  • Rs. 500 crores
slide-42
SLIDE 42

Suggested Ropeway features – Section I

 Length of the Ropeway –

4.225 kilometers

 Time of travel –

13 min (one way)

 The ropeway has been

designed for 500 PPHD

 The proposed technology is

Bi-cable Gondola (Jig Back) System

 Ease of boarding and de-

boarding

 Can run at reasonable speed of

8.5-10 m/s

slide-43
SLIDE 43
slide-44
SLIDE 44

Project Site ACCESSIBLITY (Bhatwari)

  • Uttarkashi

30 kms

  • Gangotri Dham

50 kms

  • Chinyalisaur (airstrip)

65 kms

  • T

ehri 125 kms

  • Rishikesh

180 kms

  • Jolly Grant (Airport)

220 kms

slide-45
SLIDE 45

DAYARA RAITHAL UTP

PROPOSED LINK

BHATWARI LTP BARSU MATHAINA BARNALA

Mathaina:

Main Ski Resort Development / Time Share Cottages/ LTP

Barsu:

Parking for vehicles Rest rooms/ Utility services

Selected Project Alignment

Dayara – Barnala – Mathaina Since Methana has an accessibility issue as it is connected to Barsu by a one km trek.

  • It is proposed to have a another ropeway

from Barsu village to Mathaina Mathaina - Barsu

  • to add accessibility to the Ski resort site at

Mathaina, a ropeway from Barsu was finalised

  • The ropeway will carry the people, who

park the vehicles at Barsu, to Mathaina

  • The existing trek will also be upgraded for a

back up access facility

slide-46
SLIDE 46
slide-47
SLIDE 47

Kedarnath Ropeway Project

Gaurikund Linchauli Kedarnath Temple

One of the most ambitious project

  • f the Uttarakhand Government
slide-48
SLIDE 48

48