uttarakhand simply heaven
play

Uttarakhand Simply Heaven Presentor: Dr. Umakant Panwar, Secretary, - PowerPoint PPT Presentation

Uttarakhand Simply Heaven Presentor: Dr. Umakant Panwar, Secretary, Power and Tourism Uttarakhand Dev Bhoomi A Benediction On Earth Investment Opportunities HYDRO POWER GENERATION TOURISM SECTOR AGRO AND FOOD PROCESSING


  1. Uttarakhand – Simply Heaven Presentor: Dr. Umakant Panwar, Secretary, Power and Tourism

  2. Uttarakhand Dev Bhoomi “ A Benediction On Earth” Investment Opportunities  HYDRO POWER GENERATION  TOURISM SECTOR  AGRO AND FOOD PROCESSING INDUSTRY  MANUFACTURING  PHARMACEUTICAL INDUSTRY  INFORMATION TECHNOLOGY/ IT ENABLED SERVICES, BIOTECHNOLOGY, HERBAL AND MEDICINAL PLANTS

  3. Area: 53,483 sq.km. Population: 101.17 lakh Capital: Dehradun(Temporary) Districts: 13 Literacy Rate: 79.63%

  4. Investment Opportunities Through PPP Model in Hydro Sector

  5. Estimated Hydro Power Potential of Uttarakhand Total Hydro Potential - 27,039 MW Projects Under Operation - 3641.29 MW Projects Under Construction - 2248.02 MW Projects DPR Approved, Clearances obtained/Under Process - 4352.65 MW Projects for which DPR Prepared - 8767.50 MW Projects under Survey & Investigation - 8767.50 MW

  6. UJVN Limited Projects Capacity (MW) Under Operation 1296.10 Under Construction 168.50 Projects DPR Approved, Clearances obtained/Under Process 832.50 Projects for which DPR Prepared 1475.00 Projects under Survey & Investigation 984.80 Total 4756.90

  7. • Investment Opportunities- Hydro Projects • through PPP mode • In JV with State Power Generating Utility • free equity over & above 26% • And free power

  8. Investment Opportunities- Hydro Projects Joint Venture Possibilities S. Project Capacity Name of District Estimated Cost No. (MW) River Rs. in Crores 1 Tamak Lata 250 1053 Dhauliganga Chamoli 2 Bowla 300 Alaknanda Chamoli 3007 Nand Prayag 3 Nand Prayag 100 Alaknanda Chamoli 1401 Langasu Total 650 5461

  9. Investment Opportunities- BOOT Basis S. Project Name of Capacity District No. River (MW) 1 Utyasu Stage I to VI Alaknanda Rudraprayag 745 2 Ming – Nalgaon Pindar Pithoragarh 114 3 Garbyang Mahakali Pithoragarh 108 4 Budhi Mahakali Pithoragarh 192 5 Malipa Mahakali Pithoragarh 138 6 Tawaghat Tapovan Mahakali Pithoragarh 105 7 Tapovan Kalika Mahakali Pithoragarh 160 8 Kalika Baluwakot Mahakali Pithoragarh 120 Total 1682

  10. Investment Opportunities- in small Hydro projects Construction & Consultancy S. No. Project River District Capacity (MW) 1 Guptkashi Ravanganga Rudraprayag 1.3 2 Asiganga-III Asiganga Uttarkashi 9.0 3 Chamoli Kailganga Chamoli 4.0 4 Pilangad-II Pilangad Uttarkashi 4.0 5 Sonegad Sonegad Uttarkashi 7.5 6 Painagad Painagad Pithoragarh 9.0 7 Suringad-II Suringad Pithoragarh 5.0 8 Tankul Shyamkholigad Pithoragarh 12.0 9 Urgam-II Kalpganga Chamoli 10.0 10 Bhilangana 2A Bhilangana Tehri 24.0 11 Bhilangana 2B Bhilangana Tehri 21.0 12 Bhilangana 2C Bhilangana Tehri 21.0 Total 127.8

  11. Investment Opportunities- Renovation Modernization & Upgradation Investment Additional Total S. Name of (Million US Energy Capacity No. projects $ / Rs. Benefits (MW) Crores) GWh (MU) 1 DHAKRANI 33.75 117 23 2 DHALIPUR 51 117 36 KHODRI 120 170 38 3 4 CHIBRO 240 185 77 5 TILOTH 90 127 38 6 RAMGANGA 198 351 167 7 CHILLA 144 300 390 Total 906 1367 769

  12. Tourism Sector Disaster and/or opportunity? …..Rebuilding Build Back Better and Bigger….. and Beautiful New Possibilities… Invest now!

  13. Form Disaster is born Opportunity Loss of Connectivity, Roads, Bridges, Building, Water, Power suppy …. Opportunities in Infrastructure  World Class Roads, Ropeways  Parking places  Bridges  Shelters, prefab structures, Schools, Hospitals, Houses  Water supply schemes  Power, Solar power

  14. Form Disaster is born Opportunity Opportunity in Tourism  Services  Transport  Hospitality

  15. Opportunities Government will spend 5000 crores ….in 3 -5 years This means… Massive opportunities for you Civil contracts, New businesses Parallel investment in assets, businesses Energy Department, Government of Uttarakhand

  16. Why should you invest in Uttarakhand Tourism Energy Department, Government of Uttarakhand

  17. Demand Supply Gap….. Opportunities  Lack of Classified Hotels (1 five star, 1 four star, 8 three star) Sever shortage of accommodation units, e.g. hygiene, staff, basic amenities, trained staff, house keeping..  Virtual non-existence of Public Private Partnership in Tourism sector

  18. A Comprehensive Destination for All  Pilgrimage  Spiritual Tourism  Eco-Tourism  Wild Life  Mountaineering  Skiing  Adventure Water Sports  Health and Wellness  Leisure Tourism  Cultural Tourism  Heritage Tourism  Rural Tourism

  19.  Environment  6 National Parks, 6 Wild Life Reserves & 1 Biosphere Reserve  Nature and Beauty  Peaks, rivers, waterfalls, rapids, glaciers, etc..  Highest religious shrines and Dhaams  100 + Popular Trekking routes and circuits  83 Scalable Peaks  Ski Slopes and Alpine Meadows  Lakes and Reservoirs  Peace loving community (Best law and order)

  20. Air Connectivity  Jolly Grant Airport, Dehradun – Daily Flights from Delhi, Lucknow and Mumbai  Pantnagar, Chinayalisaur & Gauchar Air Strips Operational  Naini Saini Airport, Pithoragarh – Under enhancement  29 Heliports under construction (50 helpads and ports)

  21. Tehri – Mega Project

  22. Tehri – Mega Project Lake Tehri is one of the largest lakes in Asia We want to make it a favourite destination in the world On the lines of best Lake and Water Front Developments International India Energy Department, Government of Uttarakhand

  23. Tehri Mega Poject • Govt Infrastructure 100 crores • Tehri Lake Development Authority • 5000 crores in 5 years • Private Investment

  24. Tehri – A Planned Destination for All Adventure & Sports Work & Live Leisure • National Adventure • Schools & Colleges • Budget to Luxury • Executive Education Academy Hotels • Olympic Level Water • Clubs, Resorts & Spas Centres • Adventure Training • Theme Parks Sports • Lake Cruises • Shopping Centres Institutes • Food Courts • Edutainment Parks • Villas & Apartments • Eco Safaris • Non-polluting • Studio & Serviced • Water & Adventure Industries Apartments • Handicrafts, Arts and • Rental & Retiree Sports • Nature Trails Culture Housing • House Boats • Fisheries • Family Entertainment • Scuba Diving • Biotechnology Centres • Birding Center • Promenade and Institutes and R&D • Floating Marinas Centres Marinas • Convention Centre • Health & Wellness • Management Services Centres • Social Infrastructure Development at Tehri has been initiated Energy Department, Government of Uttarakhand

  25. Major Land Banks & Tourism Assets LAND BANKS Hathi Paon – George Everest Estate – A. 171 Acres, Dist. Dehradun B. Khanij Nagar – Mussoorie Hills – 54 Acres, Dist. Dehradun C. Abbott Mount (Dist - Champawat) 60 Acres, D. Tehri Lake 100 Acres ++ E. Dayara Bugyal (Dist. Uttarkashi) 100 Acres ++.

  26. Tourism Assets TOURISM ASSETS AVAILABLE ON PPP MODE • Ropeway Projects • Existing Guest Houses • GMVN, KMVN, PWD, Forest, Irrigation • Eco Tourism Projects and Clusters

  27. 29

  28. 1. Environment Friendly (minimal disturbance to forest / wildlife) 2. Fast and convenient mode of travel (environment monitoring can be done more frequently) 3. Time - tested established Technologies available 4. Limiting human intervention at terminal points thereby contributing to the environment 5. Fast & easy evacuation in the event of uncertainties

  29.  Uttarakhand Infrastructure Project Company (UIPC) – A Joint Venture between Govt. of Uttarakhand and IL&FS  Mandated to develop infrastructure projects on PPP format. State Govt. Approvals Pvt. land / ROW Environment Procurement Clearance SPV Forest Wildlife Clearance / Clearance Lease

  30. Clearances & Award to Approvals PPP Player Marketing / Bid Process Management Topographic Ropeway Survey / Geotech Alignment / investigations Design & Costing Preliminary Traffic Survey / • Ensuring all critical clearances Conceptualisation • Minimising Implementation Risk – an Project Identification attractive proposition for private investor

  31. Aerial Passenger ropeway of about 3.8 kms from Janki-chatti to Yamunotri Temple (Uttarkashi) Project awarded on PPP - based on imported Technology Project Cost: Rs. 75 crores Estimated Completion Time: 3 years

  32. Aerial Passenger ropeway system of about 900 meters from Jwala Temple to Purnagiri Temple (Champawat) Project awarded on PPP - based on imported Technology Project Cost: Rs. 35 crores Estimated Completion Time: 2 years

  33. Aerial Passenger ropeway system of about 500 at Surkundadevi Temple (Tehri) Project awarded on PPP - based on imported Technology Estimated Completion Time: 1.5 years Project Cost: UTP – adjacent to Temple Rs. 5 crores 500 m - length LTP – near pony stand

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend