Uttarakhand – Simply Heaven
Presentor: Dr. Umakant Panwar, Secretary, Power and Tourism
Uttarakhand Simply Heaven Presentor: Dr. Umakant Panwar, Secretary, - - PowerPoint PPT Presentation
Uttarakhand Simply Heaven Presentor: Dr. Umakant Panwar, Secretary, Power and Tourism Uttarakhand Dev Bhoomi A Benediction On Earth Investment Opportunities HYDRO POWER GENERATION TOURISM SECTOR AGRO AND FOOD PROCESSING
Presentor: Dr. Umakant Panwar, Secretary, Power and Tourism
HYDRO POWER GENERATION TOURISM SECTOR AGRO AND FOOD PROCESSING INDUSTRY MANUFACTURING PHARMACEUTICAL INDUSTRY INFORMATION TECHNOLOGY/ IT ENABLED SERVICES, BIOTECHNOLOGY, HERBAL AND MEDICINAL PLANTS
Estimated Hydro Power Potential of Uttarakhand
Total Hydro Potential
Projects Under Operation
Projects Under Construction
Projects DPR Approved, Clearances obtained/Under Process - 4352.65 MW Projects for which DPR Prepared - 8767.50 MW Projects under Survey & Investigation - 8767.50 MW
UJVN Limited
Projects Capacity (MW) Under Operation 1296.10 Under Construction 168.50 Projects DPR Approved, Clearances obtained/Under Process 832.50 Projects for which DPR Prepared 1475.00 Projects under Survey & Investigation 984.80 Total 4756.90
Investment Opportunities- Hydro Projects
Joint Venture Possibilities
S. No. Project Capacity (MW) Name of River District
Estimated Cost
1 Tamak Lata 250 Dhauliganga Chamoli 1053 2 Bowla Nand Prayag 300 Alaknanda Chamoli 3007 3 Nand Prayag Langasu 100 Alaknanda Chamoli 1401 Total 650 5461
Investment Opportunities- BOOT Basis
S. No. Project Name of River District Capacity (MW) 1 Utyasu Stage I to VI Alaknanda Rudraprayag 745 2 Ming – Nalgaon Pindar Pithoragarh 114 3 Garbyang Mahakali Pithoragarh 108 4 Budhi Mahakali Pithoragarh 192 5 Malipa Mahakali Pithoragarh 138 6 Tawaghat Tapovan Mahakali Pithoragarh 105 7 Tapovan Kalika Mahakali Pithoragarh 160 8 Kalika Baluwakot Mahakali Pithoragarh 120 Total 1682
Investment Opportunities- in small Hydro projects Construction & Consultancy
Project River District Capacity (MW) 1 Guptkashi Ravanganga Rudraprayag 1.3 2 Asiganga-III Asiganga Uttarkashi 9.0 3 Chamoli Kailganga Chamoli 4.0 4 Pilangad-II Pilangad Uttarkashi 4.0 5 Sonegad Sonegad Uttarkashi 7.5 6 Painagad Painagad Pithoragarh 9.0 7 Suringad-II Suringad Pithoragarh 5.0 8 Tankul Shyamkholigad Pithoragarh 12.0 9 Urgam-II Kalpganga Chamoli 10.0 10 Bhilangana 2A Bhilangana Tehri 24.0 11 Bhilangana 2B Bhilangana Tehri 21.0 12 Bhilangana 2C Bhilangana Tehri 21.0 Total 127.8
Investment Opportunities- Renovation Modernization & Upgradation
S. No. Name of projects Total Capacity (MW) Investment (Million US $ / Rs. Crores) Additional Energy Benefits GWh (MU) 1 DHAKRANI 33.75 117 23 2 DHALIPUR 51 117 36 3 KHODRI 120 170 38 4 CHIBRO 240 185 77 5 TILOTH 90 127 38 6 RAMGANGA 198 351 167 7 CHILLA 144 300 390 Total 906 1367 769
Loss of Connectivity, Roads, Bridges, Building, Water, Power suppy….
Energy Department, Government of Uttarakhand
Energy Department, Government of Uttarakhand
(1 five star, 1 four star, 8 three star)
e.g. hygiene, staff, basic amenities, trained staff, house keeping..
Pilgrimage Spiritual Tourism Eco-Tourism Wild Life Mountaineering Skiing Adventure Water Sports Health and Wellness Leisure Tourism Cultural Tourism Heritage Tourism Rural Tourism
Environment 6 National Parks, 6 Wild Life Reserves & 1 Biosphere Reserve Nature and Beauty Peaks, rivers, waterfalls, rapids, glaciers, etc.. Highest religious shrines and Dhaams 100 + Popular Trekking routes and circuits 83 Scalable Peaks Ski Slopes and Alpine Meadows Lakes and Reservoirs Peace loving community (Best law and order)
Jolly Grant Airport, Dehradun – Daily Flights from Delhi, Lucknow and Mumbai Pantnagar, Chinayalisaur & Gauchar Air Strips Operational Naini Saini Airport, Pithoragarh – Under enhancement 29 Heliports under construction (50 helpads and ports)
Energy Department, Government of Uttarakhand
100 crores
Development Authority
Energy Department, Government of Uttarakhand
Hotels
Apartments
Housing
Centres
Marinas
Centres
Academy
Sports
Sports
Work & Live Leisure
Centres
Institutes
Industries
Culture
Institutes and R&D Centres
Adventure & Sports
Development at Tehri has been initiated
A. Hathi Paon – George Everest Estate – 171 Acres, Dist. Dehradun
54 Acres, Dist. Dehradun C. Abbott Mount (Dist - Champawat) 60 Acres, D. Tehri Lake 100 Acres ++ E. Dayara Bugyal (Dist. Uttarkashi) 100 Acres ++.
29
1. Environment Friendly (minimal disturbance to forest / wildlife) 2. Fast and convenient mode of travel (environment monitoring can be done more frequently) 3. Time - tested established Technologies available 4. Limiting human intervention at terminal points thereby contributing to the environment 5. Fast & easy evacuation in the event of uncertainties
SPV Environment Clearance Forest Clearance / Lease Wildlife Clearance
Procurement State Govt. Approvals
Uttarakhand Infrastructure Project Company (UIPC) – A Joint Venture
between Govt. of Uttarakhand and IL&FS
Mandated to develop infrastructure projects on PPP format.
Preliminary Traffic Survey / Conceptualisation Topographic Survey / Geotech investigations Ropeway Alignment / Design & Costing Clearances & Approvals Marketing / Bid Process Management
Project Identification
Award to PPP Player
attractive proposition for private investor
Aerial Passenger ropeway of about 3.8 kms from Janki-chatti to Yamunotri Temple (Uttarkashi) Project awarded on PPP - based on imported Technology Estimated Completion Time: 3 years Project Cost: Rs. 75 crores
Aerial Passenger ropeway system of about 900 meters from Jwala Temple to Purnagiri Temple (Champawat) Project awarded on PPP - based on imported Technology Estimated Completion Time: 2 years Project Cost: Rs. 35 crores
Project awarded on PPP - based on imported Technology Estimated Completion Time: 1.5 years
LTP – near pony stand UTP – adjacent to Temple 500 m - length Aerial Passenger ropeway system of about 500 at Surkundadevi Temple (Tehri)
Project Cost:
The alignment is proposed in 2 Parts: Part 1: Ghangharia to Hemkund Sahib - 2000 m Part 2: Govindghat to Ghangharia (3 Sections) - 11,350 m
(3400 m)
near Ghangharia (2150 m) Tentative Length of Alignment: ~ 13 kms Tentative Capacity: 1000-500 PPH
Aerial Passenger ropeway system of 13 kms from Govindghat to Hemkund Sahib (Chamoli)
Total Project Cost: Rs. 300 crores
39
4179 m 3175 m
Purkul, Dehradun Altitude: 923.2 m Area: 42.75 acres Lambidhar Altitude: 1719.16 m Area: 8.6 acres Hathipaon Altitude: 1995.27 m Area: 30.93 acres Radha House Altitude: 2083.81 m Mussoorie Altitude: 1992.57 m Area: 4.25 acres
Section I Section II Total Project Cost:
Length of the Ropeway –
4.225 kilometers
Time of travel –
13 min (one way)
The ropeway has been
designed for 500 PPHD
The proposed technology is
Bi-cable Gondola (Jig Back) System
Ease of boarding and de-
boarding
Can run at reasonable speed of
8.5-10 m/s
Project Site ACCESSIBLITY (Bhatwari)
30 kms
50 kms
65 kms
ehri 125 kms
180 kms
220 kms
DAYARA RAITHAL UTP
PROPOSED LINK
BHATWARI LTP BARSU MATHAINA BARNALA
Mathaina:
Main Ski Resort Development / Time Share Cottages/ LTP
Barsu:
Parking for vehicles Rest rooms/ Utility services
Selected Project Alignment
Dayara – Barnala – Mathaina Since Methana has an accessibility issue as it is connected to Barsu by a one km trek.
from Barsu village to Mathaina Mathaina - Barsu
Mathaina, a ropeway from Barsu was finalised
park the vehicles at Barsu, to Mathaina
back up access facility
Gaurikund Linchauli Kedarnath Temple
One of the most ambitious project