An Example for An Example for An Example for An Example for An - - PowerPoint PPT Presentation

an example for an example for an example for an example
SMART_READER_LITE
LIVE PREVIEW

An Example for An Example for An Example for An Example for An - - PowerPoint PPT Presentation

EUROPEAN AIR TRANSPORT COMMAND EUROPEAN AIR TRANSPORT COMMAND EUROPEAN AIR TRANSPORT COMMAND EUROPEAN AIR TRANSPORT COMMAND Integrated Innovative Efficient An Example for An Example for An Example


slide-1
SLIDE 1

20 October 2011

EUROPEAN AIR TRANSPORT COMMAND EUROPEAN AIR TRANSPORT COMMAND EUROPEAN AIR TRANSPORT COMMAND EUROPEAN AIR TRANSPORT COMMAND

Integrated ♦ Innovative ♦ Efficient

UNCLASSIFIED

An Example for An Example for An Example for An Example for An Example for An Example for An Example for An Example for Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing

EURODEFENSE EURODEFENSE ( ( RHID RHID

GBA Rouceau

COS/DCOM EATC COS/DCOM EATC COS/DCOM EATC COS/DCOM EATC

slide-2
SLIDE 2

UNCLASSIFIED 2

20 October 2011

EATC Concept and Approach EATC Concept and Approach EATC Concept and Approach EATC Concept and Approach

  • Gradually transfer and integrate

Gradually transfer and integrate Gradually transfer and integrate Gradually transfer and integrate Gradually transfer and integrate Gradually transfer and integrate Gradually transfer and integrate Gradually transfer and integrate within a single multinational command within a single multinational command national responsibilities national responsibilities national responsibilities national responsibilities national responsibilities national responsibilities national responsibilities national responsibilities which direct the force generation and the which direct the force generation and the mission execution of the combined A T capabilities. [EATC concep mission execution of the combined A T capabilities. [EATC concept] t]

  • Pooling AT capability

Pooling AT capability Pooling AT capability Pooling AT capability Pooling AT capability Pooling AT capability Pooling AT capability Pooling AT capability with conditioned relinquishment of sovereignty with conditioned relinquishment of sovereignty Operational pillar Operational pillar Operational pillar Operational pillar Operational pillar Operational pillar Operational pillar Operational pillar

Assured availability of assigned assets Assured availability of assigned assets Assured availability of assigned assets Assured availability of assigned assets Assured availability of assigned assets Assured availability of assigned assets Assured availability of assigned assets Assured availability of assigned assets

  • OPCON of assigned assets

OPCON of assigned assets

  • Revoke

Revoke ToA ToA procedure procedure

  • Red card holders

Red card holders

  • National chain of command

National chain of command

Functional pillar Functional pillar Functional pillar Functional pillar Functional pillar Functional pillar Functional pillar Functional pillar

Nationally defined levels of EATC authority Nationally defined levels of EATC authority Nationally defined levels of EATC authority Nationally defined levels of EATC authority Nationally defined levels of EATC authority Nationally defined levels of EATC authority Nationally defined levels of EATC authority Nationally defined levels of EATC authority

  • 3 different levels of authority for

3 different levels of authority for functional domains, areas and functional domains, areas and sub sub( (areas areas

slide-3
SLIDE 3

UNCLASSIFIED 3

20 October 2011

The EATC Architecture The EATC Architecture The EATC Architecture The EATC Architecture

  • !"

#

slide-4
SLIDE 4

UNCLASSIFIED 4

20 October 2011

Transfer of Authority* over functional tasks Transfer of Authority* over functional tasks Transfer of Authority* over functional tasks Transfer of Authority* over functional tasks Transfer of Authority* over functional tasks Transfer of Authority* over functional tasks Transfer of Authority* over functional tasks Transfer of Authority* over functional tasks

  • Harmonisation of force employment, training and logistical suppo

Harmonisation of force employment, training and logistical support rt

  • Development of policies and common standards related to AT emplo

Development of policies and common standards related to AT employment yment

  • EATC as the central point for air transport interoperability and

EATC as the central point for air transport interoperability and standardisation standardisation

  • Long

Long( (term benefits (i.e. reduction of logistical footprint) term benefits (i.e. reduction of logistical footprint)

  • Functional Pillar

Functional Pillar Functional Pillar Functional Pillar

slide-5
SLIDE 5

UNCLASSIFIED 5

20 October 2011

Transfer of OPCON Transfer of OPCON Transfer of OPCON Transfer of OPCON Transfer of OPCON Transfer of OPCON Transfer of OPCON Transfer of OPCON Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing Pooling & Sharing air transport assets and air transport assets and unity of purpose / effort unity of purpose / effort unity of purpose / effort unity of purpose / effort unity of purpose / effort unity of purpose / effort unity of purpose / effort unity of purpose / effort: : Efficient and effective use Efficient and effective use

  • f available and most suitable assets
  • f available and most suitable assets
  • Less outsourcing

Less outsourcing

  • Less empty space

Less empty space

  • Additional training opportunities

Additional training opportunities

Operational Pillar Operational Pillar Operational Pillar Operational Pillar

slide-6
SLIDE 6

UNCLASSIFIED 6

20 October 2011

  • $ %
  • &

National AT Structure and EATC National AT Structure and EATC National AT Structure and EATC National AT Structure and EATC

  • '

(

  • &()

* * +, * +, * +,

slide-7
SLIDE 7

UNCLASSIFIED 7

20 October 2011 as of: 13 SEP 2011 BEL A330 1 Falcon 900/20 3 C-130 10 1 ERJ 145/135 4 NLD KDC-10 2 G-4 1 C-130 2 F-50 2 FRA A340 1 1 KC-135 14 A310 2 1 A330 1 C-130 8 6 Falcon 6 C-160 28 20 CN-235 11 8 DEU A310 4 1 A340 2 C-160 43 1 A310 VIP 2 C-160 ESS 16 8 A319 2 CL-601 4 Total 131 47 Ready to Task 60 ToA RToA Non ToA

Assigned Aircraft Assigned Aircraft Assigned Aircraft Assigned Aircraft

slide-8
SLIDE 8

UNCLASSIFIED 8

20 October 2011

  • !"

!" !" !"

  • #$

$ $ $ #% % % %& & & & #'() '() '() '()

  • #

# # #

*)% *)% *)% *)%#

# # #

+,-. +,-. +,-. +,-. #

# # #

#% % % % . . . . #$ $ $ $ #

  • !"
!" !" !"
  • $

$ $ $

  • +/

+/ +/ +/ +/ +/ +/ +/ 01 1 1 1 1 1 1 1 , , , , , , , ,1 1 1 1 1 1 1 1 $$ $$ $$ $$ $$ $$ $$ $$ **,) **,) **,) **,) **,) **,) **,) **,)

Operational Process Operational Process Operational Process Operational Process

slide-9
SLIDE 9

UNCLASSIFIED 9

20 October 2011

EATC & Unified Protector Support EATC & Unified Protector Support EATC & Unified Protector Support EATC & Unified Protector Support

Common determination to :

  • concentrate efforts (HUB)
  • optimize assets

Souda Araxos Istres Solenzara Decimomannu Sigonella FR

MIR

BE F16 FR

Rafale

NLD F16

slide-10
SLIDE 10

UNCLASSIFIED 10

20 October 2011

CINEMATIQUES

EATC Flights to Afghanistan/ ISAF support EATC Flights to Afghanistan/ ISAF support EATC Flights to Afghanistan/ ISAF support EATC Flights to Afghanistan/ ISAF support

Kandahar Kabul Bagram Masar e Sharif Termez Dushambe

slide-11
SLIDE 11

UNCLASSIFIED 11

20 October 2011

  • Initial Operational Capability (IOC) 11 May 2011

Initial Operational Capability (IOC) 11 May 2011

  • Common procurement: Military Planning Tool

Common procurement: Military Planning Tool

  • Common Diplomatic Clearance

Common Diplomatic Clearance

  • EATC Logistic Studies Plan 2011

EATC Logistic Studies Plan 2011

  • Commander

Commander’ ’s Conference and Long Term Planning Conference s Conference and Long Term Planning Conference

Accomplishments 1/2 Accomplishments 1/2 Accomplishments 1/2 Accomplishments 1/2

slide-12
SLIDE 12

UNCLASSIFIED 12

20 October 2011

Exchange of flying hours: Exchange of flying hours: Increase of cross Increase of cross( (national transport national transport

Accomplishments 2/2 Accomplishments 2/2 Accomplishments 2/2 Accomplishments 2/2

500 1000 1500 2000 2500 Jan- 11 Feb- 11 Mar- 11 Apr- 11 May- 11 Jun- 11 Jul-11 Aug- 11 Sep- 11 Oct- 11 Nov- 11 Dec- 11

  • ./.
slide-13
SLIDE 13

UNCLASSIFIED 13

20 October 2011

Total Flying Hours Total Flying Hours Total Flying Hours Total Flying Hours Harmattan Harmattan Harmattan Harmattan

Total Flying Hours Harmattan BEL; 3,22% DEU; 11,83% FRA; 83,70% NLD; 1,24%

slide-14
SLIDE 14

UNCLASSIFIED 14

20 October 2011

Challenges Challenges Challenges Challenges

# # 02. 02. # # 03 3

  • #

# +$)*(. +$)*(. # # +($* +($* # # $$ $$ # # .). .).

slide-15
SLIDE 15

UNCLASSIFIED 15

20 October 2011

  • 2012 FOC (est.)

2012 FOC (est.)

  • 2013 Treaty

2013 Treaty

  • Enlargement

Enlargement

  • 2013/2014 permanent infrastructure

2013/2014 permanent infrastructure

  • Social aspects

Social aspects (integration, schooling

(integration, schooling… …) )

Way ahead Way ahead Way ahead Way ahead