agrichemical facilities
play

AGRICHEMICAL FACILITIES Diane Reinhardt Celebrating 40 years of - PowerPoint PPT Presentation

Celebrating 40 years of taking care of Missouris natural resources. DESIGN REQUIREMENTS FOR AGRICHEMICAL FACILITIES Diane Reinhardt Celebrating 40 years of taking care of Missouris natural resources. Primary changes to rule


  1. Celebrating 40 years of taking care of Missouri’s natural resources. DESIGN REQUIREMENTS FOR AGRICHEMICAL FACILITIES Diane Reinhardt

  2. Celebrating 40 years of taking care of Missouri’s natural resources. Primary changes to rule • References to permits removed • Incorporated changes from legislative decisions on permitting contained in HB 28 • Minor changes made to design requirements • Rule name changed • Cross referencing avoided

  3. Celebrating 40 years of taking care of Missouri’s natural resources. Conventions used • Italicized words in brackets are to be deleted • Bolded words are additions

  4. Celebrating 40 years of taking care of Missouri’s natural resources. HB28 Changes As of August 28, 2013: • Only required for the construction an earthen storage structure to hold, convey, contain, store or treat domestic, industrial, or agricultural process wastewater. • All other construction activities at point sources are exempt.

  5. Celebrating 40 years of taking care of Missouri’s natural resources. PURPOSE section • Duplication eliminated • Much of same text appears in General section

  6. Celebrating 40 years of taking care of Missouri’s natural resources. (2) General • A facility need only comply with these rules when they come within the definition of an agrichemical facility. • Any existing agrichemical facility that has a discharge of agrichemicals or process generated wastewater to the environment will be required to take immediate steps to implement the secondary and operational containment requirements contained in this rule. • All facilities will be designed to be no-discharge.

  7. Celebrating 40 years of taking care of Missouri’s natural resources. (4) Deviations • Discharging is a deviation • (4) Deviations. The department may require a construction permit with any deviation from these requirements as addressed in 10 CSR 20-6.010.

  8. Celebrating 40 years of taking care of Missouri’s natural resources. (5) Engineering Report • When needed? • (5)E. Design criteria — Design and sizing of secondary and operational containment structures should be discussed. Process diagrams. A process configuration showing the interconnection of all pumps, piping and storage tanks associated with the operation of the agrichemical facility should be shown.

  9. Celebrating 40 years of taking care of Missouri’s natural resources. Design of containment structures • (6) Primary Containment for Bulk Agrichemicals • (7) Secondary Containment for Bulk Agrichemicals • (8) Operational Containment for Bulk Liquid Pesticides and Bulk Liquid Fertilizers

  10. Celebrating 40 years of taking care of Missouri’s natural resources. • First and final meeting • Submit comments by May 1, 2014 • Rulemaking schedule • Other opportunities to comment • Ag Rules Advisory Group page on the Forum website has been created • http://www.dnr.mo.gov/env/Wpp/cwforum/ index.html

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend