Celebrating 40 years of taking care of Missouris natural resources. DESIGN REQUIREMENTS FOR AGRICHEMICAL FACILITIES Diane Reinhardt Celebrating 40 years of taking care of Missouris natural resources. Primary changes to rule


slide-1
SLIDE 1

Celebrating 40 years of taking care of Missouri’s natural resources.

DESIGN REQUIREMENTS FOR AGRICHEMICAL FACILITIES

Diane Reinhardt

slide-2
SLIDE 2

Celebrating 40 years of taking care of Missouri’s natural resources.

Primary changes to rule

  • References to permits removed
  • Incorporated changes from legislative

decisions on permitting contained in HB 28

  • Minor changes made to design

requirements

  • Rule name changed
  • Cross referencing avoided
slide-3
SLIDE 3

Celebrating 40 years of taking care of Missouri’s natural resources.

Conventions used

  • Italicized words in brackets are to be

deleted

  • Bolded words are additions
slide-4
SLIDE 4

Celebrating 40 years of taking care of Missouri’s natural resources.

HB28 Changes

As of August 28, 2013:

  • Only required for the construction an earthen storage

structure to hold, convey, contain, store or treat domestic, industrial, or agricultural process wastewater.

  • All other construction activities at point sources are

exempt.

slide-5
SLIDE 5

Celebrating 40 years of taking care of Missouri’s natural resources.

PURPOSE section

  • Duplication eliminated
  • Much of same text appears in General

section

slide-6
SLIDE 6

Celebrating 40 years of taking care of Missouri’s natural resources.

  • A facility need only comply with these rules when they

come within the definition of an agrichemical facility.

  • Any existing agrichemical facility that has a discharge of

agrichemicals or process generated wastewater to the environment will be required to take immediate steps to implement the secondary and operational containment requirements contained in this rule.

  • All facilities will be designed to be no-discharge.

(2) General

slide-7
SLIDE 7

Celebrating 40 years of taking care of Missouri’s natural resources.

(4) Deviations

  • Discharging is a deviation
  • (4) Deviations. The department may

require a construction permit with any deviation from these requirements as addressed in 10 CSR 20-6.010.

slide-8
SLIDE 8

Celebrating 40 years of taking care of Missouri’s natural resources.

(5) Engineering Report

  • When needed?
  • (5)E. Design criteria—

Design and sizing of secondary and operational containment structures should be discussed. Process diagrams. A process configuration showing the interconnection of all pumps, piping and storage tanks associated with the operation

  • f the agrichemical facility should be shown.
slide-9
SLIDE 9

Celebrating 40 years of taking care of Missouri’s natural resources.

Design of containment structures

  • (6) Primary Containment for Bulk

Agrichemicals

  • (7) Secondary Containment for Bulk

Agrichemicals

  • (8) Operational Containment for Bulk

Liquid Pesticides and Bulk Liquid Fertilizers

slide-10
SLIDE 10

Celebrating 40 years of taking care of Missouri’s natural resources.

  • First and final meeting
  • Submit comments by May 1, 2014
  • Rulemaking schedule
  • Other opportunities to comment
  • Ag Rules Advisory Group page on the

Forum website has been created

  • http://www.dnr.mo.gov/env/Wpp/cwforum/

index.html