African SgurrEnergy projects

Egypt Solar PV Eritrea Solar PV, transmission Djibouti Solar PV Somaliland Wind-diesel Ethiopia Solar PV, wind, transmission, micro-grid Kenya Wind, solar PV, micro-grid, hybrid Mozambique Solar PV Malawi Hydropower micro-grid, wind South Africa Wind, solar PV Nigeria Solar PV Ghana Solar PV, micro-grid Burkina Faso Solar PV Guinea Solar PV Senegal Solar PV Angola Solar PV

Clients/funders include:

  • World Bank/IFC
  • AFD
  • USAID
  • OPIC
  • Scottish Government
slide-2
SLIDE 2

The Elements of Success

TECHNOLOGIES FINANCE POLICIES

Sustainable Energy Future

slide-3
SLIDE 3

Wind Turbine PV Array Short-term Energy Storage Balancer Load Heat Recovery Electric line H2 piping Heat stream Legend Airport Loads Hydrogen Storage H2 Fueling Electrolyzer Military Loads

Baltra, Santa Cruz, Galapagos Renewable - H2 Energy System

Fuel Cells

  • r Engines

Divergent goals

slide-4
SLIDE 4

Historical LCoE in wind and solar

slide-5
SLIDE 5

Stabilization/storage tools

To maintain dependable power supply:

  • Storage

– Mature: batteries – lead-acid, molten salt – Mature: pumped storage hydro/flywheels – Developing: redox batteries (e.g. VRB, Plurion) – Future: may bring hydrogen

  • Control systems

– Demand management – Generation management – Backup power – Voltage and frequency control.

Power demand Generation

slide-6
SLIDE 6

Appropriate Technology

Rotary Converter – DC AC

slide-7
SLIDE 7

Carriacou Island – Grenada 2014

High penetration static based architecture => project funding cancelled

slide-8
SLIDE 8

Battery storage costs

  • Tesla currently selling power Powerwall at $250/kWh imply an all in

systems cost of no more than $500/kWh.

  • Life time costs translates to LCoE of $0.15/kWh or less.
  • Offtake pricing for Solar PV in India is currently $0.07/kWh.
  • Northern European offtake pricing for solar PV circa $0.09/kWh
  • Base load solar at $0.22/kWh to $0.24/kWh from sun blessed countries

to Northern Europe

slide-9
SLIDE 9

Significant Opportunities

  • Africa
  • Caribbean
  • Islands
  • Smarter grid

Somaliland – February 2015

slide-10
SLIDE 10

Levelised cost of electricity