adani transmission limited equity presentation
play

Adani Transmission Limited Equity Presentation MAY 2020 CONTENTS - PowerPoint PPT Presentation

Adani Transmission Limited Equity Presentation MAY 2020 CONTENTS Investment Strategy, ATL Company Profile Adani Group 09-12 04-07 14-23 Value creation and Outlook ATL: Manifesting Adanis Infrastructure ADANI: World class


  1. Adani Transmission Limited Equity Presentation MAY 2020

  2. CONTENTS Investment Strategy, ATL – Company Profile Adani Group 09-12 04-07 14-23 Value creation and Outlook ATL: Manifesting Adani’s Infrastructure ADANI: World class infrastructure ATL: Key Highlights and Objectives of 14 Excellence in T&D business 09 & utility portfolio 04 Capital Management Program ATL: Reduced Dev. and Capex risk with High ADANI: Repeatable, robust & ATL at a Glance 10 15 Credit Discipline and no Equity Dilution proven model to deliver RoE 05 11 Contracted Assets at a Glance Case Study: Dev., O&M Effic. and Capital ADANI: Repeatable, robust 16 Management to create shareholder value business model applied Integrated Utility at a Glance 12 consistently to drive value 06 AEML (Integrated Utility): Significant De 17 risking through Capital Management ATL: A platform well-positioned To leverage growth opportunities in 18 ATL: Strategic Objectives T&D business 07 Transmission and Distribution businesses 19-20 growth opportunities ATL: Update on Covid-19 21 22-23 ATL: Outlook and Key Focus Areas Regulatory Landscape Global Benchmarking Annexure And ESG and Investment Case 37-46 25-32 33-35 ATL: Emulating Group’s Core Infra ATL: Regulatory Framework 25 Global Benchmarking: Adani Utility Philosophy at every phase 37 Portfolio vs. Global Utility peers 33 Capital Management Program ATL: ESG Performance 27 Demonstrating Global Excellence 38-39 Global Benchmarking: Regulatory 34 Framework ATL: Integrated ESG Framework Credit Rating 40 for enhanced value creation 28 41-42 ATL’s Evolution and Portfolio ATL: Compelling Investment Case 35 ATL: Key ESG Metrics and Sector Outlook: Indian Transmission Initiatives 29 Sector Poised for Significant Growth 43 ATL: Environment awareness Size of Opportunity: Investment of 44 and Initiatives 30 Rs. 8.2 tn/ USD 117 bn expected AEML: Initiatives towards ATL: Inculcating Safety Culture 45 reduction of carbon footprint 31 ATL: Harnessing Innovation and ATL: Governance Journey so far 46 Technology to Drive Excellence 32 and future glide path

  3. Adani Group

  4. Adani TransmissionLimited Investor Presentation | May 2020 Adani : World class infrastructure & utility portfolio Adani Transport & Logistics Portfolio Energy & Utility Portfolio Adani Philosophical shift from B2B 63.3% 100% 75% 75% to B2C businesses – APSEZ SRCPL ATL AGEL AGL – Gas distribution Port & Logistics Rail T&D Renewables network to serve key 100% 75% 37.4% geographies across India AAPT AGL APL AEML – Electricity 75% Abbot Point Gas DisCom IPP distribution network that AEL powers the financial capital of India Incubator Adani Airports – To operate, manage and 100% 100% 100% 100% develop six airports in the country AAHL ATrL AWL Data Airports Roads Water Centre Locked in Growth 2020 – Transport & Logistics - ~USD 21bn* Airports and Roads ( Combined M-cap) Energy & Utility – Water and Data Centre • Orange colour represent public traded listed vertical | Percentages denote promoter holding • * As on April 30, 2020, USD/INR = 75.1 04

  5. Adani TransmissionLimited Investor Presentation | May 2020 Adani : Repeatable, robust & proven model to deliver RoE Development Operations Post Operations Phase Origination Operation Site Development Construction Capital Mgmt Analysis & market Site acquisition Engineering & design Life cycle O&M Redesigning the capital intelligence planning structure of the asset Concessions Sourcing & quality Viability analysis and regulatory levels Asset Management Operational phase Activity agreements plan funding consistent with Strategic value Equity & debt asset life Investment case funding at project development Successfully placed O&M optimisations Redefining the Envisaging evolution Complex seven issuances totalling e.g. Solar plants space e.g. Mundra of sector e.g. Adani developments on ~USD 4Bn in FY20 Port Transmission time & budget e.g. APL All listed entities maintain liquidity cover of 1.2x- 1.8x Performance for FY21 Focus on liquidity planning ensures remaining stress free Low capital cost, time bound & quality completion providing long term stable cashflow & enhanced RoE 05

  6. Adani TransmissionLimited Investor Presentation | May 2020 Adani : Repeatable, robust business model applied consistently to drive value Successfully applied across Infrastructure & utility platform Development at large scale & within time and budget India’s Largest Longest Private HVDC 648 MW Ultra Mega Solar Largest Single Location Commercial Port Line in Asia Power Plant Private Thermal IPP (at Mundra) (Mundra – Dehgam) (at Kamuthi, Tamil Nadu) (at Mundra) Key APSEZ ATL AGEL APL Business Excellence in O&M – Highest Margin Highest availability High Availability Constructed and benchmarked to global Model among Peers in the among Peers Built availability of Commissioned 9 standards EBITDA margin: 91% 1,3 World 89%, 5 Attributes months EBITDA margin: 65% 1,2 EBITDA margin: 90% 1,4 Diverse financing Private Banks 31% sources – only Bonds 31% Indian infrastructure PSU 38% portfolio with four (4) PSU 55% Investment Grade (IG) Private Banks 31% issuers March 2016 September 2019 Bonds 14% Note: 1 Data for FY19; 2 Excludes forex gains/losses; 3 EBITDA = PBT + Depreciation + Net Finance Costs – Other Income; 4 EBITDA 06 Margin represents EBITDA earned from power sales and exclude other items; 5 H1 FY20 Data; Include listed Group companies

  7. Adani TransmissionLimited Investor Presentation | May 2020 ATL : A platform well-positioned to leverage growth opportunities in T&D business Strategic Presence Execution Prowess Healthy pool mix ATL - Present in 9 states with 21 Transmission Network of Transmission (FY20): Development transmission lines 14,739 ckms 1 ; 52% of EBITDA - Central pool AEML - Integrated utility catering Longest Private HVDC Line in Asia 48% of EBITDA - State pool to gateway city of Mumbai Operating Efficiency Consumer-centricity ESG and Strong Margins Robust network availability of Operations Integration of Customer and ~99.8% and supply Operations Embedded ESG Framework for Technology enabling AEML as a reliability of 99.99% enhanced value creation supplier of choice Transmission EBITDA Margin – 92% Distribution EBITDA Margin – 24% ROE optimization via Self-funded growth model Capital Management Efficiency-led Development ensuring efficient capital churn Value Creation Equity Value Development and O&M efficiencies Re-designing capital structure Every Rs. 1 bn of Equity Invested resulted into savings of ~Rs.5 bn Creation though low cost capital and allows creation of Rs. 2.25 bn of optimizing ROE at 55% elongated maturity Equity Employed 07 Note: 1) Transmission network of 14,739 ckt kms include operational, under-construction; 2) FY20 - Availability, Margin and Supply reliability

  8. Company Profile

  9. Adani TransmissionLimited Investor Presentation | May 2020 ATL : Manifesting Adani’s Infrastructure Excellence in T&D business Execution Strength and Pan AEML - One of the best-run 3 million+ Pan-India network & only private 93-year old integrated utility India Presence sector co. to operate 500 KV Retail Electricity Households catering to gateway city of HVDC in S-E Asia Mumbai Predictable and 31 years/ 17 years INR 300 Bn/ US$ 4.3Bn Annuity Returns 54%/ 46% Total Regulated Asset base (1) Avg. Residual Concession Life ROA / TBCB (2) (Transmission/ Distribution) (4,5) (Fully built) Robust Financial performance and 92% (Transmission) ~99.76 % INR 117 bn / US$ 1.7 bn BBB- / Baa3 strong Balance 24% (Distribution) Availability Approved Tariff Order International Investment Sheet EBITDA Margin (Fully Built) (1) Grade Rating (5) (FY20) (FY20) Note: US$/INR: 70; (1) Fully built estimate based on regulatory approved tariff and bid based tariff profile of operational, under-construction and under-acquisition projects of Transmission and Distribution business. This excludes HVDC project. No upsides have been assumed on account of operational efficiencies; (2) Including under-construction and under-acquisition assets on project cost basis and existing assets on book value basis; RTM – Regulated Tariff 09 Mechanism; (3) S&P: BBB- / Fitch: BBB- / Moody’s: Baa3; (4) Average residual concession life for Transmission assets is as of F Y19; (5) Operational History of 93 years; TBCB: Tariff Based Competitive Bidding

  10. Adani TransmissionLimited Investor Presentation | May 2020 ATL at a Glance 100% 1 Contracted Assets Integrated Utility 100% 74.9% 25.1% Qatar Investment Wholesale Consumer Authority (QIA) • 12 Operating TBCB Assets (1) , 9 under construction TBCB Assets ROA Asset ROA Assets • Transmission network of 9,688 (2) ckt kms; Longest Private HVDC Line in Asia 4 Operating Utility catering to Transmission Assets 3 mn+ Connections • Concession Life of 35 years + Remaining Life of Asset Concession Life of 35 1,892 MW of peak years + Remaining power demand Life of Asset Transmission 540 ckm lines/ 3,125 network of 5,051 MVA transformation ckt kms capacity Notes: 1) % denotes shareholding; 74% in Aravalli Transmission Service Company Limited; 2) Network includes operational, under construction as of 31st March, 2020 10

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend