Abhay Kumar Singh, Executive Director, NHPC Limited.
1
Abhay Kumar Singh, Executive Director, NHPC Limited. NHPC Limited. - - PowerPoint PPT Presentation
Abhay Kumar Singh, Executive Director, NHPC Limited. NHPC Limited. 1 2 NHPC PROFILE Year of Establishment 1975 Authorized Share Capital Rs. 150000 million 24 (7071.2 MW) Power Stations in Operation 22 (5551.2 MW) - NHPC 2 (1520 MW) -
1
2
3
Year of Establishment 1975 Authorized Share Capital
Power Stations in Operation 24 (7071.2 MW) 22 (5551.2 MW) - NHPC 2 (1520 MW) - NHDC (JV) Projects under Construction 6 (4934 MW) Power Stations Commissioned on Deposit/Turnkey Basis
5 (89.35 MW) 2 (74.10 MW) 3 (15.25 MW) Projects under Clearance 13 (8211 MW) Projects under Survey and Investigation stage 2 (1079 MW)
7071.2* MW
2810 +2124 (JV) = 4934 MW
8211 MW 1079 MW
POWER STATIONS Hydro-22 (6971.2MW) + Wind-1 (50 MW) + Solar-1 (50 MW) PROJECTS UNDER CONSTRUCTION Hydro - 2 (2800 MW) RE – 1 (10 MW) + Pakal Dul (1000 MW)** Kiru (624 MW)** Teesta VI (500 MW)*** PROJECTS UNDER CLEARANCE Hydro – 11 (8171MW) RE – 2 (40 MW)
PROJECTS UNDER S&I
Hydro – 2
4
❖ 24 POWER STATIONS
– 22
– 01
– 01 ❖ 6 PROJECTS UNDER CONSTRUCTION
– 05
– 01 ❖ PROJECTS UNDER CLEARANCE
– 11
– 02 ❖ 02 PROJECTS UNDER S&I ❖ 05 PROJECTS COMPLETED DEPOSIT/TURNKEY BASIS
5
6
7
8
9
10
11
12
13
14
15
16
Hon’ble Minister of State (I/C) for Power and New & Renewable Energy delivering welcome address on 19th May 2018 on dedication to Nation NHPC’s 330 MW Kishanganga HE Project (J&K)
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Foundation stone laid by Hon’ble PM Shri Narendra Modi on 19th May 2018
36
37
38
39
40
42
43
44
45
46 46
during FY 2016-17 & FY 2017-18. District covered Dhemaji, Lakhimpur, Sonitpur, Majuli & Biswanath
FY 2017-18 (Rs. 5.43 Crore).
Majuli
47
Providing Safe Drinking Water Facilities in Rural Areas - ‘Kalash’
signed for 1620 locations with local bodies/ management committees for implementation of the scheme in rural areas of Dhemaji, Lakhimpur, Biswanath and Majuli districts in the state of Assam.
48
49 49
LPH RO Plant with estimated cost of Rs. 28.5 lakhs each catering to around 300-400 families on daily basis at ten locations.
facility has Sanitation Complex & RO Plant.
No. RO Cum Sanitation Complexes have been completed at different places
Crore has been spent towards this scheme.
❑ Hydro Engineering College at Bilaspur, Himachal Pradesh (H.P.)
College at Bilaspur, Himachal Pradesh during FY 2016-17.
❑ Darjeeling Engineering College, Takdah, Darjeeling, West Bengal
NHPC
has contributed 13 Crore for establishment
Darjeeling Engineering College
Main Building of
Darjeeling Engineering College, Takdah is under construction .
50
adopted by NHPC(J&K-7 nos,Uttarakhand-4 & Arunachal-2).
during 2014-18.
Chandey in Sikkim.
Subansiri Lower District, Arunachal Pradesh. Rs. 9.65 Crore has been spent so far. Currently around 133 students are studying in the School.
51
52 52
Skill Development Initiatives
completed
Industry Development Council) and NSDC (National Skill Development Corporation) with F.I. of Rs. 8.68 Crore
Coverage
Pradesh, Assam, Sikkim, Himachal Pradesh, West Bengal, Jammu & Kashmir and Manipur
Plumber, Electrician, Mason, Site Accountant, Land Surveyor, Trainee Associate, Sewing Machine Operator, Assistant Beauty Therapist, Shaft Handloom Weaver,
52
53 53 53
Name of Training Provider
Candidates Trained
Candidates Placed NSDC 2500 1987 CIDC 1000 703 Total 3500 2690
54
55
56
57