Educational Summit 2 – The Options
January 30, 2018
A VISION FOR THE FUTURE
A V ISION F OR T HE F UTURE Educational Summit 2 The Options - - PowerPoint PPT Presentation
A V ISION F OR T HE F UTURE Educational Summit 2 The Options January 30, 2018 Objectives of Meeting 1. Small group e valua%on of each op%on based upon aspira%onal vision statement 2. Look at the Strengths & Weaknesses of each
Educational Summit 2 – The Options
January 30, 2018
A VISION FOR THE FUTURE
Objectives of Meeting
upon aspira%onal vision statement
improved
as it looks to finalize a decision so the Department can take advantage of first round RIDE funding by submiHng a RIDE 2 by February, 2019
SC
2/1/19 Preparation of Stage 2 Submission to RIDESC
12/1/18SC
7/1/18PossibleTimeline
Today SC
1/30/18 3/15/18 Meet with RIDE; Develop Scope for each school. Hold Ed Spec Meetings. Develop Ed Spec. Iterative Design; Stage 1 RIDE LOI & Approval; Final Design & Scope.C
8/1/20Vote
11/19? Final work on Design & Construction Documents; Bid Packages and Award.SC
9/21 ConstructionC
BRMS Addition Opens/Grade(s) Move InJacob’sStudy FacilityNeedsAssessment
The Options
All Options:
Elementary Schools
High School
safer traffic flow
A
Elementary 2 K-5, 2 PK-5 Broad Rock 6-8 TOTAL: $68.35M STATE AID: 35% NET LOCAL COST: $42.2M $670,000B
Elementary 1 K-5, 2 PK-5 Broad Rock 6-8 TOTAL: $78.95M STATE AID: 35-40% NET LOCAL COST: $43.27M-$52.2M $1.66MC
Elementary 1 K-4, 2 PK-4 Broad Rock 5-8 TOTAL: $78.54M STATE AID: 35-40% NET LOCAL COST: $43M-$46.9M $1.62MD
Elementary 2 K-4 Broad Rock 5-8 TOTAL: $78.89M STATE AID: 35-55% NET LOCAL COST: $28.2M-$44M $3.15MGroupReports
GroupActivities
GroupActivities
THANK YOU!