3547-3538 N. Figueroa Street Los Angeles, CA 90065 Greater Cypress - - PowerPoint PPT Presentation

3547 3538 n
SMART_READER_LITE
LIVE PREVIEW

3547-3538 N. Figueroa Street Los Angeles, CA 90065 Greater Cypress - - PowerPoint PPT Presentation

3547-3538 N. Figueroa Street Los Angeles, CA 90065 Greater Cypress Park Neighborhood Council PLUE Meeting July 30, 2019 DIR-2019-1321-TOC-CDO ENV-2019-1322-EAF Project Site Lot Area 47,211 SF 1.08 acres (approx.) Metro Gold Line


slide-1
SLIDE 1

3547-3538 N. Figueroa Street

Los Angeles, CA 90065

Greater Cypress Park Neighborhood Council PLUE Meeting July 30, 2019 DIR-2019-1321-TOC-CDO ENV-2019-1322-EAF

slide-2
SLIDE 2

Project Site

Lot Area

47,211 SF 1.08 acres (approx.)

Metro Gold Line Heritage Square Station

slide-3
SLIDE 3

Existing Conditions (Project Site)

slide-4
SLIDE 4

Existing Conditions (to North of Site)

slide-5
SLIDE 5

Site Context

Metro Gold Line Heritage Square Station

NELA Plaza

100 Units, 14,000 SF retail (proposed)

Parkview Terrace

30 Units

La Montana Apartments

112 Units

3405 N Figueroa Apartments

36 Units

Marmion Way Apartments

49 Units

Corner Fig Apartments

30 Units

slide-6
SLIDE 6

Example LOHA Project 1037 N. Kings Road

slide-7
SLIDE 7

Example LOHA Project 7917 Willoughby

slide-8
SLIDE 8

Example LOHA Project 749 Cloverdale

slide-9
SLIDE 9

Project Data

Allowed per TOC / Required per Code Provided Density 55 units (49 market rate, 6 extremely low

income)

55 Units (49 market rate, 6

extremely low income)

  • 52 two-bedroom units
  • 3 three-bedroom units

Floor Area 177,042 SF 66,997 SF

  • 7,379 SF Retail
  • 59,618 SF Residential

FAR 3.75:1 1.42:1 Height/Stories 67’ / 5 Stories 61’ / 5 Stories Auto Parking 39 Spaces

  • 28 residential spaces
  • 11 commercial spaces

96 Spaces

  • 71 residential spaces
  • 25 commercial spaces

Bicycle Parking 9 Short Term, 49 Long Term 9 Short Term, 49 Long Term Open Space 6,875 SF 1,340 SF of publicly accessible open space 14,704 SF 2,701 SF of publicly accessible open space On-Site Trees 14 14

slide-10
SLIDE 10

City Entitlements/Review Needed

  • Transit Oriented Communities (TOC) Guidelines Base and Additional

Incentives – Tier 3

  • Base incentives: 70% increase in allowable density, 14% decrease in residential parking

requirement

  • Additional incentives: 22-foot / 2 story height increase
  • Cypress Park & Glassell Park Community Design Overlay Plan Approval
  • Environmental Clearance
  • Class 32 Categorical Exemption for Urban Infill Projects
  • No significant environmental impacts as a result of the project
  • Traffic
  • Air Quality
  • Noise
slide-11
SLIDE 11

Cypress Park & Glassell Park CDO Highlights

  • Goal – to promote design for commercial projects which invite pedestrian interest

and activity and communicate a sense of permanence to the area

  • Design principles – activity, pedestrian scale, transparency, individuality,

contribution, simplicity

  • Guideline 4, Standard 4a – 2,701 square-foot publicly accessible open space

fronting on Figueroa Street

  • Guideline 6, Standards 6a to 6c – plane break every 20 feet horizontal length and

every 15 feet vertical length, variation in roofline, structural bays every 20 feet for storefronts

slide-12
SLIDE 12

Project Timeline

  • April 2018 – Feasibility analysis and design process begins
  • June 2018 – Applicant acquired property
  • March 2019 – Entitlement applications submitted to the

Department of City Planning

  • May 2019 – Greater Cypress Park Neighborhood Council

Planning and Land Use Committee (PLUE) meeting presentation

  • June 2019 – Community Meeting
  • July 2019 – Second PLUE meeting presentation
slide-13
SLIDE 13

First Floor Plan

slide-14
SLIDE 14

Second Floor Plan

slide-15
SLIDE 15

Third Floor Plan

slide-16
SLIDE 16

Fourth Floor Plan

slide-17
SLIDE 17

Fifth Floor Plan

slide-18
SLIDE 18

Section – Along Figueroa

slide-19
SLIDE 19

Section – North/South

slide-20
SLIDE 20

Section – North/South

slide-21
SLIDE 21

Elevation – Rear

slide-22
SLIDE 22

Landscape Plan – Level 1

slide-23
SLIDE 23

Landscape Plan – Level 2

slide-24
SLIDE 24

Landscape Plan – Level 4

slide-25
SLIDE 25

Landscape Plan – Level 5

slide-26
SLIDE 26

Public Plaza and Retail

slide-27
SLIDE 27

Additional Rendering

slide-28
SLIDE 28

Additional Rendering

slide-29
SLIDE 29

Allowable Building Envelope Allowed Maximum Floor Area: 177,042 SF

slide-30
SLIDE 30

Proposed Building Envelope Proposed Floor Area: 66,997 SF

slide-31
SLIDE 31

Community Outreach – What We Heard

  • Adequate on-site parking for tenants and guests
  • Parking for construction workers that does not result in parking on

residential streets

  • Traffic impact on Figueroa
  • Environmental Analyses
  • Massing and scale of the project / Change of community character
  • View / privacy impacts for northerly adjacent neighbors
  • Lack of public / community benefits
  • Pedestrian safety during construction
  • Geo stability of the hillside during construction
  • Pedestrian safety and connection to Gold Line
slide-32
SLIDE 32

Community Outreach – Responses

  • The project is providing more parking than required for the retail component of the

project and is not maxing out the TOC Tier 3 parking reduction allowed. Retail parking will be available for residential guests in the evening.

  • We will ensure that construction workers not park on residential streets.
  • Traffic study approved by LADOT shows that there will be no significant traffic impacts

as a result of the project, including AM and PM peak periods.

  • The Categorical Exemption technical studies and findings are in draft form and will be

shared with the public once reviewed by the Department of City Planning.

  • Project has been designed to comply with the Glassell Park / Cypress Park CDO and is

below allowable FAR.

slide-33
SLIDE 33

Community Outreach – Responses

  • Thoughtful design of project intended to preserve view corridors to the extent possible.

Setbacks and landscaping have been incorporated to minimize impacts.

  • A Construction Mitigation Plan will be reviewed and approved by LADBS which will

include pedestrian safety measures during construction.

  • Temporary shoring will be utilized during construction that will be replaced by

permanent retaining walls. All of this requires sign off and approval from LADBS.

  • The project team is working with Council District 1 and LADOT to identify ways that the

project can contribute to planned pedestrian safety and connectivity improvements for the area.

slide-34
SLIDE 34

Potential Community Benefits

  • City of Los Angeles Department of Transportation – Vision Zero Program – Several Proposed Traffic and

Safety Improvements along the North Figueroa Corridor

  • Approved Signalized Traffic Light and Pedestrian Crossing at Intersection of Avenue 37 and Figueroa

Street

  • Proposed financial contribution to this signalized traffic light and pedestrian crossing

Metro Gold Line Heritage Square Station Approved Signalized Traffic Light

slide-35
SLIDE 35

Questions?

THANK YOU!