3.4 QA/QC for the EHVDC cable systems
Technologies for Global Energy Grid
- Dr. Roland D. Zhang
27.06.2019
3.4 QA/QC for the EHVDC cable systems Technologies for Global - - PowerPoint PPT Presentation
3.4 QA/QC for the EHVDC cable systems Technologies for Global Energy Grid 27.06.2019 Dr. Roland D. Zhang Topics Introduction Why QA/QC important for EHVDC cable systems? What could we do for QA/QC? Discussion 2
27.06.2019
2
Insulation: MI (PPLP), Extruded Application: Submarine/underground etc.
27/6/2019 TGEG'19 Workshop 3
Source: ABB/nkt, Nexans
27/6/2019 TGEG'19 Workshop 4
very limited operation experience,
route length of 700 km EHVDC cables
manufacturers regarding QA/QC, Win-Win-situation, possibly setting the benchmarks in this area
availability of EHVDC cable systems
particularly avoiding the man-made failure, e.g. joint installation
27/6/2019 TGEG'19 Workshop 5
failure/serial failure
to the outage
Readiness Level) of new technology
27/6/2019 TGEG'19 Workshop 6
TT
etc.
QA/QC
27/6/2019 TGEG'19 Workshop 7
27/6/2019 TGEG'19 Workshop 8
shall be initialised and involved as early as possible by TSOs and by cable manufacturers, “Thinking end at the beginning”
risk/cost/performance of EHVDC cable system
9 27/6/2019 TGEG'19 Workshop