3.4 QA/QC for the EHVDC cable systems Technologies for Global Energy Grid 27.06.2019 Dr. Roland D. Zhang Topics Introduction Why QA/QC important for EHVDC cable systems? What could we do for QA/QC? Discussion 2


  1. 3.4 QA/QC for the EHVDC cable systems Technologies for Global Energy Grid 27.06.2019 Dr. Roland D. Zhang

  2. Topics • Introduction • Why QA/QC important for EHVDC cable systems? • What could we do for QA/QC? • Discussion 2

  3. Introduction Insulation: MI (PPLP), Extruded Application: Submarine/underground etc. Source: ABB/nkt, Nexans 27/6/2019 TGEG'19 Workshop 3

  4. Why QA/QC important (1) - Minimizing risks by the application of new technology without or with very limited operation experience, esp. for the “pilot project” with a route length of 700 km EHVDC cables - Building the long-term partnership btw. TSOs and all EHVDC cable manufacturers regarding QA/QC, Win-Win-situation, possibly setting the benchmarks in this area - Enhancing the reliability and availability of EHVDC cable systems - Decreasing the failure rate, particularly avoiding the man-made failure, e.g. joint installation 27/6/2019 TGEG'19 Workshop 4

  5. Why QA/QC important (2) - Avoiding the systematic failure/serial failure - Reducing the re-dispatch cost due to the outage - Saving the reputation - Increasing TRL (Technical Readiness Level) of new technology - Accelerating the energy transition 27/6/2019 TGEG'19 Workshop 5

  6. What to Do for QA/QC (1) Design and Development: • Verification of pre-performed tests, i.e. development tests, PQ/EQ, o TT Identification of new PQ, TT or EQ etc. o Control of ITP, Manufacturing Control Plan, QC-Plan, interface plan o etc. FMECA and risk assessment of design, installation, testing etc. o Sub-suppliers’ qualification and verification o Manufacturing and Production • Factory audit, checking the attitude of production (floor) staff to o QA/QC Material incoming check/control, traceability o Production supervision and witness of tests o Dealing with NC, Incident, RCA etc. o 27/6/2019 TGEG'19 Workshop 6

  7. What to Do for QA/QC (2) Installation • supervision of cable laying/installation incl. trial installation o Supervision of jointing process, assembly the termination o HSE, SOLAS o Commissioning: • SAT, Finger print measurements o Trial operation o Monitoring systems calibration and application o Operation: • Maintenance plan incl. RPP and SLA o Health Index/Condition monitoring o Decommissioning plan o 27/6/2019 TGEG'19 Workshop 7

  8. Discussion • Generally, QA/QC for EHVDC cables shall be initialised and involved as early as possible by TSOs and by cable manufacturers, “ Thinking end at the beginning” • QA/QC → Balance of risk/cost/performance of EHVDC cable system • Cooperation/Knowledge sharing 27/6/2019 TGEG'19 Workshop 8

  9. Thank you very much for your attention! 27/6/2019 TGEG'19 Workshop 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.