2019-2021 DRAFT PLAN CONSULTANT REVIEW May 16, 2018 1 OUTLINE - PowerPoint PPT Presentation

2019-2021 DRAFT PLAN CONSULTANT REVIEW May 16, 2018 1 OUTLINE High level observations and plan portfolio summary 1. Electric program savings and costs 2. Gas program savings and costs 3. C&I plan summary and key considerations 4.


  1. 2019-2021 DRAFT PLAN CONSULTANT REVIEW ► May 16, 2018 1

  2. OUTLINE High level observations and plan portfolio summary 1. Electric program savings and costs 2. Gas program savings and costs 3. C&I plan summary and key considerations 4. Residential and low income plan summary and key 5. considerations Cross cutting key issues to address 6. Conclusions and next steps 7. www.ma-eeac.org 2019-2021 Draft Plan Consultant Review 2

  3. HIGH LEVEL OBSERVATIONS ► Plan is well written but lacks the detail needed to respond to many EEAC recommendations ► Benefits are $1.6 billion lower than current plan ► Savings are lower than current plan while costs to achieve are higher than expected ► No large apparent change in program measure mix or delivery ► Active demand management included but limited energy storage ► Wide variation in planning assumptions among PAs indicates additional coordination across PAs would be useful ► Need to retain kWh and therm metrics in addition to MMBtu in order to track primary fuel impacts ► “Place holder” performance incentive is same as current plan ► There is a lot to do to get a final plan together www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 3

  4. 2019-2021 PLAN PORTFOLIO SUMMARY 2017 2019 2020 2021 2019-2021 (Preliminary) Lifetime Savings (MWh) 14,163,025 9,806,017 9,669,240 9,482,442 28,957,699 Electric Lifetime Savings (MMBtu) 37,369,737 34,609,995 34,053,736 34,227,358 102,891,089 Annual Savings (MWh) 1,574,249 1,005,330 978,631 955,022 2,938,982 % of Annual Sales* 3.4% 2.2% 2.1% 2.0% 2.1% Summer Capacity Savings w/ ADM (kW) 228,530 180,711 208,371 242,295 631,377 Benefits ($ millions) $2,117 $1,547 $1,552 $1,558 $4,656 Expenditures ($ millions) $529 $546 $546 $546 $1,638 Lifetime $/kWh $0.037 $0.056 $0.056 $0.058 $0.057 2017 2019 2020 2021 2019-2021 (Preliminary) 368,345,795 342,404,319 343,333,276 339,424,887 1,025,162,483 Lifetime Savings (Therms) Gas Annual Savings (Therms) 26,621,107 26,654,591 26,810,531 26,682,210 80,147,332 1.1% % of Annual Sales* 1.2% 1.1% 1.1% 1.1% Benefits ($ millions) $572 $534 $534 $529 $1,597 $691 Expenditures ($ millions) $205 $227 $230 $234 Lifetime $/therm $0.557 $0.662 $0.670 $0.691 $0.674 *Years 2019-2021 use 2018 as sales reference www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 4

  5. PORTFOLIO BENEFITS ARE LOWER THAN RECENT YEARS Electric and Gas Benefits $3,000 $2,500 $2,000 Evaluated-Electric Benefits ($ Millions) Planned-Electric Represents a 27% drop Q4 2017-Electric $1,500 Evaluated-Gas Planned-Gas $1,000 Q4 2017-Gas $500 $- 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 5

  6. PA PLAN ANNUAL SAVINGS AS A % OF SALES ARE LOWER THAN CONSULTANT ASSESSMENT OF POTENTIAL Consultant Team Assessment of Potential PA Draft Plan Res C&I Res C&I Electric Electric Electric Electric 2.01% 2.19% 2.62% 3.52% Res Gas C&I Gas Res Gas C&I Gas 1.29% 0.88% 2.20% 1.14% Electric: 3.15% Electric: 2.1% Gas: 1.65% Gas: 1.1% Note: 2018 used as sales reference for PA Plan www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 6

  7. ELECTRIC www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 7

  8. PLANNED LIFETIME ELECTRIC SAVINGS ARE LOWEST SINCE 2010 Portfolio Lifetime Electric Savings 20,000,000 18,000,000 16,000,000 14,000,000 12,000,000 Evaluated MWh 10,000,000 Planned 8,000,000 Q4 2017 6,000,000 4,000,000 2,000,000 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 8

  9. ANNUAL ELECTRIC SAVINGS LOWER THAN RECENT YEARS AND LOWER THAN CONSULTANT ASSESSMENT OF POTENTIAL Portfolio Annual Electric Savings 1,800,000 1,600,000 1,400,000 1,200,000 Evaluated-Portfolio 1,000,000 MWh Planned-Portfolio 800,000 Q4 2017-Portfolio Consultant Assessment of Potential 600,000 400,000 200,000 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 9

  10. LIFETIME ELECTRIC SAVINGS LOWER THAN PREVIOUS PLAN FOR ALL SECTORS; BIGGEST DROP FOR RESIDENTIAL Lifetime Electric Savings by Sector 14,000,000 12,000,000 Evaluated-C&I 10,000,000 Planned-C&I Q4 2017-C&I 8,000,000 Evaluated-Residential MWh Planned-Residential 6,000,000 Q4 2017-Residential Evaluated-Low-Income 4,000,000 Planned-Low-Income Q4 2017-Low-Income 2,000,000 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 10

  11. 2019-2021 NET MMBTU SAVINGS ARE SUM OF THREE COMPONENTS 2019-2021 Electric Program Net MMBtu 140,000,000 120,000,000 100,000,000 80,000,000 MMBtu 60,000,000 40,000,000 20,000,000 0 Electric Savings Fossil Fuel Savings Fossil Fuel Increased Net Total Usage www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 11

  12. PLANNED MMBTU SAVINGS ARE LOW; OTHER FUEL IMPACTS ON NET ELECTRIC PROGRAM SAVINGS VARY Electric Program Lifetime Savings (MMBtu) 70,000,000 60,000,000 50,000,000 Planned 40,000,000 30,000,000 20,000,000 10,000,000 - 2013 2014 2015 2016 2017 2018 2019 2020 2021 Electric Only Other Fuels www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 12

  13. PASSIVE DEMAND SAVINGS LOWER THAN TRENDS; PROPOSED ACTIVE DEMAND MANAGEMENT LOWER THAN POTENTIAL Statewide Summer Capacity Savings 500 450 400 350 300 MW 250 200 150 100 50 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Planned Active Demand Planned Passive Demand Actual Passive Demand Planned Passive + Active Demand PA Potential Study ADM Extrapolation (No Storage) PA Potential Study ADM Extrapolation (With Storage) www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 13

  14. PASSIVE DEMAND SAVINGS DECLINE OVER 100 MW; ACTIVE DEMAND MANAGEMENT GROWS, BUT IS LOWER THAN POTENTIAL Passive (EE) and Active Demand Impacts 300 PA Potential Study ADM Extrapolation = 245 MW without storage 437 MW with storage 250 Summer Capacity (MW) 200 120 MW 83 MW 50 MW 150 100 131 MW 125 MW 122 MW 50 0 2017 2019 2020 2021 Planned - Passive EE Planned - Active Demand Actual - Passive EE www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 14

  15. . ACTIVE DEMAND MANAGEMENT VARIES SIGNIFICANTLY ACROSS PAS AND YEARS CLC Eversource National Grid Unitil Statewide Residential ADM (MW) 2019 0.6 1.4 3.6 0.1 5.7 2020 5.3 1.7 4.9 0.1 12.0 2021 5.5 2.1 5.6 0.1 13.3 C&I ADM (MW) 2019 0.2 8.8 35.0 0.2 44.1 2020 0.6 33.1 36.8 0.2 70.6 2021 0.6 67.6 38.6 0.2 107.0 Total ADM (MW) 2019 0.8 10.2 38.6 0.3 49.8 2020 5.9 34..8 41.7 0.3 82.7 2021 6.1 69.7 44.2 0.3 120.2 % of Peak Demand (MW) 2019 0.2% 0.2% 0.9% 0.3% 0.5% 2020 1.3% 0.7% 1.0% 0.3% 0.9% 2021 1.3% 1.4% 1.1% 0.3% 1.3% www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 15

  16. ADM STRATEGIES AND PURPOSES: WHAT SHOULD BE IN 2019-2021 PLAN? ► Plan should include several kinds of active demand management (ADM) to address several objectives − ADM useful for ramping, operational needs, shortage events in addition to peak demand reductions − Not limited solely to products bid into markets ► Winter peak demand important in addition to summer ► Automation and advances in technology enable customers to manage load in new ways ► Plan needs to consider new and broader purposes ► Key questions: − H ow much ADM does MA need/want, when, and why (for which purposes)? − What ADM is needed/valuable in addition to system peak reduction? www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 16

  17. 2019-2021 PLANNED LIFETIME ELECTRIC COST TO ACHIEVE ARE MUCH HIGHER THAN PREVIOUS YEARS Portfolio Lifetime Electric Cost to Achieve $0.060 $0.055 $0.050 $0.045 Evaluated $0.040 $/kWh Planned $0.035 Q4 2017 Consultant Estimate $0.030 $0.025 $0.020 $0.015 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 17

  18. ELECTRIC SAVINGS AS A % OF SALES VARY BY PA AND SECTOR Electric CLC Eversource National Grid Unitil Statewide Total 2019 1.43% 2.17% 2.23% 1.39% 2.16% 2020 1.36% 2.16% 2.12% 1.42% 2.10% 2021 1.31% 2.09% 2.09% 1.43% 2.05% 2019-2021 1.37% 2.14% 2.15% 1.41% 2.10% Residential 2019 1.01% 1.92% 2.56% 1.34% 2.18% 2020 0.86% 1.76% 2.37% 1.49% 2.01% 2021 0.78% 1.59% 2.20% 1.46% 1.85% 2019-2021 0.88% 1.76% 2.38% 1.43% 2.01% Low Income 2019 3.55% 2.09% 1.34% 0.18% 1.61% 2020 3.51% 2.04% 1.35% 0.20% 1.60% 2021 3.32% 2.00% 1.34% 0.20% 1.57% 2019-2021 3.46% 2.04% 1.35% 0.19% 1.59% C&I 2019 1.78% 2.28% 2.11% 1.70% 2.19% 2020 1.81% 2.33% 2.06% 1.68% 2.19% 2021 1.80% 2.31% 2.09% 1.71% 2.19% 2019-2021 1.80% 2.31% 2.09% 1.70% 2.19% Note: Years 2019-2021 use 2018 as sales reference www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 18

  19. GAS www.ma-eeac.org 2019-2021 Draft Plan Consultant Review | 19

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.