2014 ACEC-KY / FHWA / KYTC Partnering Conference Breaking news - - PowerPoint PPT Presentation

2014 acec ky fhwa kytc partnering conference breaking news
SMART_READER_LITE
LIVE PREVIEW

2014 ACEC-KY / FHWA / KYTC Partnering Conference Breaking news - - PowerPoint PPT Presentation

Sept. 10, 2014 2014 ACEC-KY / FHWA / KYTC Partnering Conference Breaking news Sept. 10, 2014 The Project Priority set by Gov. Beshear, Kentucky General Assembly Widening 46 miles of existing 2-lane roads Preliminary cost estimate:


slide-1
SLIDE 1
  • Sept. 10, 2014

2014 ACEC-KY / FHWA / KYTC Partnering Conference

slide-2
SLIDE 2
  • Sept. 10, 2014

Breaking news

slide-3
SLIDE 3
  • Sept. 10, 2014
  • Priority set by Gov. Beshear,

Kentucky General Assembly

  • Widening 46 miles of existing

2-lane roads

  • Preliminary cost estimate:

$753.6 million

  • Construction work phased over

6+ years

  • Much of corridor follows

winding path near mountains and streams

The Project

slide-4
SLIDE 4
  • Sept. 10, 2014
slide-5
SLIDE 5
  • Sept. 10, 2014

Project Goals

  • Complete a four-lane,

high-speed corridor from Campton to Prestonsburg

  • Improve safety
  • Maintain limited-access

parkway

  • Limit environmental

impacts

  • Support state and federal

efforts to boost economic development, business and tourism

slide-6
SLIDE 6
  • Sept. 10, 2014

Project Funding

  • $753 million preliminary cost estimate
  • $381 million provided in Six-Year Plan
  • $108 million in biennium
  • Priority on cost savings and innovation
slide-7
SLIDE 7
  • Sept. 10, 2014

Project Sequences

slide-8
SLIDE 8
  • Sept. 10, 2014

Geographic Sections

slide-9
SLIDE 9
  • Sept. 10, 2014
  • Preliminary Engineering
  • Environmental
  • Project Management
  • Contract Administration
  • Design
  • Oversight
  • Right of Way Acquisition
  • Utility Relocation
  • Communications
  • Record Keeping
  • Construction Supervision
  • Construction Inspection
  • Other duties as determined through

the life of the contract

General Engineering Consultant

KYTC goal: Provide experience, continuity over life of long-term, mega projects Areas of responsibility include:

slide-10
SLIDE 10
  • Sept. 10, 2014
  • Bill Morris, Stantec – Roadway Specialist
  • Danny Woods, Stantec – Structures Specialist
  • Adam Crace, Stantec – Geotechnical Specialist
  • Harsha Wijesiri, Integrated Engineering – Drainage

Specialist

  • Christopher Jenkins, Qk4 – Construction Specialist
  • Travis Carrico, KYTC – Construction /

Constructability Specialist

  • Shawn Russell, KYTC – Construction /

Constructability Specialist

  • Darren Back, KYTC – Roadway Specialist
  • Renee Hoekstra, CVS, RHA, LLC – VE Team Leader
  • Patrice Miller, AVS, RHA, LLC – VE Assistant Team

Leader

Value Engineering Study Team

KYTC goal: Create public-private team of experts to find solutions that lower costs, improve safety and build a better parkway

slide-11
SLIDE 11
  • Sept. 10, 2014

Challenges

slide-12
SLIDE 12
  • Sept. 10, 2014
slide-13
SLIDE 13
  • Sept. 10, 2014
slide-14
SLIDE 14
  • Sept. 10, 2014
slide-15
SLIDE 15
  • Sept. 10, 2014
slide-16
SLIDE 16
  • Sept. 10, 2014
slide-17
SLIDE 17
  • Sept. 10, 2014
slide-18
SLIDE 18
  • Sept. 10, 2014

Solutions

slide-19
SLIDE 19
  • Sept. 10, 2014
slide-20
SLIDE 20
  • Sept. 10, 2014

PUT PICTURE MEDIAN WALL HERE

slide-21
SLIDE 21
  • Sept. 10, 2014
slide-22
SLIDE 22
  • Sept. 10, 2014

Solution: Use median barrier to reduce the footprint through the cuts

Baseline Proposed

slide-23
SLIDE 23
  • Sept. 10, 2014

Solution: Bifurcate road to reduce cuts

Baseline Proposed

slide-24
SLIDE 24
  • Sept. 10, 2014

Solution: Raise grade to balance earthwork and reduce cuts

slide-25
SLIDE 25
  • Sept. 10, 2014

Solution: Reduce curvature of roadway

slide-26
SLIDE 26
  • Sept. 10, 2014

Construction Plans

slide-27
SLIDE 27
  • Sept. 10, 2014

Project Priorities

slide-28
SLIDE 28
  • Sept. 10, 2014
  • Project identity
  • Team communication

(GEC, cabinet, districts)

  • Public information and media

relations

  • Open house meetings
  • Milestone events

Communications Approach

slide-29
SLIDE 29
  • Sept. 10, 2014
  • Project website
  • Social media
  • Email

communications and e-newsletter

  • Updates for

community leaders

  • Mountain Parkway

Awareness Council

Communications Approach

slide-30
SLIDE 30
  • Sept. 10, 2014

What’s Ahead

  • Public meetings
  • Initial construction

letting

  • Groundbreaking
  • Clearing
  • Construction
  • Design work and VE

studies

slide-31
SLIDE 31
  • Sept. 10, 2014

Questions

slide-32
SLIDE 32
  • Sept. 10, 2014

Stay connected

  • Background on the

expansion

  • Updates on project

plans, meetings, etc.

  • Contacts for

project partners

  • Links to sign up for

e-communications like social media sites and email newsletters

www.MtnParkway.com

slide-33
SLIDE 33
  • Sept. 10, 2014

2014 ACEC-KY / FHWA / KYTC Partnering Conference