FY2017 Annual Budget Water/Wastewater Capital Improvement Plan FY 2017 Georgetown Utility Systems Advisory Board June 10, 2016 FY2017 Annual Budget Capital Improvement Plan Program funding sources: Operating Revenue (utility rates)


  1. FY2017 Annual Budget Water/Wastewater Capital Improvement Plan FY 2017 Georgetown Utility Systems Advisory Board June 10, 2016

  2. FY2017 Annual Budget Capital Improvement Plan Program funding sources: • – Operating Revenue (utility rates) – Impact Fees Capital Improvement Plan addresses need for superior water, wastewater, • irrigation service, and electric. Determined by many factors • Customer base growth – Service improvement – Rehabilitation of aging infrastructure – State and federal requirements – Competitive advantage – Contractual obligations –

  3. FY2017 Annual Budget Water Services - Georgetown – Water Mains - $6,274,000 • Leander Interconnect - $575,000 Approximately 2,000 LF of 12” line. – Potential interconnect with Leander water system – Potentially provide up to 6 million gallons per day – Provide redundancy Western District – • West Loop - $2,119,000 Along SH 29 (Wolf Ranch to DB Wood) – Replace existing 8/12” lines with 24” – Redundancy to Wolf Ranch Development and Pastor Pump Station – Assist with distribution of Round Rock water – • CR 255 - $3,000,000 Approximately 7 miles (Daniels Mountain tank site to SH 29) – Continuation of Western District line replacement under design and partially funded FY 16 – Maintenance and rehabilitation (multiple breaks, poor bedding, substandard material) – • Street Rehab - $330,000 W. 11 th Street (Main-Rock) – • Western District Line Upgrades - $250,000 As needed to meet TCEQ requirements –

  4. FY2017 Annual Budget Water Services - Georgetown • Water Treatment - $6,100,000 – Lake Treatment Plant Maintenance - $600,000 Estimated to need approximately 2 million gallons per/year • Lake intake maintenance • Increase intake capacity to almost 38 million gallons • Additional treatment will be required • Estimated at $12 million (FY 18/19) • – South Lake Treatment Plant - $1MM Site Selection (2017) • Permits (2018) • Design (2019-2020) • New treatment facility (2022-23) • 5-10 year development plan • Approximately 12 million gallons initially • Approximately $35 million total •

  5. FY2017 Annual Budget Water Services - Georgetown • Water Treatment – Domel Pump Station - $4,500,000 Add filtration to Domel Pump Station rehabilitation project • (funded in FY 16). Potential risk of losing 3 million gallons per day if certain • contaminants are found.

  6. FY2017 Annual Budget Water Services - Georgetown • Water Storage -$6,030,000 – Sun City Elevated Storage Tank - $3,050,000 Replace existing 400,000 gallon elevated tank • Construct new 1.5 million gallon elevated tank • Required to meet growing demands • – Sequoia Ground Storage Tank - $2,500,000 3-4 million gallon tank on existing site • Ground tank instead of elevated in Georgetown Village • Increased treated water storage to help Lake Plant peak • Very competitive tank pricing currently available • – Tank Rehabilitation - $480,000 Repair and rehabilitate existing metal tanks • Typically required every 12-15 years • Airport Road Reuse tank (2017) • Daniels Mountain small tank (2018) • Daniels Mountain large tank (2019) •

  7. FY2017 Annual Budget

  8. FY2017 Annual Budget Wastewater Services Wastewater Improvements - $13,636,000 • Edwards Aquifer Recharge Zone (EARZ) 2015 - $1,500,000 – Continuation of existing program • Identification and replacement of damaged sewer lines and manholes • Street Projects - $136,000 – W. 11 th Street (Rock – Main) • Berry Creek Interceptor - $12,000,000 – Initial phase of construction planned for late 2016 (Sun City to Airport Road) • Airport Road to Pecan Branch Wastewater Treatment Plant • Proposed funding for potential Public-Private Partnership with Homestead Development • Provide permanent wastewater capacity to expanded Sun City, Shell Road, and Hwy 195 Corridor • Ultimately take Sun City Lift Station offline •

  9. FY2017 Annual Budget Wastewater Services Lift stations - $4,532,000 • Park Lift Station and Force Main - $3,982,000 – Existing San Gabriel Wastewater Treatment Plant Lift Station • Required repairs of existing station and capacity expansion for development • Lift Station Upgrades - $550,000 – TCEQ/SSO plan requirements • Redundant power • Electrical/control system upgrades • Lift stations to be prioritized based on field conditions • Irrigation System • No improvements proposed –

  10. FY2017 Annual Budget Wastewater Services Plant Upgrades - $10,155,000 • Pecan Branch Wastewater Treatment Plant Expansion - $7,948,000 – 1.5/1.8 million gallons per day to 3.0/3.6 million gallons per day • TCEQ mandate to initiate construction based on actual plan flows • Design previously initiated • 18 month construction schedule (additional $3,600,000 FY 18) • Ultimate terminus for Berry Creek Interceptor (Sun City, Shell Road, Hwy 195, Berry Creek • areas) San Gabriel Wastewater Treatment Plant Belt Press - $2,207,000 – Sludge dewatering currently manual, inefficient, limited capacity, and weather dependent • Belt press will mechanically & chemically dewater sludge • Free up drying bed space onsite •

  11. FY2017 Annual Budget

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.