WATER UTILITIES PRESENTATION FOR FWP HEARING MEETING 03 November 2016 The Current Problem Gisborne City Wastewater Property Issues Robert from Kaiti (1:28 min) https://www.youtube.com/watch?v=YMBwfw7pz-0 Di from Mangapapa (2:10 min)


  1. WATER UTILITIES PRESENTATION FOR FWP HEARING MEETING – 03 November 2016

  2. The Current Problem

  3. Gisborne City Wastewater – Property Issues Robert from Kaiti (1:28 min) https://www.youtube.com/watch?v=YMBwfw7pz-0 Di from Mangapapa (2:10 min) https://www.youtube.com/watch?v=09_s5wDKUrw Stormwater Ponding Kaiti (1:50 min) https://www.youtube.com/watch?v=njGuyjw1BZo&f eature=youtu.be

  4. Gisborne City Overflow Points (49) 1992 – Lots of uncontrolled overflows in operation 1998 – All known cross connections removed/blocked 2000 – All known Pump Stn overflows removed/blocked 2008 – Further checking undertaken 2015/16 – Audit of all Pump Stn overflows 2016 – All known overflows are now controlled

  5. Wastewater Discharges- Event History (24-36hrs) Reporting Frequency of Year discharges 2015/16 1 2014/15 1 2013/14 4 2012/13 3 2011/12 4 2010/11 3 2009/10 4 2008/09 2 2007/08 2 Prior to 2006/07 unknown

  6. DrainWise Project - Background video: http://youtu.be/pq5cG1YFciA Water Ponding Areas (RoG)

  7. DrainWise Project - Background Flood waters flowing over and into private gully traps • Water getting into leaking private gully traps • High Impact Roof water being piped straight into private gully • traps or private lateral wastewater pipes HIGH (GROSS) HIGH (GROSS) • Gully trap faults, • Gully overtopping from ponding • illegal connections,

  8. DrainWise Project – The needle in the haystack

  9. Budget 2015/25 Overall 2015/25 (10 yrs) Total Budget (Current) 26,621,873 In the Long Term Plan 2015/25 Council has allocated $26.6M Wastewater (WW) 19,626,770 over the 10 years. WW - Renewals (Retic) 12,500,000 WW - Upgrades (Retic) 4,250,000 The budget does not cover any Inflow & Infiltration private property improvements, Inspections/Modelling 2,566,070 it was assumes that the property owner would be responsible for WW - Private Property Investigations 310,700 this Stormwater (SW) 6,995,103 SW - Renewals 3,208,200 SW - Upgrades 3,197,673 SW - Model 310,700 SW - Private Property Investigations 267,500 SW - Secondary Flowpaths 11,030

  10. Gisborne City Wastewater – Gully Traps

  11. Gisborne City Wastewater – Gully Traps

  12. DrainWise Project – Our Targets 1. Reduction of wastewater discharged into rivers and streams during heavy rain to an average of only once every two years by 2026/27 2. Reduction of wastewater discharged onto private property during heavy rain to an average of only once every two years by 2026/27 Comment: This equates to a 50% AEP rain event targeting 10% AEP

  13. Wastewater Modeling Results

  14. Wastewater Modeling Results Pipe improvements

  15. - End of Presentation – Questions Di from Mangapapa (2:10 min) https://www.youtube.com/watch?v=09_s5wDKUrw Robert from Kaiti (1:28 min) https://www.youtube.com/watch?v=YMBwfw7pz-0 Stormwater Ponding Kaiti (1:50 min) https://www.youtube.com/watch?v=njGuyjw1BZo&feature=youtu.be Illegal: Stormwater downpipes going to Gully Trap (2:02 min) https://www.youtube.com/watch?v=SoMPfnFGTko&feature=youtu.be Panapa from Kaiti (3:00 min) https://www.youtube.com/watch?v=w8nEKBqR-mM&feature=youtu.be Smoke testing (2:28 min) https://www.youtube.com/watch?v=gJzgBFIReVs&feature=youtu.be

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.