WATER INFLUENCED DESIGN SOLUTIONS Representative projects Spadina - - PowerPoint PPT Presentation

water influenced design solutions representative projects
SMART_READER_LITE
LIVE PREVIEW

WATER INFLUENCED DESIGN SOLUTIONS Representative projects Spadina - - PowerPoint PPT Presentation

WATER INFLUENCED DESIGN SOLUTIONS Representative projects Spadina Quay Wetland Guelph West Recreation Center OConnor Park Jim Melvin WEST QUAY QUEENS 10 25% Em BN l t s p h a 3 30% He A 4 6 6 . 3 20% Li . 7


slide-1
SLIDE 1

Representative projects

  • Spadina Quay Wetland
  • Guelph West Recreation Center
  • O’Connor Park

WATER INFLUENCED DESIGN SOLUTIONS

Jim Melvin

slide-2
SLIDE 2

LS HW C B CB HW HW HW HW HW LS LS Pole 7 6 . 4 3 7 6 . 5 1 7 5 . 8 2 7 5 . 8 2 7 5 . 8 1 7 5 . 8 5 7 6 . 4 7 6 . 3 8 7 6 . 4 2 7 6 . 4 4 7 6 . 3 6 7 6 . 6 7 6 . 6 7 7 6 . 7 2 7 6 . 7 7 6 . 7 7 7 6 . 7 6 7 6 . 7 1 7 6 . 6 4 7 6 . 5 2 7 6 . 4 4 7 6 . 3 5 7 6 . 6 1 7 6 . 4 1 7 6 . 5 9 7 6 . 7 5 7 4 . 8 2 7 4 . 9 1 7 4 . 5 7 4 . 5 2 7 4 . 5 9 7 4 . 7 7 7 4 . 6 9 7 6 . 5 9 7 6 . 5 8 7 6 . 4 9 7 6 . 7 9 7 6 . 8 1 7 6 . 8 2 7 6 . 2 2 7 6 . 1 4 7 6 . 8 2 7 6 . 7 4 7 6 . 6 7 6 . 1 7 6 . 7 6 7 6 . 6 1 7 6 . 9 7 6 . 2 5 7 7 . 9 7 6 . 9 4 7 6 . 4 6 7 6 . 2 9 7 6 . 8 6 7 6 . 5 8 7 6 . 7 4 7 6 . 6 1 7 6 . 5 2 7 6 . 5 7 6 . 7 3 7 6 . 8 2 7 6 . 8 9 7 6 . 4 5 7 6 . 9 2 7 6 . 8 2 7 6 . 8 4 7 6 . 8 2 7 6 . 8 2 T

  • p
  • f

O l d W a l l = 7 6 . 3 5 T

  • p
  • f

W a l l = 7 6 . 3 1 T

  • p
  • f

W a l l = 7 6 . 3 1 Curb Cut G r a n i t e a n d C

  • n

c r e t e W a l k Kiosk Grass C

  • n

c r e t e W a l k

  • Ex. Concrete Walk

G r a n i t e a n d C

  • n

c r e t e W a l k G r a n i t e a n d C

  • n

c r e t e W a l k E d g e

  • f

C

  • n

c r e t e C

  • n

c r e t e C u r b C u r b C u t A s p h a l t A s p h a l t W a t e r L e v e l = 7 4 . 4 7

  • Ex. Concrete

S t e p Street Line S t r e e t L i n e S t e p

76.68 76.53

N e w C

  • n

c r e t e C u r b E x . C

  • n

c r e t e

123.45 ID 123.45 ID 123.45 ID 123.45 ID WR

C r i b Ø . Ø 5 E a s t C
  • n
c r e t e W a l l W
  • d
B e n c h C C Shrubs M e t a l L a d d e r B
  • l
l a r d M e t a l L a d d e r Building Concrete Concrete and Granite Walk 76.34 76.37 76.41 76.72 7 6 . 6 6 76.62 76.23 76.12 76.24 76.17 76.27 76.2Ø 76.31 76.24 76.27 76.35 76.37 76.3Ø 76.25 76.28 76.6Ø 76.44 76.3Ø 76.53 76.24 75.65 75.59 76.25 76.24 76.21 77.38 Concrete Wall

LS 76.62 76.68 76.75 76.79 76.79 76.85 76.86 76.70 76.72 76.72 76.68 76.41 76.44 76.46 76.48 76.50 76.50 76.25 76.00 75.75 75.50 75.25 76.75 75.00 74.75 74.75 75.00 75.25 75.50 75.75 76.00 7 6 . 2 5 7 6 . 5 76.75 7 6 . 5 76.50 76.25 76.00 7 5 . 7 5 75.50 75.25 75.00 74.75 74.75 75.00 75.25 75.50 75.75 76.00 76.50 76.75 77.00 77.00 76.25

Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard Bollard B
  • l
l a r d

C

  • n

c r e t e W a l l C

  • n

c r e t e W a l l

Timber Bumper Timber Bumper Timber Bumper

. 1 . 2

Spk. Spk. Spk. HW WK Spk. W
  • d
B e n c h

. 1

Spk. Spk.

B i c y c l e R a c k

. 2 . 2

Board Fence

. 2 . 2 . 2 Open Gazebo

Floodlight Floodlight Floodlight Floodlight B
  • a
r d F e n c e

. 2 . 1

LS

. 2 . 2 Planter Concrete Concrete Walk Concrete Walk Concrete Walk

C
  • n
c r e t e C u r b Concrete & Metal Guard Rail

C

  • n

c r e t e a n d G r a n i t e W a l k W

  • d

D

  • c

k

Concrete Wall

B
  • l
l a r d Timber Bumper B
  • l
l a r d Metal Ladder

Water Level = 75.26 Shrubs

CC LS HW LS CC(MM) Post S M H S P Water Fountain Metal Ladder Control Valve Chain Link Metal Ladder Bollard

C r i b C r i b C r i b

Concrete Wall 0.27 South Metal Chain N 82 32'00"E 1 1 1.41

S P A D I N A S L I P QUEENS QUAY WEST

P L A N 6 6 R

  • 1

5 4 3 5 PART 1 , PLAN 66R-13832

PART 1 PLAN 63R-2346

7 5 . 8 7 5 . 7 8 7 6 . 3 1 7 6 . 4 2 7 6 . 2 9 7 6 . 4 1 7 7 . 8 7 7 . 4 7 7 . 4 6 7 7 . 4 5 7 7 . 3 8 7 7 . 3 1 7 7 . 2 4 7 7 . 2 7 7 . 2 9 7 7 . 2 1 7 7 . 1 4 7 7 . 4 7 7 . 8 7 6 . 5 1 7 6 . 5 2 7 6 . 8 9 7 6 . 9 7 7 7 . 4 6 7 7 . 4 2 7 7 . 4 5 7 7 . 2 4 7 7 . 2 3 7 7 . 3 1 7 7 . 3 2 7 6 . 8 7 6 . 6 3 7 6 . 7 1 7 6 . 8 5 7 6 . 7 3 7 6 . 6 4 7 6 . 6 2 7 6 . 5 7 B C = 7 6 . 7 5 7 6 . 9 9 7 6 . 9 4

90 º 90º

14 14.2 .2 177.25 TOP OF RAMP AND DECK 177.25

C B D E A E B A C E E D D D D A C 103 16.6 18.4 8.5 49.6 31.4 36.5 14.7 25.8 10.3 11.2 16.8 27 21.3 18.4 30.7 25 8.9 8.5 21 14.7 12.5 9.1 26.2 7.8 3 4.4 72.2 44.6 166 46 84 15.6 200 20.7 20.7

  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.

tcn

10 BN

25% Em 30% He 20% Li 25% Dc 111 sq. m. 2.7

35 cs 21 cs

253.5 Mc Cl, and Al

  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.

As large/small 10.3

5 ac 16 cs 5 BN

Rb B

4 FP

Hh Ad As Em, Hl, Dc, Ls As

  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.

22 cs 3 TO

Sv

  • sq. m.
  • sq. m.
  • sq. m.

Cf Cp Cp

  • sq. m.
  • sq. m.
  • sq. m.
  • sq. m.

3 CC

Cf Sv Sv

3 ac

  • sq. m.

Cp Ms 21.5sq. m. Vs

6 TO

Mc,Tc Mc, Tc 38.4 18.9

  • sq. m.
  • sq. m.

tcn

Root Root B&B B&B B&B WB B&B B&B POT POT POT B&B B&B POT POT B&B

Cf

Toront

  • Music

Garde n Toronto Music Garden

Spadina Quay Wetland – Pike Spawning Ground (99)

slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5

Guelph West Recreation Center

Fish relocation and storm pond management

slide-6
SLIDE 6
slide-7
SLIDE 7

O’Connor Park, Mississauga 2010 - 2012

slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10

Turtle Collection Soil Banking

Site Preparation

slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13

Maintenance Program

Prepared by: PMA LANDSCAPE ARCHITECTS December 9th, 2011

224 Wallace Ave., Suite 321, Toronto, ON, Canada, M6H 1V7

t 416.239.9818 f 416.239.1310 e design@pmalarch.ca www.pmalarch.ca

O’CONNOR PARK

ii

L A N D S C A P E A R C H I T E C T S

PM A O’Connor Park

SIB SIB CCUT C C U T BC CCUT B L M BC BC CCUT BC BC EP C C U T CCUT CCUT CCUT EP CCUT CCUT CCUT CCUT CCUT CCUT CCUT CCUT CCUT CCUT CCUT CCUT CCUT BC CCUT CCUT C C U T CSW C P A D B B C A T V L S L S C A T V L S B B C P A D C P A D B B C A T V C A T V L S B B B B C A T V L S W V L S C A T V B B C P A D F H W V L S M H ( S A N ) C B C B M H ( S A N ) M H ( S T M ) C B M H ( S T M ) BOS ASPHALT BC CCUT CCUT BC BC C A T V L S C P A D M B O X C C U T CCUT CCUT CCUT CCUT CCUT CCUT L S C P A D B B C A T V F H W V CSW EP EP CCUT BC BC L S W V C C U T CCUT BC CCUT BC CCUT L S B B C P A D S I G N S I G N C A T V W V CCUT BC F H CCUT BC CCUT CCUT BC CCUT BC CCUT EP B B C A T V C P A D C B M H ( S T M ) M H ( S T M ) M H ( S A N ) C B M H ( S T M ) C B C B T O S BC CCUT BC CCUT BC B C CCUT ASPHALT BC BC M H ( S T M ) BC CCUT SIB T O S TOS BOS BOS CSW CSW M H ( S T M ) M H ( S T M ) CSW CSW ASPHALT CSW IB SIB EL EL EL EL EL EL EL EL EL EL EL H H H H TV TV TV GAS GAS H H BELL BELL BELL BELL GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS WM WM WM BELL BELL BELL BELL BELL BELL BELL BELL BELL BELL BELL WM H TV H TV H H TV WM BELL BELL WM BELL H BELL TV WM H WM BELL BELL BELL TV H WM WM TV BELL BELL TV BELL WM BELL H WM BELL TV TVBELL BELL WM WM BELL GAS HBELL H BELL GAS GAS H TV GAS TV GAS EL EL EL M H ( S A N ) 1 C B 3 C B 4 M H ( S T M ) 5 C B 8 C B 9 M H ( S T M ) 1 M H ( S A N ) 1 1 C B 1 2 C B 1 3 M H ( S T M ) 1 4 C B 1 5 C B 1 7 C B M H ( S T M ) 2 H GAS GAS H H GAS H H GAS GAS H WM WM WM WM GAS GAS GAS GAS GAS H H H H H H WM WM W M WM WM H GAS GAS WM WM WM H C B 3 1 C B 3 2 M H ( S T M ) 3 3 M H ( S T M ) 3 4 M H ( S A N ) 3 5 C B 3 6 C B 3 7 M H ( S T M ) 3 8 M H ( S T M ) 3 9 M H ( S A N ) 4 M H ( S T M ) 4 1 M H ( S T M ) 4 2 M H ( S A N ) 4 3 H H GAS GAS H H GAS M H ( S A N ) 2 5 M H ( S A N ) 2 8 C B 2 9 C B 3 C B C B M H ( S T M ) 1 6 M H ( S A N ) 6 M H ( S T M ) 2 6 M H ( S T M ) 2 7 M H ( S T M ) 2 4 M H ( S T M ) 2 3 S T R M STRM STRM STRM S T R M STRM S T R M STRM STRM STRM STRM STRM STRM STRM STRM STRM S T R M S A N S A N SAN SAN SAN S A N SAN SAN SAN TV T V T V T V TV TV EL EL 193.22 MHS FH 193.00 LS scale 1:500 metres 25 50 75 100 125 25 50 75 100 125 150 150 CSW H TV FH FH FH FH FH CSW IB B

park map

ADJACENT LAND SUNLIGHT STREET BALA DRIVE

BC CCU C T CU C T UT CC CCUT CU C T CU UT UT T M H ( S M M BC GA H M M M M M M M M H ( S M M M M M M M H ( S M M M M M H ( S T M ) 4 2 H ( S H ( ( M M H ( S A N )

N

NTS RUTH THOMPSON MIDDLE SCHOOL

LOW MAINTENANCE: NATURAL BIOTA PARK MAINTENANCE: LANDSCAPE MAINTENANCE SPORTSFIELD MAINTENANCE

fj gure 1 - Park Map