US 41/SR 45/South 50 th Street at CSX Grade Separation Design - - PowerPoint PPT Presentation

us 41 sr 45 south 50 th street at csx grade separation
SMART_READER_LITE
LIVE PREVIEW

US 41/SR 45/South 50 th Street at CSX Grade Separation Design - - PowerPoint PPT Presentation

US 41/SR 45/South 50 th Street at CSX Grade Separation Design Change Re-evaluation AGENCY/ELECTED OFFICIALS KICK-OFF MEETING December 7, 2018 Project Overview Project purpose: - Fix CSX Queues - Improve operations at US 41 & SR 676


slide-1
SLIDE 1

US 41/SR 45/South 50th Street at CSX Grade Separation Design Change Re-evaluation

AGENCY/ELECTED OFFICIALS KICK-OFF MEETING

December 7, 2018

slide-2
SLIDE 2

Project Overview

Project purpose:

  • Fix CSX Queues
  • Improve operations at US 41 & SR 676 (Causeway Blvd)

Intersection

  • Improve safety for vehicles, pedestrians, and bicyclists

Need for re-evaluation:

  • Time since last approved PD&E study
  • Changes in land use and traffic volumes
  • Address environmental and stakeholders concerns
slide-3
SLIDE 3

Project Location

Project Limits: South of US 41B/SR 45/SR 676/Causeway Boulevard to North of Causeway Boulevard Approximately 1.5 miles Includes the CSX railroad crossing south of St. Paul St Studying intersection improvement alternatives including a grade separation at the CSX railroad crossing

slide-4
SLIDE 4

Previous Efforts

Environmental Assessment with a Finding of No Significant Impact (FONSI) approved in 1994 Feasibility Study completed in 2017

slide-5
SLIDE 5

Ongoing Efforts

Kick-off of project completed with FDOT District 7 July 18, 2018 Re-evaluating the PD&E study findings (EA with FONSI) Using the feasibility study (2017) to refine alternatives to be brought to the public

  • Applying new FDOT design criteria
  • Determine needs from updated traffic projections

Preparing for both an alternatives public meeting to present refined alternatives and public hearing in 2019 Coordinating to begin preliminary design activities through the FDOT SWAT process

slide-6
SLIDE 6

SWAT P T Process ss

Statewide Acceleration Transformation process

Purpose: to begin concurrent design activities within our re-evaluation process

PD&E/ Re-evaluation Design

Project Completion Process

PD&E/ Re-evaluation Design

SWAT Process

slide-7
SLIDE 7

Alternative 1

This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

  • Option 1B
  • US 41 Grade Separation at

CSX

  • Flyover for Northbound to

Westbound Movement

  • DS = 30 mph
  • Causeway Blvd. Widening to the

North

slide-8
SLIDE 8

Legend

Existing Right-of-Way Existing Parcel Lines Proposed Right-of-Way Proposed Pavement Proposed Bridges Impacted Parcels

This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

Alternative 1 Revised

  • Option 1B
  • US 41 Grade Separation at

CSX

  • Flyover for Northbound to

Westbound Movement

  • DS = 50 mph
  • Causeway Blvd. Widening to the

South

  • Dead-End Frontage Road from St.

Paul St.

SR 676 (Causeway Blvd.)
  • St. Paul St.
CSX Railroad CSX Railroad SR 45 (US 41) El Camino Blanco Blvd.
  • S. 47th St.
  • S. 45th St.
  • S. 47th St.
Sagasta St. Columbia St. Columbia St. Raleigh St.
  • S. 34th Ave.
36th Ave. S.
slide-9
SLIDE 9

This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

Alternative 2

  • Option 1C
  • US 41 Grade Separation at

CSX

  • Flyover for Northbound to

Westbound Movement

  • DS = 30 mph
  • Flyover for Thru Movement
  • Causeway Blvd. Widening to the

North

slide-10
SLIDE 10

Legend

This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

Alternative 2 Revised

  • Option 1C
  • US 41 Grade Separation at

CSX

  • Flyover for Northbound to

Westbound Movement

  • DS = 50 mph
  • Flyover for Thru Movement
  • Causeway Blvd. Widening to the

South

  • Northbound to Eastbound Crosses

CSX At-grade

SR 676 (Causeway Blvd.)
  • St. Paul St.
CSX Railroad CSX Railroad SR 45 (US 41) El Camino Blanco Blvd.
  • S. 47th St.
  • S. 45th St.
  • S. 47th St.
Sagasta St. Columbia St. Columbia St. Raleigh St.
  • S. 34th Ave.
36th Ave. S. 24th Ave. S.

Existing Right-of-Way Existing Parcel Lines Proposed Right-of-Way Proposed Pavement Proposed Bridges Impacted Parcels

slide-11
SLIDE 11

This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

Alternative 3

  • Option 2B
  • US 41 Grade Separation at

CSX

  • New alignment for removing

high volume Northbound to Westbound and Eastbound to Southbound movements from intersection

  • Flyover for Northbound to

Westbound and Eastbound to Southbound Movements

  • DS = 30 mph
slide-12
SLIDE 12

Legend

Existing Right-of-Way Existing Parcel Lines Proposed Right-of-Way Proposed Pavement Proposed Bridges Impacted Parcels

This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

Alternative 3 Revised

  • Option 2B
  • US 41 Grade Separation at

CSX

  • New alignment for removing

high volume Northbound to Westbound and Eastbound to Southbound movements from intersection

  • Flyover for Northbound to

Westbound and Eastbound to Southbound Movements

  • DS = 50 mph
  • Dead-End Frontage Road from St.

Paul St.

SR 676 (Causeway Blvd.)
  • St. Paul St.
CSX Railroad CSX Railroad El Camino Blanco Blvd.
  • S. 47th St.
  • S. 45th St.
  • S. 47th St.
Sagasta St. Columbia St. Columbia St. Raleigh St.
  • S. 34th Ave.
36th Ave. S.
slide-13
SLIDE 13

Alternative 4

slide-14
SLIDE 14

Anticipated Public Involvement Schedule

Summer Fall Winter Spring 2018 2019 Summer Summer Fall Winter Spring 2020

Study Begins Newsletter #1 Data Collection Engineering & Environmental Analysis Newsletter #2 Alternatives Public Workshop Newsletter #3 Public Hearing Newsletter #4 Study Complete Design Activities Begin

slide-15
SLIDE 15

Submit a comment (at any point in the study)

  • In person/mail:
  • Email: Lilliam.Escalera@dot.state.fl.us
  • Project Website:

http://active.fdotd7studies.com/us41/csx-tosr676

Attend our public meetings

  • Alternatives Public Meeting: Spring 2019
  • Public Hearing: Winter 2019

Your input is valued throughout the re-evaluation

*Check our project website if you ever need a reminder of the schedule or current activities…

(All comment submittal info is included in your handout)

Lilliam Escalera Florida Department of Transportation 11201 N. McKinley Drive, MS 7-500 Tampa, FL 33612

slide-16
SLIDE 16

DI DISCU CUSSION