Unlocking Azerbaijan’s hydrocarbon potential through exploration, production and transportation
Bahram Huseynov
Vice-president on Geology and Geophysics, SOCAR
1
Unlocking Azerbaijans hydrocarbon potential through exploration, - - PowerPoint PPT Presentation
Unlocking Azerbaijans hydrocarbon potential through exploration, production and transportation Bahram Huseynov Vice-president on Geology and Geophysics, SOCAR 1 Azerbaijan the Land of Fire Yanar Dag -Burning Hill is a natural
Vice-president on Geology and Geophysics, SOCAR
1
Oil extraction methods before the first half of 19 century were very primitive —mainly hand- dug wells, drilled to very shallow depths.
“Yanar Dag” -”Burning Hill” is a natural gas fire as a result of steady seep of gas from the subsurface on a hillside on the Absheron Peninsula near Baku. Over 400 mud volcanoes in the coastal area of
with hydrocarbons trapped underground.
A turning point in oil production was in 1846 when the first in the World oil well mechanically drilled in Bibiheybat near Baku. 2
is involved in exploring oil and gas fields, producing, processing, and transporting oil, gas, and gas condensate, marketing petroleum and petrochemical products in domestic and international markets, and supplying natural gas to industry and the public in Azerbaijan. Three production divisions,one oil refinery and one gas processing plant, an oil tanker fleet, a deep water platform fabrication yard, two trusts, one institution, and 22 subdivisions are operating as corporate entities under SOCAR.
Consortium and International Association of Oil and Gas Producers.
SOCAR - STATE OIL COMPANY OF THE AZERBAIJAN REPUBLIC
53 in onshore and 27 in offshore.
in Bibiheybat near to Baku.
1871 in fields near to Baku, Absheron Peninsula in Bibiheybat and Balakhany- Sabunchy- Ramana fields, which are still in production.
condensate and more than 740 bcm of gas produced in from start of first production.
10,000 15,000 20,000 25,000 30,000 35,000
1920 1922 1924 1926 1928 1930 1932 1934 1936 1938 1940 1942 1944 1946 1948 1950 1952 1954 1956 1958 1960 1962 1964 1966 1968 1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016
Azerbaijan Historical Gas Production, million cubic meters
Onshore Offshore ACG Shahdeniz
5
20,000 30,000 40,000 50,000 60,000
1846 1850 1854 1858 1862 1866 1870 1874 1878 1882 1886 1890 1894 1898 1902 1906 1910 1914 1918 1922 1926 1930 1934 1938 1942 1946 1950 1954 1958 1962 1966 1970 1974 1978 1982 1986 1990 1994 1998 2002 2006 2010 2014
Azerbaijan Historical Oil Production, thousand tons
Onshore Offshore ACG Shahdeniz
1997- first ACG oil 1950- first
1941 pick production 1846 fist well
2 billion tones oil produced on 08-Nov-2017
1871- first
1901 pick production 2011 pick production 1921- first
~740 bn. m3 of the gas has been produced by the mid 2018
2006- first SD gas 1963- first
2014 pick production 1984 pick production
Legendary Neft Daşları, also known as the Oil Rocks was the first offshore oil production in the world (1949), incorporating numerous drilling platforms via
as the world's first offshore oil production. The most distinctive feature of Neft Daşları is that it is actually a functional city with a population of about 2,000 and over 300 km of coseways built on piles.
Heydar Aliyev, one of the landmark agreements in Azerbaijan`s 20th-century history was signed.
Development and Production Sharing for the Azeri and Chirag Fields and the Deep Water Portion of the Gunashli Field in the Azerbaijan Sector of the Caspian Sea was signed on September 20, 1994.
companies have signed 38 production sharing agreements.
7
ACG is operated by BP on behalf of the Azerbaijan International Operating Company. It is the largest
the Caspian basin, located about 100km east of Baku.
Chirag section. It now also includes the Central, West and East Azeri, Deepwater Gunashli and West Chirag sections.
in 2017 produced more 29 million tonnes of oil. It also delivered SOCAR 2.75 billion cubic metres of gas for domestic use. About 10 bcm
reservoir for pressure support
8
total 8 mln m3 per day
28.8% 10%
AzSD
19% 15.5% 10% 10% 6.7%
Didscovered and being prepared for development 1. Absheron 2. Umid 3. ACG “Deep Gas” 4. Karabakh
Blocks contracted for exploration (3D seismic) 1. Ashrafi-Dan Ulduzu- Aypara 2. D-230 Prospects prepared for exploration drilling 1. Shahdeniz 3 2. Babek 3. Shafaq-Asiman 4. Nakhchivan 5. Zafar-Mashal 6. North Khali 7. Qarabatdaq 8. Bibiheybat East
10
66 leads requiring additional seismic:
11
12
12
1989, 31 geoscientists and reservoir engineers from SOCAR participated in 3 months Overseas Training Programs, JOGMEC’s Research and Training Center in Tokyo which were fully sponsored by JOGMEC.
May 2018, during 25th International Caspian Oil and Gas Conference and Exibition in Baku which assumes collaboration in the areas of Geological and Geophysical Survey, Technical Corporation and Human Resources Development
INPEX organized Trainings for SOCAR specialists and BHOS students: 2014/2015 Discussion by on Training Programme in Baku 2016 Geo/Reservoir Modeling and Field Development concept Training in Japan – 3 months 4 Geol. /RE 2017 Geo/Reservoir Modeling and Field Development concept Training in Japan – 3 months 4 Geol. /RE 2017 EoR lecture at Baku Higher Oil School by Prof. Kurihara, Waseda Univ.- for 60 students 2018 EOR simulation and exercise training in Baku for by Prof. Kurihara, Waseda Univ. - 15 SOCAR Geol./RE 2019 Geo/Reservoir modeling and Field Development concept Training in Japan (planned) 13
2017, Waseda Univ. 2016, Waseda Univ. 2016, Waseda Univ. 2017, Higher Oil School , SOCAR. 2018, Baku
14
Pirallahi field
and geologists collaborate closely with ITOCHU specialists.
investigated by SOCAR and ITOCHU engineers.
sample will be taken from the same well after starting the production.
calculated and as a result most suitable EOR method will be selected.
EOR/IOR Joint study in Pirallahi field started on April 2017