Unlocking Azerbaijans hydrocarbon potential through exploration, - - PowerPoint PPT Presentation

unlocking azerbaijan s hydrocarbon potential through
SMART_READER_LITE
LIVE PREVIEW

Unlocking Azerbaijans hydrocarbon potential through exploration, - - PowerPoint PPT Presentation

Unlocking Azerbaijans hydrocarbon potential through exploration, production and transportation Bahram Huseynov Vice-president on Geology and Geophysics, SOCAR 1 Azerbaijan the Land of Fire Yanar Dag -Burning Hill is a natural


slide-1
SLIDE 1

Unlocking Azerbaijan’s hydrocarbon potential through exploration, production and transportation

Bahram Huseynov

Vice-president on Geology and Geophysics, SOCAR

1

slide-2
SLIDE 2

Azerbaijan the Land of Fire

Oil extraction methods before the first half of 19 century were very primitive —mainly hand- dug wells, drilled to very shallow depths.

“Yanar Dag” -”Burning Hill” is a natural gas fire as a result of steady seep of gas from the subsurface on a hillside on the Absheron Peninsula near Baku. Over 400 mud volcanoes in the coastal area of

  • Azerbaijan. Mud volcanoes are closely associated

with hydrocarbons trapped underground.

A turning point in oil production was in 1846 when the first in the World oil well mechanically drilled in Bibiheybat near Baku. 2

slide-3
SLIDE 3
  • The State Oil Company of the Azerbaijan Republic (SOCAR)

is involved in exploring oil and gas fields, producing, processing, and transporting oil, gas, and gas condensate, marketing petroleum and petrochemical products in domestic and international markets, and supplying natural gas to industry and the public in Azerbaijan. Three production divisions,one oil refinery and one gas processing plant, an oil tanker fleet, a deep water platform fabrication yard, two trusts, one institution, and 22 subdivisions are operating as corporate entities under SOCAR.

  • Joint ventures (including ventures in Georgia and Turkey),
  • SOCAR is member of Upstream International Benchmarking

Consortium and International Association of Oil and Gas Producers.

SOCAR - STATE OIL COMPANY OF THE AZERBAIJAN REPUBLIC

slide-4
SLIDE 4

Azerbaijan exploration potential

  • 80 oil and gas fields were discovered,

53 in onshore and 27 in offshore.

  • Production taking place in 65 fields.
  • First discovery well was drilled in 1846

in Bibiheybat near to Baku.

  • First industrial oil production started in

1871 in fields near to Baku, Absheron Peninsula in Bibiheybat and Balakhany- Sabunchy- Ramana fields, which are still in production.

  • More than 2 billion tones of oli plus

condensate and more than 740 bcm of gas produced in from start of first production.

slide-5
SLIDE 5
  • 5,000

10,000 15,000 20,000 25,000 30,000 35,000

1920 1922 1924 1926 1928 1930 1932 1934 1936 1938 1940 1942 1944 1946 1948 1950 1952 1954 1956 1958 1960 1962 1964 1966 1968 1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016

Azerbaijan Historical Gas Production, million cubic meters

Onshore Offshore ACG Shahdeniz

5

History of oil and gas production in Azerbaijan

  • 10,000

20,000 30,000 40,000 50,000 60,000

1846 1850 1854 1858 1862 1866 1870 1874 1878 1882 1886 1890 1894 1898 1902 1906 1910 1914 1918 1922 1926 1930 1934 1938 1942 1946 1950 1954 1958 1962 1966 1970 1974 1978 1982 1986 1990 1994 1998 2002 2006 2010 2014

Azerbaijan Historical Oil Production, thousand tons

Onshore Offshore ACG Shahdeniz

1997- first ACG oil 1950- first

  • ffshore oil

1941 pick production 1846 fist well

2 billion tones oil produced on 08-Nov-2017

1871- first

  • nshore oil

1901 pick production 2011 pick production 1921- first

  • nshore gas

~740 bn. m3 of the gas has been produced by the mid 2018

2006- first SD gas 1963- first

  • ffshore gas

2014 pick production 1984 pick production

slide-6
SLIDE 6

Azneft Production Business Unit

  • Azneft BU as a national operator produces oil and gas reserves of SOCAR on 42 onshore and offshore
  • il and gas fields. In 2017 BU produced 6.2 million tones of oil and 5.4 billion m3 of gas.

Legendary Neft Daşları, also known as the Oil Rocks was the first offshore oil production in the world (1949), incorporating numerous drilling platforms via

  • coseways. It is featured in Guinness World Records

as the world's first offshore oil production. The most distinctive feature of Neft Daşları is that it is actually a functional city with a population of about 2,000 and over 300 km of coseways built on piles.

slide-7
SLIDE 7

The Contract of the Century

  • Under the leadership of national leader

Heydar Aliyev, one of the landmark agreements in Azerbaijan`s 20th-century history was signed.

  • The Agreement on the Joint

Development and Production Sharing for the Azeri and Chirag Fields and the Deep Water Portion of the Gunashli Field in the Azerbaijan Sector of the Caspian Sea was signed on September 20, 1994.

  • Since that, SOCAR and foreign oil

companies have signed 38 production sharing agreements.

7

slide-8
SLIDE 8

Azeri-Cirag-Guneshli Fields Development

  • Azeri-Chirag-Deepwater Gunashli

ACG is operated by BP on behalf of the Azerbaijan International Operating Company. It is the largest

  • ilfield in the Azerbaijan sector of

the Caspian basin, located about 100km east of Baku.

  • Production began in 1997 from the

Chirag section. It now also includes the Central, West and East Azeri, Deepwater Gunashli and West Chirag sections.

  • ACG production continues steadily ,

in 2017 produced more 29 million tonnes of oil. It also delivered SOCAR 2.75 billion cubic metres of gas for domestic use. About 10 bcm

  • f associated gas injected back to

reservoir for pressure support

8

slide-9
SLIDE 9

Shah Deniz Gas to European market

  • 16 bcm gas from SD 2
  • 26 subsea wells, 14 wells drilled
  • 4 subsea wells on production with

total 8 mln m3 per day

  • First gas to Turkey 30 June 2018

28.8% 10%

AzSD

19% 15.5% 10% 10% 6.7%

slide-10
SLIDE 10

Didscovered and being prepared for development 1. Absheron 2. Umid 3. ACG “Deep Gas” 4. Karabakh

Oil and Gas Prospects in Azerbaijan

  • 8

Blocks contracted for exploration (3D seismic) 1. Ashrafi-Dan Ulduzu- Aypara 2. D-230 Prospects prepared for exploration drilling 1. Shahdeniz 3 2. Babek 3. Shafaq-Asiman 4. Nakhchivan 5. Zafar-Mashal 6. North Khali 7. Qarabatdaq 8. Bibiheybat East

10

66 leads requiring additional seismic:

  • 34 onshore
  • 32 offshore
slide-11
SLIDE 11

Miocene and Cretaceous Exploration Plays

11

slide-12
SLIDE 12

SOCAR- JOGMEC Collaboration

12

12

  • Since

1989, 31 geoscientists and reservoir engineers from SOCAR participated in 3 months Overseas Training Programs, JOGMEC’s Research and Training Center in Tokyo which were fully sponsored by JOGMEC.

  • MoC signed on 30th of

May 2018, during 25th International Caspian Oil and Gas Conference and Exibition in Baku which assumes collaboration in the areas of Geological and Geophysical Survey, Technical Corporation and Human Resources Development

slide-13
SLIDE 13

SOCAR-INPEX/ WASEDA Univ. Collaborations since 2014

INPEX organized Trainings for SOCAR specialists and BHOS students: 2014/2015 Discussion by on Training Programme in Baku 2016 Geo/Reservoir Modeling and Field Development concept Training in Japan – 3 months 4 Geol. /RE 2017 Geo/Reservoir Modeling and Field Development concept Training in Japan – 3 months 4 Geol. /RE 2017 EoR lecture at Baku Higher Oil School by Prof. Kurihara, Waseda Univ.- for 60 students 2018 EOR simulation and exercise training in Baku for by Prof. Kurihara, Waseda Univ. - 15 SOCAR Geol./RE 2019 Geo/Reservoir modeling and Field Development concept Training in Japan (planned) 13

2017, Waseda Univ. 2016, Waseda Univ. 2016, Waseda Univ. 2017, Higher Oil School , SOCAR. 2018, Baku

slide-14
SLIDE 14

Corporation between SOCAR and ITOCHU

14

Pirallahi field

  • SOCAR together with ITOCHU is investigating the possibility of EOR on the Pirallahi oil field. For that purposes SOCAR engineers

and geologists collaborate closely with ITOCHU specialists.

  • As a result geological model was constructed using ROXAR RMS software package and possible simulation strategies were

investigated by SOCAR and ITOCHU engineers.

  • To proper tuning of the simulation models SCAL and PVT test results are required. Until now cores were taken from the well. PVT

sample will be taken from the same well after starting the production.

  • After accomplishing EOR simulation studies by using SCAL and PVT data, the economics of the optimized EOR jobs must be

calculated and as a result most suitable EOR method will be selected.

EOR/IOR Joint study in Pirallahi field started on April 2017

slide-15
SLIDE 15

Diqqətinizə görə təşəkkür edirəm!

Thank you for your attention!

ご清聴ありがとうございました