University of Rhode Island Capital Projects Presentation to the Faculty Senate May 7, 2020 Construction Summer 2020 2 List of Projects 1. Beaupre Center Fire damage restoration Rodent Behavioral Analysis Lab 2. Avedisian Hall


slide-1
SLIDE 1

University of Rhode Island

Capital Projects

Presentation to the

Faculty Senate

May 7, 2020

slide-2
SLIDE 2

Construction Summer 2020

2

slide-3
SLIDE 3

List of Projects

1. Beaupre Center

  • Fire damage restoration
  • Rodent Behavioral Analysis Lab

2. Avedisian Hall

  • Cage washer installation
  • GMP restoration

3. New Fuel Depot 4. Dining Services fire alarm & sprinkler 5. Upper College Road Advanced construction sewer and water project 6. Ranger Hall (advanced construction asbestos abatement) 7. Bressler, Butterfield, and Browning Hall boiler replacements (HRL) 8. Barlow and Weldin roof replacement 9. Fraternity Circle

  • 10. Keaney Golf Facility
  • 11. Athletics AV/fiber cable project
  • 12. Chafee Auditorium renovations
  • 13. Well Pumphouse exterior repairs

3

slide-4
SLIDE 4

1 4 10

Major Construction Projects - 2020

1) New Fuel Depot 2) Dining Services Fire Alarm & Sprinkler 3) Beaupre

  • Fire Damage Restoration
  • Rodent Behavioral Analysis Lab

4) Avedisian Hall

  • Cage Washer installation
  • GMP restoration

5) Upper College Road (advanced construction sewer project) 6) Ranger Hall (advanced construction asbestos abatement) 7) Bressler, Butterfield, and Browning Hall boiler replacements 8) Barlow and Weldin roof replacement 9) Fraternity Circle (Phase 1 and 2) 10) Golf Facility 11) Athletics AV/fiber cable project 12) Chafee auditorium renovations 13) Well 4 Pumphouse Exterior repairs

2 13 6 3 7 8 9 5 11 12

4

slide-5
SLIDE 5

Projects In Design

5

slide-6
SLIDE 6

Narragansett Bay Campus Phase 1 Renewal Pier and Campus

6

slide-7
SLIDE 7

Narragansett Bay Campus Pier Improvements

7

slide-8
SLIDE 8

Pier Project

8

slide-9
SLIDE 9

Pier Project

9

slide-10
SLIDE 10

Narragansett Bay Campus Campus Renewal

10

slide-11
SLIDE 11

NBC Phase 1 Campus Renewal

NBC Phase 1 – Campus Renewal Scope

Design and Construction:

  • Ocean Technology Building (Robotics)
  • Marine Logistics Support Building (support for new vessel)
  • New Campus Infrastructure and Parking

Initial Design:

  • NBC Research Building (Horn Lab Replacement)
  • Ocean Engineering (Education, Research, & Wave Tanks)

11

slide-12
SLIDE 12

Ranger Hall – Phase 2 Harrington School of Communication and Media

12

slide-13
SLIDE 13

Ranger Hall PH2 – Harrington School of Communication and Media

13

slide-14
SLIDE 14

Third Floor Second Floor Fourth Floor

Ranger Hall PH2 – Harrington School of Communication and Media

14

slide-15
SLIDE 15

HOLD FOR RENDERING

Ranger Hall PH2 – Harrington School of Communication and Media

15

slide-16
SLIDE 16

Health & Counseling Center

16

slide-17
SLIDE 17

Health Services – Existing Location – Potter Building

17

slide-18
SLIDE 18

Counseling Center – Existing Location – Roosevelt Hall

18

slide-19
SLIDE 19

Health & Counseling

Siting:

Health & Counseling Center

19

slide-20
SLIDE 20

Health & Counseling

Selected Site: Site Plan from Advanced Planning Study – Not Current Design 20

slide-21
SLIDE 21

Health & Counseling

Massing: Massing Model from Advanced Planning Study – Not Current Design 21

slide-22
SLIDE 22

Upper College Road

22

slide-23
SLIDE 23

Upper College Road – Route 138 to Flagg Road

23

slide-24
SLIDE 24

Preferred Typical Section

Upper College Road – Route 138 to Flagg Road

24

slide-25
SLIDE 25

Future Highlighted Projects

25

slide-26
SLIDE 26

Fine Arts

26

slide-27
SLIDE 27

Fine Arts Center PH1A

Stabilization of Pods to Remain – Wrapping up in June 2020

Fine Arts Center

27

slide-28
SLIDE 28

Fine Arts Center

Fine Arts Center PH1B

Demolish 5 pods & build new building – Design starting September 2020

28

slide-29
SLIDE 29

Fine Arts Center

29

slide-30
SLIDE 30

Memorial Union

30

slide-31
SLIDE 31

Memorial Union

31

slide-32
SLIDE 32

Memorial Union

Site Plan: 32

slide-33
SLIDE 33

Memorial Union

Renderings: 33

slide-34
SLIDE 34

University Inn

34

slide-35
SLIDE 35

University Inn

35

slide-36
SLIDE 36

RIPTA Hub

36

slide-37
SLIDE 37

RIPTA Hub – Plains Road Lot

Hub Location

37

slide-38
SLIDE 38

RIPTA Hub – Plains Road Lot

Conceptual design 38

slide-39
SLIDE 39

RIPTA Hub – Plains Road Lot

Conceptual design 39

slide-40
SLIDE 40

Agricultural Innovation Center

40

slide-41
SLIDE 41

Agricultural Innovation Center

Agricultural Innovation Center 41

slide-42
SLIDE 42

Agricultural Innovation Center

42