SLIDE 16 21/08/2013 16
Second Negative Pressure test
BP Confidential: Horizon Investigation Update 32
1400 PSI PSI
Shoe – 18,304’ FC – 18,115’ TOC – 17,260’ Shoe – 17,168’
Cement Mud Spacer Seawater Influx Cement Mud Spacer Seawater Influx
Sea Floor Choke Boost BOP Kill
Description of Event - Negative Pressure Test
April 20th
- Negative test designed to verify integrity of seal
assembly, casing, and shoe track in an underbalanced
- condition. This simulates conditions for T&A and rig
demobilization.
- 12:00 – 15:04 - Reviewed displacement procedure
and commenced preparation for negative test.
- 15:04 – 15:56 – Displaced mud with sea water to
underbalance the well.
- 15:56 – 16:53 – Spacer inadvertently placed across
the BOP due to leaking annular.
- 16:53 – 17:52 – Test started by monitoring pressure
- n drill pipe.
- 17:52 – 19:55 – Negative pressure test procedure
switched to monitor pressure on kill line. – No pressure and no flow observed on the kill line – 1400 psi observed on the drill pipe
- 19:55 – Test was concluded to be successful.
Seawater Drill pipe Closed Annular BOP Viscous Spacer Primary reservoir sands
12.6ppg 13.1ppg 14.0ppg 12.6ppg 12.6ppg
14.17ppg SOBM