towers of key biscayne window replacement project
play

TOWERS OF KEY BISCAYNE WINDOW REPLACEMENT PROJECT Erdozain - PDF document

TOWERS OF KEY BISCAYNE WINDOW REPLACEMENT PROJECT Erdozain Consulting Engineers, Inc. Jack Erdozain, P.E. SPECIFICATIONS The specifications provide standards for performance of the windows, installation and serve as a basis to obtain bids


  1. TOWERS OF KEY BISCAYNE WINDOW REPLACEMENT PROJECT Erdozain Consulting Engineers, Inc. Jack Erdozain, P.E.

  2. SPECIFICATIONS The specifications provide standards for performance of the windows, installation and serve as a basis to obtain bids from qualified contractors. PERFORMANCE: Meet the requirements of the 2014 Florida Building Code Meet hurricane wind requirements in accordance with ASCE 7-10. All windows meet Zone 5 wind load requirements All windows meet large and small missile impact requirements Provide Low E energy saving glass Provide bronze tint to match existing sliding glass doors and meet the Turtle Code. WARRANTIES: • Window frames have a Kynar finish and provide a 10 year warranty on the finish. • Provide a 10 year warranty on the glass. • Provide a 5 year warranty on the window assembly • Provide a 5 year warranty on all other work including moisture intrusion.

  3. INSTALLATION Work is to be done mainly from the exterior of the building by swing stages. Prior to starting work at each unit, contractor will require access to the unit with security and protection barriers will be installed inside the unit to separate the work area from the living area. When the work is completed, the contractor with security will require access to remove the barriers. Existing windows and shutters will be removed. Contractor is to install the new window within the same day unless spalling is found. In all cases the opening is to be sealed if the opening cannot be sealed by the end of the day. Section of concrete floor (1” to 2”) will have to be cut back in order to accommodate the new windows. Trim piece will be installed to provide a transition. Drywall will be cut back to accommodate the new windows and refinished to window framing. Painting of drywall will not be included.

  4. WINDOWS UNIT WINDOWS - 4,316 EACH (2,158 PAIRS) (INCLUDES OCEAN ROOM WINDOWS) LOBBY WINDOWS - 25 FIXED GLASS WINDOWS (INTERMEDIATE HORIZONTAL MULLIONS TO BE REMOVED) CARD ROOM WINDOWS - 12 SINGLE HUNG WINDOWS POOL BATH WINDOWS - 3 SINGLE HUNG WINDOWS RECEIVING OFFICE - 3 SINGLE HUNG WINDOWS GUARD HOUSE WINDOWS - 5 FIXED GLASS WINDOWS RESTAURANT WINDOWS - 16 FIXED GLASS WINDOWS 2 GLASS DOORS

  5. WINDOW MANUFACTURERS 1. CGI 2. WINDOOR 3. INNOVATIVE WINDOW CONCEPTS 4. RC HOME SHOWCASE The window manufacturers noted above had a product approved windows which met the criteria set forth in the specifications. We visited these window manufacturing plants to verify their quality control and capacity to provide the windows for this project.

  6. BIDDERS Specifications were sent to Contractors and a pre-bid meeting was held so the bidders could walk through the property and ask any questions they may have regarding the project.

  7. ORIGINAL BIDS TOWERS OF KEY BISCAYNE CONTRACTOR BIDS 7/22/2015 CONTRACTORS WINDOW MFR ITEM BENGOA COMPLETE CTC FL. LEMARK STRUCTURAL CGI BID $13,120,259.00 NO BID $11,286,311.80 $10,045,957.00 $14,755,600.00 BOND $500,000.00 $338,589.35 $196,180.00 $295,000.00 TOTAL $13,620,259.00 $11,624,901.15 $10,242,137.00 $15,050,600.00 TIME 520 1095 520 854 WINDOOR BID $16,549,869.70 $8,823,358.10 $12,851,021.54 $11,566,536.00 $16,662,070.00 BOND $600,000.00 $158,820.44 $385,530.65 $226,795.00 $334,700.00 TOTAL $17,149,869.70 $8,982,178.54 $13,236,552.19 $11,793,331.00 $16,996,770.00 TIME 520 714 1095 520 854 IWC BID $14,368,144.33 $9,463,621.25 $9,330,974.12 NO BID NO BID BOND $550,000.00 $170,345.18 $279,929.22 TOTAL $14,918,144.33 $9,633,966.43 $9,610,903.34 TIME 520 714 1095 RC HOME BID $11,324,726.00 $8,814,850.69 $8,450,711.68 NO BID $10,923,310.00 BOND $500,000.00 $158,667.31 $253,521.35 $221,220.00 TOTAL $11,824,726.00 $8,973,518.00 $8,704,233.03 $11,144,530.00 TIME 520 714 1095 854 ALTERNATE CGI BID NO BID NO BID NO BID $9,721,511.00 NO BID BOND $190,618.00 TOTAL $9,912,129.00 TIME 520 ALTERNATE WIN BID NO BID $8,254,269.28 NO BID NO BID NO BID BOND $148,576.84 TOTAL $8,402,846.12 TIME 714 ALTERNATE IWC BID NO BID NO BID $9,566,992.49 NO BID NO BID BOND $287,009.77 TOTAL $9,854,002.26 TIME 1095 ALTERNATE RC BID NO BID NO BID NO BID NO BID BOND TOTAL TIME TOWERS OF KEY BISCAYNE CONTRACTOR BIDS (CONT) 7/17/2015 UNIT PRICING CONTRACTORS ITEM BENGOA COMPLETE CTC FL. LEMARK STRUCTURAL SLAB EDGE SPALL (per cu. ft.). $265.00 $350.00 $310.00 $95.00 $300.00 CONCRETE SPALLS (per cu. ft.) $265.00 $350.00 $300.00 $250.00 $200.00 DELAMINATED STUCCO (per sq. ft.) $16.00 $18.00 $16.00 $16.00 $25.00 OPTIONS WINDOW MFR CGI Type A - 1 pr. $5,282.08 $4,447.54 $4,003.00 $6,500.00 A1 Option $26,149.93 $22,071.86 $19,865.00 $32,260.00 D Option $20,328.04 $17,157.12 $15,442.00 $25,080.00 WINDOOR Type A - 1 pr. $6,912.78 $3,938.06 $5,105.55 $4,595.00 $7,400.00 A1 Option $32,503.00 $17,479.21 $24,733.04 $22,260.00 $35,820.00 D Option $25,449.00 $15,227.04 $18,364.65 $17,428.00 $28,050.00 IWC Type A - 1 pr. $5,890.26 $4,218.11 $3,208.56 A1 Option $35,726.00 $21,293.99 D Option $28,370.00 $19,341.82 RC HOME Type A - 1 pr. $4,421.79 $3,932.28 $3,256.83 $7,725.00 A1 Option $25,618.44 $20,868.00 $18,868.34 $28,550.00 D Option $18,224.80 $15,423.00 $13,423.80 $20,320.00 ALTERNATE CGI Type A - 1 pr. $3,798.00 A1 Option $19,865.00 D Option $15,442.00 WINDOOR Type A - 1 pr. $3,658.50 A1 Option $21,352.68 D Option $16,960.05

  8. FINAL BIDS TOWERS OF KEY BISCAYNE CONTRACTOR BIDS 8/20/2015 CONTRACTORS WINDOW MFR ITEM COMPLETE CTC WINDOOR BID $8,773,358.10 $12,761,021.54 BOND $157,920.44 $382,830.65 TOTAL $8,931,278.54 $13,143,852.19 TIME 548 548 RC HOME BID $8,814,850.69 $8,360,711.68 BOND $158,667.31 $250,821.35 TOTAL $8,973,518.00 $8,611,533.03 TIME 548 548 UNIT PRICING ITEM COMPLETE CTC SLAB EDGE SPALL (per cu. ft.). $300.00 $310.00 CONCRETE SPALLS (per cu. ft.) $300.00 $300.00 DELAMINATED STUCCO (per sq. ft.) $16.00 $16.00 OPTIONS WINDOW MFR WINDOOR Type A - 1 pr. $3,914.83 $5,105.55 A1 Option $17,479.21 $24,733.04 D Option $15,227.04 $18,364.65 RC HOME Type A - 1 pr. $3,932.28 $3,256.83 A1 Option $20,868.00 $18,868.34 D Option $15,423.00 $13,423.80 Contractor Finalists Complete Aluminum Coast To Coast Manufacturer Finalists RC Home Showcase Windoor

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend