Titan Torque Services Titan Torque Services Limited Limited - - PowerPoint PPT Presentation

titan torque services titan torque services limited
SMART_READER_LITE
LIVE PREVIEW

Titan Torque Services Titan Torque Services Limited Limited - - PowerPoint PPT Presentation

Titan Torque Services Titan Torque Services Limited Limited Striving to provide a safer Striving to provide a safer working environment working environment Presented By: Keith Gaskin Presented By: Keith Gaskin


slide-1
SLIDE 1

www.titantorque.co.uk www.titantorque.co.uk

Titan Torque Services Titan Torque Services Limited Limited

“ “Striving to provide a safer Striving to provide a safer working environment working environment” ”

Presented By: Keith Gaskin Presented By: Keith Gaskin

slide-2
SLIDE 2

www.titantorque.co.uk www.titantorque.co.uk

Statistical Information Statistical Information

On average to drill a typical well in the UK a On average to drill a typical well in the UK a Rig will require the following: Rig will require the following:

 

6 Drill Bit Runs 6 Drill Bit Runs

 

24 Drill String Components made up to the 24 Drill String Components made up to the bottom section of the BHA per Well bottom section of the BHA per Well

Smith Bits Data Base 16/06/ Smith Bits Data Base 16/06/09 09

slide-3
SLIDE 3

www.titantorque.co.uk www.titantorque.co.uk

Statistical Information Statistical Information

In 2008 UK Drilled 315 Wells (DTI) In 2008 UK Drilled 315 Wells (DTI) This Equates to: This Equates to:

 

15,120 Lifts from the deck to the rig floor 15,120 Lifts from the deck to the rig floor

  • r from rig floor to deck (minimum)
  • r from rig floor to deck (minimum)

 

3,780 Bit Make ups or break outs using 3,780 Bit Make ups or break outs using manual rig tongs + associated manual manual rig tongs + associated manual handling equipment (minimum) handling equipment (minimum)

slide-4
SLIDE 4

www.titantorque.co.uk www.titantorque.co.uk

Typical Individual Lifts Typical Individual Lifts

Drill Bit Dog Sub Motor/RSS Stabiliser Weight: 25 -750 10 – 120 1,000 – 4,000 100 -1 ,500 (kg) Length: 0.5 – 1 0.5 – 1 6 – 10 1.5 - 2 (m)

slide-5
SLIDE 5

www.titantorque.co.uk www.titantorque.co.uk

Combined Pre Combined Pre-

  • made BHA

made BHA Lifts Lifts

Complete BHA Weight: 6,370KG (worst case) Length: 14m Pre Torqued Certified make up torques

slide-6
SLIDE 6

www.titantorque.co.uk www.titantorque.co.uk

Titan Drill Bit Protector Titan Drill Bit Protector

  • Polyurethane/Plastic outer shell
  • Foam inner
  • Robust hinge system
  • Quick connect locking mechanism
  • Safety snare

The Titan Protector (Patent Pending) is a unique product designed to safely and simply prevent damage to the drill bit whilst made up to a the drilling BHA while in transit offshore and back onshore. Designed to be compatible with:

  • RSS tools
  • Motors
  • Turbines
  • Dumb iron
slide-7
SLIDE 7

www.titantorque.co.uk www.titantorque.co.uk

Combined Pre Combined Pre-

  • made BHA

made BHA Lifts Lifts

One Controlled Lift Slings Positioned between larger OD items Less crane usage Quicker saving rig time

slide-8
SLIDE 8

www.titantorque.co.uk www.titantorque.co.uk

Eliminate Manual Eliminate Manual Rig Tongs Rig Tongs

slide-9
SLIDE 9

www.titantorque.co.uk www.titantorque.co.uk

The Way Forward The Way Forward

If in 2010, UK Drills 315 Wells and we use this If in 2010, UK Drills 315 Wells and we use this solution solution This will equate to: This will equate to:

 

3,780 Lifts from the deck to the rig floor or from 3,780 Lifts from the deck to the rig floor or from rig floor to deck rig floor to deck

75% reduction in lifts 75% reduction in lifts

 

0 Bit Make ups or break outs using rig tongs + 0 Bit Make ups or break outs using rig tongs + associated manual handling equipment associated manual handling equipment

100% Reduction in manual rig tongs 100% Reduction in manual rig tongs

slide-10
SLIDE 10

www.titantorque.co.uk www.titantorque.co.uk

7 P’s to Safer Drilling

  • Plan in advance the BHA’s
  • Pre – make the BHA’s
  • Protect the bit
  • Pick up the BHA’s safely
  • Prevent unnecessary manual handling or use of manual equipment
  • Perform
  • Provide a safer working environment
slide-11
SLIDE 11

www.titantorque.co.uk www.titantorque.co.uk

Summary Summary

Safety Driven solution that provides a cost Safety Driven solution that provides a cost effective benefit effective benefit

slide-12
SLIDE 12

www.titantorque.co.uk www.titantorque.co.uk

Questions Questions