the problem
play

The Problem In the early 2000s it was determined that the wells at - PDF document

10/22/2013 The Problem In the early 2000s it was determined that the wells at the Coleville School site exceed Californias MCL for uranium. 1 10/22/2013 Solutions ? Since that time various attempts were made to mitigate the


  1. 10/22/2013 The Problem  In the early 2000’s it was determined that the wells at the Coleville School site exceed California’s MCL for uranium. 1

  2. 10/22/2013 Solutions ?  Since that time various attempts were made to mitigate the problem. Point of use, bottled water etc. None of these partial solutions would satisfy the California Department of Public Health regulations.  No one at the District to pursue the correct course of action The Maze to a Solution  Engineers  Architects  Technical Report  Geo Technical Report  CEQA  State Approvals (CDPH, DSA)  Meetings, Meetings and more Meetings  Grants (writing, contracts, invoice, inspections)  Bids  Labor Compliance  Contractors  Lots of Advil 2

  3. 10/22/2013 The Result ! Electrical & Control Systems 3

  4. 10/22/2013 Ion Exchange Unit Delivery Pumps 4

  5. 10/22/2013 Irrigation Storage Tanks 5

  6. 10/22/2013 Fresh Clean Water “0” Uranium 6

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.