THE NEW DEFINITION OF UNLINKED TRACKING MARKET LEADER IN DESERT - - PDF document

the new definition of unlinked tracking market leader in
SMART_READER_LITE
LIVE PREVIEW

THE NEW DEFINITION OF UNLINKED TRACKING MARKET LEADER IN DESERT - - PDF document

THE NEW DEFINITION OF UNLINKED TRACKING MARKET LEADER IN DESERT CONDITIONS ACHIEVE THE BEST LCOE. Solar power plant projects today have to face competition and market laws more than ever before. The benchmark of our industry is therefore


slide-1
SLIDE 1

MARKET LEADER IN DESERT CONDITIONS THE NEW DEFINITION OF UNLINKED TRACKING

slide-2
SLIDE 2

„Solar power plant projects today have to face competition and market laws more than ever

  • before. The benchmark of our industry is therefore "LCOE". Reducing investment costs while

increasing efficiency is a major challenge. For 10 years, IDEEMATEC has made a substantial contribution to continuously reducing BOS costs through intelligent, scalable and adaptable systems while ensuring the highest possible availability and lifetime of our systems.“ Mario Eckl, CEO

ACHIEVE THE BEST LCOE.

11

CERTIFIED FACILITIES

+ 10 YEARS

EXPERIENCE IN TRACKERS

+ 750 MW

TRACKERS UNDER OPERATION

99.5%

PROVEN SYSTEM UPTIME AVAILABILITY

80,000 t

PRODUCTION CAPACITY

50

INTERNATIONAL PATENTS

EUROPE 340 MW MIDDLE EAST NORTH AFRICA 515 MW NORTH AMERICA AND MEXICO 170 MW SOUTH AMERICA 53 MW APAC 75 MW

Certified audited branches Branch offices/sales offices Local branch/team

slide-3
SLIDE 3

“The perfect integration of system Hardware, detailed engineering and professional project management is the key to long-term profitability Our comprehensive service package offers insight into planning and calculations, during all project phases. This adds significant value to EPC providers – during bidding and all project phases.” Thomas Art, CTO

FULL SERVICE ACROSS ALL PROJECT PHASES.

OUR KNOW-HOW ADDS VALUE TO YOUR PROJECT.

QUICK INSTALLATION DUE DILIGENCE REMOTE COMMISSIONING O&M MONITORING 3D SOFTWARE

ENGINEERING DESIGN SUPPL Y CHAIN LOGISTIC EXECUTION

Concept development | Up-front planning Detailed design | Layout optimization Adaptive backtracking 3D planning I Construction plans I Site survey Soil investigations | Test ramming | Pull-out-tests Certified quality production I DIN ISO 9001 Production plants in 11 countries 35 MW capacity per week Just in time delivery I Short transportation distances I Short delivery time I In-house logistics | Optimally adjusted to needs

  • n construction site
slide-4
SLIDE 4

LEADING TECHNOLOGY COMBINED WITH SMART SERVICES.

Your advantage: An extremely powerful tracking system combined with comprehensive services ranging from planning to commissioning and operation.

JORDAN, QUWEIRA, 100 MW JORDAN, MDA, 77 MW JORDAN, MAFRAQ, 57 MW “IDEEMATEC tracking systems offer globally operating EPCs above-average flexibility during the design, construction, and maintenance phases. IDEEMATEC´s intelligent solutions and scalable tracker systems based on more than10 years of implementation experience can be optimally adapted to different site situations – whether under desert conditions, high wind and snow loads, hilly terrain. The universal use of our tracking system minimizes the risks during the construction phase” Georg Urban, Vice President Sales

slide-5
SLIDE 5

WEAR-FREE

The load decoupled drive unit operates

  • n a frictionless basis.

LOW-MAINTENANCE

The low number

  • f drive units means

minimum maintenance.

OPERATIVE BENEFITS FLEXIBLE APPLICATION

Crystalline, thin film, 2 rows in portrait, 4 and 7 rows in landscape, 1000 V / 1500 V.

SCALEABLE DESIGN

With no driving rods between the rows, the rows can be planned

  • n uneven terrain.

PLANNING CERTAINITY

Flexible planning without the need for earthworks reduces costs and risks.

EFFECTIVE CONSTRUCTION

Maximum stability and sturdiness with the minimum

  • f materials.

BARRIER-FREE

Unhindered access and passage between rows makes cleaning easier.

AVAILABILITY BOS PERFORMANCE LIFETIME LCOE

60% less drives and foundations Slopes up to 36% Installed output per drive unit up to 120 kWp Proven system uptime availability of 99.5% Load Decoupeling

  • f the drive by 95%

TECHNOLOGICAL BENEFITS

slide-6
SLIDE 6

IDEEMATEC Inc. 1910 Abbott Street Suite 200 Charlotte, North Carolina 28203, USA Phone +1 980 237 7925 info@ideematec.com IDEEMATEC Deutschland GmbH Neusling 9c D-94574 Wallerfing, Germany

  • Tel. +49 (0)9936–95 10 90–0

Fax +49 (0)9936–95 10 90–60 info@ideematec.de