Technical Direct or Co Comp mpany Ob any Object ectives ves - - PowerPoint PPT Presentation

technical direct or
SMART_READER_LITE
LIVE PREVIEW

Technical Direct or Co Comp mpany Ob any Object ectives ves - - PowerPoint PPT Presentation

Annual General Meeting Presentation Perth WA 15 November 2013 Bruce Kay Technical Direct or Co Comp mpany Ob any Object ectives ves Become a cash producing, dividend paying gold producer in 2-3 years Considerably enhance value


slide-1
SLIDE 1

Annual General Meeting Presentation Perth WA 15 November 2013 Bruce Kay Technical Direct or

slide-2
SLIDE 2

Slide 2

Co Comp mpany Ob any Object ectives ves

 Become a cash producing, dividend paying

gold producer in 2-3 years

 Considerably enhance value by successful

exploration

 Acquire assets with strong upside potential:

the NQM and Normandy experience

Early cash flow is the priority

slide-3
SLIDE 3

Slide 3

Four ur Eag agles es: 2013 2013 Summar ummary

 Hayanmi Gold Prospect extended to 2.6 kms long  Three prospects now defined with high grades

(Hayanmi, Discovery and Boyd’s Dam)

 Large gold footprint 6 kms by 2.5 kms with

potential to extend

 Gold is finely divided with good assay

repeatability 2014 Objective: Angled drilling to define high grade gold deposit at shallow depth

slide-4
SLIDE 4

Slide 4

Virgi gin G Gold D Disc scovery with Exc Excellent Infra rastru tructu ture

 Good road and rail access, power and water  Other gold plants available in district for

early cash flow

 Freehold land with no native title  Local workforce, no FIFO

Potential for both shallow open pit gold and large gold discoveries

slide-5
SLIDE 5

Slide 5

Non Non-Gold

  • ld P

Proj rojects

Four Eagles Gold Project Minnie Springs

  • $1m of molybdenum exploration
  • Low grade molybdenum resource defined
  • Untested tungsten prospect (0.5 – 1% WO3)
  • Shallow uranium mineralisation (500ppm U)

Everton

  • Historic Molybdenum production

21,000 tonnes @ 1.4%MoS2

  • Scattered molybdenum

mineralisation in quarry

  • Farm-out potential
slide-6
SLIDE 6

Slide 6

Bend Bendigo / / Bal Ballar arat at Gold

  • ld Z

Zon

  • nes

DPI predicts 32 Mozs 60 Mozs Production

W h i t e l a w F a u l t A v

  • c

a F a u l t B a m b r a F a u l t Mount William Fault G

  • v

e r n

  • r

Fault System

  • N. S. W.

V I C T O R I A Four Eagles Gold Project

Bendigo

NORTH

kilometres 100

Bendigo - Ballarat

Gold Zone

Total Gold Production

38º 36º 143º 145º

Ballarat

Stawell MELBOURNE

Concealed by Murray Basin Sediments

> 10 million ounces > 1 million ounces > 300,000 ounces

  

60 million ounces produced 2 Deposits > 10 million ounces 5 deposits > 1 million ounces

DPI pr I predic dicts s 32 millio illion ounces o s of go gold ld und under er co cover er

(so source: Vic ictoria ian D Department o

  • f Prim

imary I Indust stries, s, G Gold ld Un Undercover I Init itia iativ ive)

Historic rical Gol

  • ld

d Produ

  • duction Bendi

digo-Ballarat Region

slide-7
SLIDE 7

Slide 7

Bend Bendigo: : a w

world-class gold ta targ rget

BENDIGO URBAN AREA

H i s a t

  • ric

l P r d

  • u

c t i

  • n

Zo n e

Hustlers Line

1.6mt @17.6g/t Au (918,000oz)

Garden Gully Line

10.8mt @15.0g/t Au (5,203,000oz)

New Chum Line

7.9mt @15.1g/t Au (3,850,000oz)

Deborah Line

0.46mt @14.7g/t Au (217,000oz)

Sheepshead Line

2.3mt @11.6g/t Au (852,000oz)

Nell Gwynne Line Napoleon Line

NORTH

kilometres 2

Bendigo Goldfield

Historical Gold Production from Lines of Lodes

18 million ounces of reef gold

4 million ounces of alluvial gold

Includes possibly 7 million

  • unces in top 200 metres

Large footprint (8kms x 3kms)

slide-8
SLIDE 8

Slide 8

Nort North Bend Bendigo Gold

  • ld Belt

lt

 Major gold belt

emerging north of Bendigo

 Totally concealed by

Murray Basin sediments

 Whitelaw Fault

controls gold

 Catalyst has 25 kms of

strike length

230,000mE 250,000mE 270,000mE 290,000mE

Fosterville Goldfield Bendigo Goldfield

5,960,000mN 5,920,000mN 5,940,000mN 5,980,000mN

Fosterville Bendigo

EL4525 EL4525

Raywood Mitiamo Tandarra Project

Whitelaw Fault

Tandarra F

Four Eagles Gold Project

V I C T O R I A N S W

kilometres 20

NO R T H

EL5295

Echuca Rochester Lockington Sebastian

6,000,000mN

Pyramid

Catalyst / Providence JV Unity ELs Gold deposit/

  • ccurrence

Town / city Main Road Railway Limit of base- ment outcrop Lion Gold / Navarre Unity MLs Navarre Crocodile Gold Timpetra Exploration Licence Holding Companies

slide-9
SLIDE 9

Slide 9

Wha hat lies ies benea eneath h the w he whea heat f fiel elds?

0.4m @ 152.0g/t Au (FEDD008) 6.0m @ 82.7g/t Au (FE328) 1.0m @ 18.3g/t Au (FERC002) 3.0m @ 36.6g/t Au (FE415) 1.0m @ 17.5g/t Au (FEDD001) 3.0m @ 20.5g/t Au (FE592) 3.0m @ 9.1g/t Au (FE608)

slide-10
SLIDE 10

Slide 10

Fou Four r Eagle gles s Gold

  • ld Zones

nes

Bendigo Pyramid Road

kilometre 1 NO R T H

Bendigo Pyramid Road

Whitelaw Fault Projected Tandarra Fault

242,000mE 244,000mE 246,000mE 5,992,000mN 5,990,000mN 5,988,000mN

EAGLE 1 TARGET EAGLE 2 EAGLE 4 ZONE EAGLE 3 E 5 AGLE TARGET

343 380 328 D001

316 (3.85km north)

469 509 584 623 619 D008 D007 446 326 648 626 649

Drillhole Intersections (>0.7g/t Au)

FEDD001 3.7m @ 4.7g/t Au from 170m inc. 0.8m @ 17.5g/t Au from 173m FEDD007 0.4m @ 8.4g/t Au from 168m and 0.75m @ 15.3g/t Au from 170m FEDD008 0.4m @ 152g/t Au from 150m FERC002 2m @ 1.8g/t Au from 67m and 1m @ 18.3g/t Au from 127m FERC003 2m @ 6.2g/t Au from 49m FE326 1.5m @ 1.81g/t Au from 114m FE328 6m @ 82.7g/t Au from 123m FE343 3m @ 3.34g/t Au from 111m FE380 3m @ 9.71g/t Au from 120m FE399 3.0m @ 1.42g/t Au from 66m FE402 3.0m @ 0.8g/t Au from 90m FE415 6.0m @ 2.6g/t Au from 45m and 3.0m @ 36.6g/t Au from 57m FE469 3.0m @ 1.23g/t Au from 36m FE471 3.0m @ 5.96g/t Au from 75m and 3.0m @ 1.33g/t Au from 81m FE472 3.0m @ 1.2g/t Au from 45m and 3.0m @ 2.32g/t Au from 63m FE492 3.0m @ 1.2g/t Au from 75m FE509 3.0m @ 0.7g/t Au from 84m FE532 3.0m @ 2.1g/t Au from 96m FE535 3.0m @ 1.37g/t Au from 63m FE572A 3.0m @ 1.74g/t Au from 51m FE575 3.0m @ 4.9g/t Au from 66m FE578 3.0m @ 1.14g/t Au from 60m FE579 9.0m @ 2.33g/t Au from 48m and 3.0m @ 1.23g/t Au from 78m FE584 3.0m @ 0.88g/t Au from 117m FE591 3.0m @ 14.7g/t Au from 87m FE592 9.0m @ 7.9g/t Au from 87m incl. 3.0m @ 1.26g/t Au from 87m incl. 3.0m @ 20.5g/t Au from 90m and 3.0m @ 1.94g/t Au from 93m FE595 3.0m @ 2.33g/t Au from 126m FE606 3.0m @ 1.39g/t Au from 102m FE608 3.0m @ 9.1g/t Au from 108m FE619 3.0m @ 0.8g/t Au from 45m FE623 3.0m @ 0.83g/t Au from 33m FE626 1.5m @ 12.9g/t Au from 52.5m FE648 1.5m @ 1.0g/t Au from 82.5m FE649 4.5m @ 1.0g/t Au from 97.5m

Drillholes 0.1 to 0.2 g/t Au 0.2 to 0.5 g/t Au 0.5 to 1.0 g/t Au 1.0 to 5.0 g/t Au > 5.0 g/t Au Drillhole grades Au Zone As Zone

Discovery Boyd’s Dam Hayanmi

471 402 399 D005 595 608 492 592 591 R002 472 415 572A 579 578 R003 575

slide-11
SLIDE 11

Slide 11

Hayanmi ayanmi Tr Trend end

2 m 30m 4 m 5 m

C u n e e n s R

  • a

d N

  • r

t h B

  • u

n d a r y R

  • a

d Y a r r a w a l l a E a s t R

  • a

d

244,000mE 245,000mE 5,991,000mN 5,990,000mN 5,992,000mN

Hayanmi Prospect

Eagle 2 Zone Eagle 2 Zone

399 471 592 591 595 492 608 326 452 343 446 440 623 469 402 625 626 648 649

Hayanmi Cross Section

metres 500

NO R T H

Significant Drillhole Intersections (>0.5g/t Au)

Other Intersections FE326 1.5m @ 1.81g/t Au from 114m FE343 3.0m @ 3.43g/t Au from 111m FE446 3.0m @ 0.5g/t Au from 66m

Drillholes

LEGEND

0.1 to 0.2 g/t Au 0.2 to 0.5 g/t Au < 20 metres 20 - 30 metres 30 - 40 metres 40 - 50 metres > 50 metres 0.5 to 1.0 g/t Au 1.0 to 5.0 g/t Au > 5.0 g/t Au

Drillhole grades Depth to Basement

Au Zone

Eagle 3 Zone

Hayanmi Trend

FE399 3.0m @ 1.42g/t Au from 66m FE469 3.0m @ 1.23g/t Au from 36m FE471 3.0m @ 5.96g/t Au from 75m and 3.0m @ 1.33g/t Au from 81m FE492 3.0m @ 1.2g/t Au from 75m FE591 3.0m @ 14.7g/t Au from 87m and 3.0m @ 1.46g/t Au from 93m FE592 9.0m @ 7.9g/t Au from 87m

  • incl. 3.0m @ 1.26g/t Au from 87m
  • incl. 3.0m @ 20.5g/t Au from 90m

and 3.0m @ 1.94g/t Au from 93m FE595 3.0m @ 2.33g/t Au from 126m FE608 3.0m @ 9.1g/t Au from 108m FE623 3.0m @ 0.83g/t Au from 33m FE626 1.5m @ 12.9g/t Au from 52.5m and 1.5m @ 0.7g/t Au from 82m and 1.5m @ 0.54g/t Au from 87m FE648 1.5m @ 0.8g/t Au from 64.5m and 1.5m @ 1.0g/t Au from 82.5m FE649 4.5m @ 1.0g/t Au from 97.5m

slide-12
SLIDE 12

Slide 12

Hayanmi ayanmi Cross ross Section ion

Potential Ore Zone

3m @ 1.3g/t Au 3m @ 20.5g/t Au 3m @ 1.9g/t Au FE593 3m @ 14.7g/t Au 3m @ 1.0g/t Au 3m @ 1.5g/t Au FE592 D 6 FE591 FE590

125m EOH 117m EOH 134m EOH 108m EOH 99m EOH

Proposed RC/Diamond Drillholes

Hayanmi Cross Section

5990140mN

Clay - Shepparton Fm. Sand Silt Carbonaceous Clay Saprolite Zone Potential Gold Zone Basement Castlemaine Gp.

244700mE 244800mE 244900mE

  • 50m

0m 50m

Metres

50

slide-13
SLIDE 13

Slide 13

Hayanmi ayanmi Lon

  • ngit

gitudin inal S l Section ion

MURRAY BASIN SEDIMENTS

FE469

1.5m @ 12.9g/t Au 3m @ 0.8g/t Au

FE649 FE626 FE402 FE648 FE623

1.5m @ 0.8g/t Au 3m @ 1.23g/t Au 4.5m @ 1.0g/t Au 1.5m @ 1.0g/t Au

FE471 FE608 FE599 FE492 FE399 FE592 FE595 FE591

3m @ 2.3g/t Au 3m @ 9.1g/t Au 3m @ 1.2g/t Au 3m @ 0.8g/t Au 9m @ 7.9g/t Au 3m @ 14.7g/t Au 3m @ 1.3g/t Au 3m @ 6.0g/t Au 3m @ 1.42g/t Au 3m @ 0.83g/t Au

2.6 Kilometres

Longitudinal Projection of Hayanmi Structure

5,990,000mN 5,991,000mN 5,992,000mN 50m 50m

Metres

500

100m 150m 200m 250m 300m

ZONE OF GOLD POTENTIAL FOR DRILL TESTING

200 metres

(Vertical exaggeration approx. 6:1)

100m 200m

Longitudinal Projection View looking WEST

slide-14
SLIDE 14

Slide 14

Bo Boyd yd’s ’s Dam Pr am Prospect ect

Cuneens Road

metres 200 NO R T H

Bendigo Pyramid Road

245,000mE 245,500mE 5,990,000mN 5,989,500mN 5,989,000mN

EAGLE 4 ZONE

Boyd’s Dam Prospect

535 549A 545 540 541 R002 472 415 537 533 532 571 572A 575 576 579 578 580 416 R003 D003

Boyd’s Dam Cross Section

Drillhole Intersections (>0.5g/t Au)

Drillholes 0.1 to 0.2 g/t Au 0.2 to 0.5 g/t Au 0.5 to 1.0 g/t Au 1.0 to 5.0 g/t Au > 5.0 g/t Au Drillhole grades Au Zone As Zone

FEDD003 3m @ 0.92g/t Au from 56m FERC002 2m @ 1.8g/t Au from 67m and 1m @ 18.3g/t Au from 127m FERC003 2m @ 6.2g/t Au from 49m FE415 6.0m @ 2.6g/t Au from 45m and 3.0m @ 36.6g/t Au from 57m FE472 3.0m @ 1.2g/t Au from 45m and 3.0m @ 1.2g/t Au from 51m and 3.0m @ 2.32g/t Au from 63m FE532 3.0m @ 0.99g/t Au from 69m and 3.0m @ 2.1g/t Au from 96m FE535 3.0m @ 1.37g/t Au from 63m FE537 6.0m @ 0.8g/t Au from 63m FE541 3.0m @ 0.93g/t Au from 54m FE572A 9.0m @ 0.76g/t Au from 48m inc 3.0m @ 1.74g/t Au from 51m FE575 3.0m @ 4.9g/t Au from 66m FE576 3.0m @ 0.65g/t Au from 78m FE578 3.0m @ 1.14g/t Au from 60m FE579 33.0m @ 0.96g/t Au from 48m inc 9.0m @ 2.33g/t Au from 48m and 3.0m @ 1.23g/t Au from 78m

slide-15
SLIDE 15

Slide 15

Boy

  • yd’s

s Dam Cross ross Section ion

Potential Ore Zone

FERC001 FE472 FE415 3m @ 1.3g/t Au 15m @ 8.4g/t Au FERC002 3m @ 1.0g/t Au 3m @ 1.3g/t Au 2m @ 1.8g/t Au 1m @ 0.55g/t Au 1m @ 18.3g/t Au abandoned 1m @ 0.6g/t Au FE542 FERC003 FE541 FE538 FERC002a FERC004 2m @ 6.2g/t Au

Boyd’s Dam Cross Section 5989369N

245500mE

  • 25m

0m

Metres

50 100m 25m 50m 75m 245450mE 245400mE

ZONE OF QUARTZ VEINS WITH GOLD MINERALISATION

245350mE

Clay - Shepparton Fm. Sand Torrumberry Clay Saprolite Zone Basement Castlemaine Gp

slide-16
SLIDE 16

Slide 16

Boy

  • yd’s

s Dam L Lon

  • ngit

gitudin inal l Section ion

MURRAY BASIN SEDIMENTS

FE580 FE572 FE537 FE532 FE575

3m @ 0.4g/t Au

FE471 FE545 FE415 FE549A FE572A FE578 FE579 RC2 RC3

33m @ 1.0g/t Au 1m @ 18.3g/t Au 3m @ 1.0g/t Au 3m @ 1.0g/t Au 2m @ 6.2g/t Au 3m @ 2.3g/t Au 15m @ 8.4g/t Au 3m @ 2.1g/t Au 3m @ 4.9g/t Au 3m @ 1.7g/t Au

700 metres

Longitudinal Projection of Boyd’s Dam

5,989,000mN 5,989,500mN 5,990,000mN 50m

Metres

250

100m 150m 200m 250m

ZONE OF GOLD POTENTIAL FOR DRILL TESTING

(Vertical exaggeration approx. 3:1)

100m 200m

Longitudinal Projection View looking WEST

slide-17
SLIDE 17

Slide 17

Disc iscov

  • very

ry Prosp rospect Cross ross Section ion

Eagle 3 Trend Eagle 2 Trend

356m

D007 D008 D002 D001

FE300 FE299 0.4m @ 8.4g/t Au 0.75m@15.3g/tAu FE328 FE298 FE329 FE297 FE330 FE296 FE331 6m @ 82.7g/t Au 3m @ 0.51g/t Au 3m @ 0.59g/t Au 0.7m @ 4.83g/t Au 0.8m @ 17.5g/t Au 0.4m @ 152g/t Au

Discovery Cross Section

5988925mN

Clay - Shepparton Fm. Sand Carbonaceous Clay Saprolite Zone Potential Gold Zone Shale Sandstone Quartz Veins / Shearing Basement Castlemaine Gp.

244000mE 244250mE 244500mE

  • 250m

0m

FOLD AXIS

215.5m EOH 257.1m EOH

TANDARRA F.

Metres

100

slide-18
SLIDE 18

Slide 18

Four ur Eag agles es Fine ne and and Co Coar arse e Go Gold

Process from Discovery (FE328), Hayanmi (FE471) and Boyd’s Dam (FE415)

slide-19
SLIDE 19

Slide 19

LeachW eachWELL Corre

  • rrela

lation ion G Gra raph

10 20 30 40

±2kg sample by LeachWELL (g/t Au) 10 20 30 40 50 30 gram sample by AAS (g/t Au)

R e g r e s s i

  • n

L i n e R e g r e s s i

  • n

L i n e

5 5

30 gram sample by AAS (g/t Au) See Inset

INSET

±2kg sample by LeachWELL (g/t Au) Hole Type Diamond hole Aircore hole

Correlation 2kg LeachWELL vs 30gm Aqua Regia/AAS

slide-20
SLIDE 20

Slide 20

Co Concep nceptual ual Mine Pl ne Plan an

slide-21
SLIDE 21

Slide 21

Fou Four r Eagle gles s 2013/14 D 2013/14 Drilling ng

EL5295 EL4525

Granite

Bendigo Pyramid Road

kilometres 2 NO R T H

B e n d i g

  • P

y r a m i d R

  • a

d

Whitelaw F a u l t

P r

  • j

e c t e d T a n d a r r a F a u l t

240,000mE 244,000mE 248,000mE 5,990,000mN 5,994,000mN 5,998,000mN

EAGLE 1 TARGET EAGLE 2 ZONE EAGLE 4 ZONE EAGLE 3 ZONE EAGLE 5 TARGET

EAGLE 1 EAGLE 2 EAGLE 3 EAGLE 4

2013 Aircore Drilling

See enlargement plan EAGLE 1 EAGLE 2 EAGLE 3 EAGLE 4

Reconnaissance Aircore in Shallow Basement Areas Aircore/RC Infill in Shallow Basement Areas

316 343 380 328 D001 316 469 509 584 623 619 D008 D007 446 326 648 626 649

471 402 399 D005 595 608 492 592 591 R002 472 415 572A 579 578 R003 575

Drillholes 0.1 to 0.2 g/t Au 0.2 to 0.5 g/t Au 0.5 to 1.0 g/t Au 1.0 to 5.0 g/t Au > 5.0 g/t Au Drillhole grades Au Zone As Zone Basement 0 – 30 metres depth Basement 30 – 50 metres depth Basement > 50 metres depth Shallow Basement target areas

slide-22
SLIDE 22

Slide 22

Drillin rilling M g Method

  • dology
  • logy

Potential Ore Zone

125m EOH 125m EOH

Reconnisance Aircore Infill Aircore Diamond / RC

Four Eagles Drilling Methodology

Clay - Shepparton Fm. Sand Silt Carbonaceous Clay Saprolite Zone Basement Castlemaine Gp.

244700mE 244800mE 244900mE

  • 150m
  • 200m
  • 100m
  • 50m

Metres

50

slide-23
SLIDE 23

Slide 23

2-3 Y Year Exp Exploration Progr gramme

 Recon Aircore Drilling 15,000m/$0.5M  Grid Follow up Aircore drilling

30,000m/$1.0M

 Angled RC Drilling 15,000m/$1.0M  Angled Diamond Drilling 5,000m/$1.5M  This would give about 50 Ore Cross Sections

Estimated Total Cost to JORC Resource: $5M

slide-24
SLIDE 24

Slide 24

Heads of Agreement

Initial Phase 

 $2,100,000 exploration spend by January 2014 to earn

50% interest in project. Completed June 2013 Future Farm-in

 $2,100,000 exploration spend to earn up to 75% interest in

project (assumes non-contribution by Providence at 60%)

 Catalyst gives Providence staged conditional shares and cash

at 60%, 70%, 75% and Feasibility (1.5 m CYL shares: $230,000)

 Providence Gold & Minerals 25% free carried until decision

to mine

 Providence can elect to take 2.5% royalty on mine project

Fou Four r Eagle gles s Far arm-in A n Agreement eement

slide-25
SLIDE 25

Slide 25

Cataly lyst st Capit ital S l Stru ructure re

Capital Structure (ASX: CYL)

 47,303,033 fully paid ordinary shares

– 1,000,000 unlisted 20 cent options expiring 30/06/2014 – 750,000 unlisted 30 cent options expiring 30/06/2015 – 350,000 unlisted Performance Rights

 Top 20 control approximately 70% of issued capital

Cash in hand

 A$0.9 million (at 30 Sept 2013)

Market Capitalisation

 A$14 million (at 30 cents per share)

slide-26
SLIDE 26

Slide 26

Directors

 Bruce Kay – Technical Director  Stephen Boston – Chairman  Robin Scrimgeour – Non-executive  Gary Schwab – Non-executive

Officers

 Frank Campagna – Company Secretary  John Arbuckle – Consultant

Corp

  • rpora
  • rate S

Stru ructure re

slide-27
SLIDE 27

Slide 27

Competent Person’s Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Bruce Kay, who is a Fellow of the Australasian Institute of Mining and Metallurgy and is a non-executive director of Catalyst Metals Limited. Mr Kay has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves’. Mr Kay consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Com

  • mpetent Person

rsons s Statement

slide-28
SLIDE 28

Slide 28

This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their

  • wn analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and
  • pinions contained in this presentation.

This presentation is for information purposes only. Neither this presentation nor the information in it constitutes an

  • ffer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.

This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdictions. Recipients should inform themselves of the restrictions that apply in their own

  • jurisdiction. A failure to do so may result in a violation of securities laws in such a jurisdiction.

This presentation does not constitute investment advice and has been prepared without taking into account the recipient’s investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments.

To the fullest extent permitted by law, Catalyst and its officers, employees, agents and advisers do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts or other representations contained in this presentation. No responsibility for any errors or omissions from this presentation arising out of negligence or otherwise is accepted.

This presentation may include forward looking statements. Forward looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Catalyst. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward looking statements in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under any applicable law and the ASX Listing Rules, Catalyst does not undertake any obligation to update or revise any information or any of the forward looking statements in this presentation of any changes in events, conditions or circumstances on which any such forward looking statement is based.

Dis Disclaime laimer r an

and Forward

rward Lookin ing State tateme ments ts

slide-29
SLIDE 29

Annual General Meeting Presentation Perth WA 15 November 2013 Bruce Kay Technical Direct or