scott e bennett p e
play

Scott E. Bennett, P.E. Director Public Meeting Harrison November - PowerPoint PPT Presentation

Scott E. Bennett, P.E. Director Public Meeting Harrison November 3, 2020 The Ballot Question: Issue 1 Funding from current sales tax YES continues after June 2023 Funding from current sales tax NO terminates after June 2023 Revenue


  1. Scott E. Bennett, P.E. Director Public Meeting Harrison

  2. November 3, 2020 The Ballot Question: Issue 1 Funding from current sales tax YES continues after June 2023 Funding from current sales tax NO terminates after June 2023

  3. Revenue Trends Billions $7.0 $6.4 B General Revenue $6.0 Net Highway Revenue $5.0 $4.0 $3.0 $2.0 $1.0 B $1.0 $423 M $139 M $0.0 Fiscal Year Excludes County & City Aid funds | Excludes CAP funds

  4. Significant Loss Of Purchasing Power Item Description 1993 2015 Percent Change Average Tuition & Fees at Public College Tuition $1,908 $9,145 379% 4-year Universities Healthcare National Expenditure Per Capita $3,402 $9,523 180% House Median New Home Price $118,000 $292,000 147% Gas Per Gallon $1.08 $2.56 137% Beef Per Pound of Ground Beef $1.97 $4.38 122% Movie Ticket Average Ticket Price $4.14 $8.43 104% Bread Per Pound of White Bread $0.75 $1.48 98% Income National Median Household $31,241 $56,516 81% Stamp One First-Class Stamp $0.29 $0.49 51% Car Average New Car $16,871 $25,487 51% Federal Gas Tax Per Gallon $0.18 $0.18 0% Sources: Bureau of Labor Statistics, Centers for Medicare & Medicaid Services, College Board, Federal Reserve Bank of St. Louis, Oak Ridge National Laboratory, U.S. Census Bureau, U.S. Energy Information Agency, U.S. Postal Service

  5. Construction Costs Money Doesn’t Go As Far THEN NOW Using $10 million today, only In 1995, 200 miles of 54 miles of highway can be highway could be overlaid with $10 million. overlaid.

  6. Construction Costs Typical Cost Per Mile 4-Lane Interstate $ 10.4 Million 5-Lane Roadway $ 6.6 Million 2-Lane Roadway $ 3.4 Million Widen from 2- to 5-Lanes $ 4.7 Million

  7. The 10-Y ear Shortfall  $9.3 Billion in Needs  $4.5 Billion in Available Revenue  $4.8 Billion Shortfall

  8. • Highway Funding Working Group $ 400 Million • Arkansas State Legislative Audit $478 Million  $300 Million “An efficient transportation system is critical for Arkansas’ economy and the quality of life of the state’s residents.” – Governor Asa Hutchinson

  9. Act 416 of 2019 $ 95 Million (Immediate Funding dedicated to System Preservation) Issue 1 $205 Million (Funding for System Preservation plus Capital Projects beginning in SFY 2024) Total for State Highways $300 Million

  10. Benefits from Additional $300 Million Per Year Provide $8.2 Billion in Economic Activity over 10 Y ears Support 3,596 Jobs Each Y ear* Maintain Interstates in a State of Good Repair Increase Safety Improvements Implement a Second Connecting Arkansas Program (CAP-2) Repair or Replace Poor Condition and Posted Bridges over 10 Y ears Improve Approximately 7,000 Miles of Non-Interstate Highways over 10 Y ears *Source: prepared by the American Road & Transportation Builders Association (ARTBA), October 2018; data prorated for $300 million in additional annual revenue.

  11. If Issue 1 Passes Annual Revenue Expected to be Available in SFY 2024 $ 95 Million Act 416 of 2019 $ 205 Million Issue 1 Current Construction Program $ 440 Million Total $ 740 Million

  12. If Issue 1 Passes 10-Year Renew Arkansas Highways Program • Pavement Preservation $3.0 Billion • Bridge Improvements and Preservation $1.1 Billion • Interstate Maintenance $1.0 Billion • Safety Improvements $0.5 Billion • Capital and Congestion Relief (CAP-2) $1.8 Billion Total $7.4 Billion

  13. ears and Funded Through 2023 Projects Let In The Past Ten Y 9,000 Miles $9.9 Billion Projects Let in the Past Ten Years Remaining STIP Through 2023 Job Type Bridge Interchange Roadway New Location

  14. ears and Funded Through 2023 Projects Let In The Past Ten Y Projects Let in the Past Ten Years Remaining STIP Through 2023 Job Type Bridge Interchange Roadway New Location

  15. Projects Let In The Past Ten Y ears and Funded Through 2023 Harrison Regional Meeting Project Information Amount Category Projects Miles (Millions) Let in Past 10 Y ears 232 978 $ 1,418 Remaining STIP 136 665 $ 431 Through 2023 Totals 368 1,643 $ 1,849

  16. Draft Program of Pavement & Bridge Preservation Projects 2024-2033 Draft Program of Preservation Projects (Pavement & Bridges) Job Type Bridge Roadway

  17. Draft Program of Pavement & Bridge Preservation Projects 2024-2033 Draft Program of Preservation Projects (Pavement & Bridges) Job Type Bridge Roadway

  18. Draft Program of Pavement & Bridge Preservation Projects Harrison Regional Meeting Project Information Amount Category Projects Miles (Millions) Pavements 287 1,654 $ 763 Bridges 206 - $ 143 Totals 493 1,654 $ 906

  19. Second Connecting Arkansas Program Second Connecting Arkansas Program Job Type Bridge Interchange Roadway New Location

  20. Huntsville to Black Rock (Selected Sections) $100 Million Second Connecting Arkansas Program Cave City - North $50 Million Highways 65/65B Harrison (Selected Sections) $60 Million Walnut Ridge to Missouri State Line (Selected Sections) $180 Million Clinton to Harrison (Selected Sections) Jonesboro Area $90 Million TBD (Selected Sections) $50 Million Second Connecting Arkansas Program Job Type Bridge Interchange Roadway New Location

  21. Second Connecting Arkansas Program Potential Projects • Second Connecting Arkansas Program $ 3.0 Billion • Economic Development, Partnering $ 0.5 Billion & Local Congestion Relief • ROW Acquisition & Utility Relocation $ 0.1 Billion 20-Y ear Total $ 3.6 Billion

  22. New Highway Program Job Type Bridge Interchange Roadway New Location Projects Let Last 10 Years Remaining STIP Act 416 & State Surplus Revenue 2024-2033 Draft Program of Preservation Projects Second Connecting Arkansas Program

  23. New Highway Program Job Type Bridge Interchange Roadway New Location Projects Let Last 10 Years Remaining STIP Act 416 & State Surplus Revenue 2024-2033 Draft Program of Preservation Projects Second Connecting Arkansas Program

  24. New Highway Program Harrison Regional Meeting Project Information Amount Category Projects Miles (Millions) Let in Past 10 Y ears 232 978 $ 1,418 Remaining STIP Through 2023 136 665 $ 431 Pavements 287 1,654 $ 763 Bridges 206 - $ 143 Second Connecting Arkansas Program 7 148 $ 513 Totals 868 3,445 $ 3,268

  25. If Issue 1 Fails Annual Revenue Expected to be Available in SFY 2024 $ 95 Million Act 416 of 2019 Proposed Amendment $205 Million Current Construction Program $440 Million Total $535 Million $740 Million Nearly 30% Less Baxter County Highway 5 North of Mountain Home

  26. If Issue 1 Fails 10-Year Plan • Pavement Preservation $3.0 Billion • Bridge Improvements and Preservation $1.1 Billion • Interstate Maintenance $1.0 Billion • Safety Improvements $0.5 Billion • Capital and Congestion Relief (CAP-2) $1.8 Billion Benton County $5.35 Billion $7.4 Billion 10-Y ear Total Highway 37 North of Gateway

  27. If Issue 1 Fails Turnback to Cities 2023 - $150 Million 2024 - $106 Million Nearly a 30% Reduction Turnback to Counties 2023 - $150 Million 2024 - $106 Million Nearly a 30% Reduction

  28. If Issue 1 Fails Bull Shoals Baxter Cave Springs $75,000,000 Centerton Benton Charleston Lincoln Clarksville Total Amount Lost Boone Little Flock Clinton London Coal Hill $69.7 M Carroll Lowell $20.4 Million Cotter $65,000,000 Marshall Damascus Franklin Mountain Home Decatur Mountain View Denning Johnson Norfork Diamond City Oak Grove Dover Madison $55,000,000 Omaha Elkins Ozark Elm Springs Marion Pea Ridge Eureka Springs Pindall Everton Newton Pottsville Fairfield Bay Prairie Grove $49.2 M $45,000,000 Farmington Pope Pyatt Fayetteville Rogers Fifty-Six Searcy Russellville Flippin Salesville Garfield Stone Shirley Gassville $35,000,000 Siloam Springs Gateway Van Buren South Lead Hill Gentry Springdale Gilbert Washington Springtown Goshen St. Joe Gravette St. Paul $25,000,000 Green Forest Alpena Sulphur Springs Greenland Altus Summit Harrison Atkins Tontitown Hartman Avoca Valley Springs Hector Beaver West Fork Highfill Bella Vista $15,000,000 Western Grove Hindsville Bellefonte Wiederkehr Village Huntsville Bentonville Winslow Jasper Bergman Yellville Johnson Berryville Zinc Knoxville Bethel Heights $5,000,000 Lakeview Big Flat Lamar Blue Eye Lead Hill Branch 2023 2024 Leslie Briarcliff

  29. It’s Your Transportation System… YOU Get to Decide November 3, 2020

  30. Public Input

  31. It’s Your Transportation System… YOU Get to Decide Website Survey: ardot.gov/renew @myARDOT and #RenewARHwys November 3, 2020

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend