Scott E. Bennett, P.E. Director Public Meeting Harrison November 3, 2020 The Ballot Question: Issue 1 Funding from current sales tax YES continues after June 2023 Funding from current sales tax NO terminates after June 2023 Revenue
Public Meeting Harrison
$0.0 $1.0 $2.0 $3.0 $4.0 $5.0 $6.0 $7.0 Billions Fiscal Year
General Revenue Net Highway Revenue
$139 M $423 M
Excludes County & City Aid funds | Excludes CAP funds
$1.0 B $6.4 B
Item Description 1993 2015 Percent Change
College Tuition Average Tuition & Fees at Public 4-year Universities $1,908 $9,145 379% Healthcare National Expenditure Per Capita $3,402 $9,523 180% House Median New Home Price $118,000 $292,000 147% Gas Per Gallon $1.08 $2.56 137% Beef Per Pound of Ground Beef $1.97 $4.38 122% Movie Ticket Average Ticket Price $4.14 $8.43 104% Bread Per Pound of White Bread $0.75 $1.48 98% Income National Median Household $31,241 $56,516 81% Stamp One First-Class Stamp $0.29 $0.49 51% Car Average New Car $16,871 $25,487 51% Federal Gas Tax Per Gallon $0.18 $0.18 0%
Sources: Bureau of Labor Statistics, Centers for Medicare & Medicaid Services, College Board, Federal Reserve Bank of St. Louis, Oak Ridge National Laboratory, U.S. Census Bureau, U.S. Energy Information Agency, U.S. Postal Service
(Immediate Funding dedicated to System Preservation)
(Funding for System Preservation plus Capital Projects beginning in SFY 2024)
Provide $8.2 Billion in Economic Activity over 10 Y ears Support 3,596 Jobs Each Y ear* Maintain Interstates in a State of Good Repair Increase Safety Improvements Implement a Second Connecting Arkansas Program (CAP-2) Repair or Replace Poor Condition and Posted Bridges over 10 Y ears Improve Approximately 7,000 Miles of Non-Interstate Highways over 10 Y ears
*Source: prepared by the American Road & Transportation Builders Association (ARTBA), October 2018; data prorated for $300 million in additional annual revenue.
Projects Let in the Past Ten Years Remaining STIP Through 2023
Job Type Bridge Interchange Roadway New Location
Projects Let in the Past Ten Years Remaining STIP Through 2023
Job Type Bridge Interchange Roadway New Location
Category Projects Miles Amount
(Millions)
Let in Past 10 Y ears 232 978 $ 1,418 Remaining STIP Through 2023 136 665 $ 431 Totals 368 1,643 $ 1,849 Projects Let In The Past Ten Y ears and Funded Through 2023
2024-2033 Draft Program of Preservation Projects (Pavement & Bridges)
Job Type Bridge Roadway
2024-2033 Draft Program of Preservation Projects (Pavement & Bridges)
Job Type Bridge Roadway
Category Projects Miles Amount
(Millions)
Pavements 287 1,654 $ 763 Bridges 206
Totals 493 1,654 $ 906
Draft Program of Pavement & Bridge Preservation Projects
Second Connecting Arkansas Program
Second Connecting Arkansas Program
Job Type Bridge Interchange Roadway New Location
Second Connecting Arkansas Program
Second Connecting Arkansas Program
Job Type Bridge Interchange Roadway New Location
Huntsville to Black Rock (Selected Sections) $100 Million Cave City - North $50 Million Walnut Ridge to Missouri State Line (Selected Sections) $180 Million Jonesboro Area (Selected Sections) $50 Million
TBD
Highways 65/65B Harrison (Selected Sections) $60 Million Clinton to Harrison (Selected Sections) $90 Million
Projects Let Last 10 Years Remaining STIP Act 416 & State Surplus Revenue 2024-2033 Draft Program of Preservation Projects Second Connecting Arkansas Program
Job Type Bridge Interchange Roadway New Location
Projects Let Last 10 Years Remaining STIP Act 416 & State Surplus Revenue 2024-2033 Draft Program of Preservation Projects Second Connecting Arkansas Program
Job Type Bridge Interchange Roadway New Location
Harrison Regional Meeting Project Information
Category Projects Miles Amount
(Millions)
Let in Past 10 Y ears 232 978 $ 1,418 Remaining STIP Through 2023 136 665 $ 431 Pavements 287 1,654 $ 763 Bridges 206
Second Connecting Arkansas Program 7 148 $ 513 Totals 868 3,445 $ 3,268
Baxter County Highway 5
North of Mountain Home
Benton County Highway 37
North of Gateway
$5,000,000 $15,000,000 $25,000,000 $35,000,000 $45,000,000 $55,000,000 $65,000,000 $75,000,000
2023 2024
$69.7 M
Baxter Benton Boone Carroll Franklin Johnson Madison Marion Newton Pope Searcy Stone Van Buren Washington
$49.2 M
Total Amount Lost $20.4 Million
Alpena Altus Atkins Avoca Beaver Bella Vista Bellefonte Bentonville Bergman Berryville Bethel Heights Big Flat Blue Eye Branch Briarcliff Bull Shoals Cave Springs Centerton Charleston Clarksville Clinton Coal Hill Cotter Damascus Decatur Denning Diamond City Dover Elkins Elm Springs Eureka Springs Everton Fairfield Bay Farmington Fayetteville Fifty-Six Flippin Garfield Gassville Gateway Gentry Gilbert Goshen Gravette Green Forest Greenland Harrison Hartman Hector Highfill Hindsville Huntsville Jasper Johnson Knoxville Lakeview Lamar Lead Hill Leslie Lincoln Little Flock London Lowell Marshall Mountain Home Mountain View Norfork Oak Grove Omaha Ozark Pea Ridge Pindall Pottsville Prairie Grove Pyatt Rogers Russellville Salesville Shirley Siloam Springs South Lead Hill Springdale Springtown