Royal Street Bus Garage Ad hoc Advisory Committee March 12, 2014 Meeting Agenda Review of February 8 th Meeting Street Level Character Open Space Connections Building Scale and Transitions Land Uses Discussion Public


slide-1
SLIDE 1

Royal Street Bus Garage Ad hoc Advisory Committee

March 12, 2014

slide-2
SLIDE 2

2

Ad hoc Advisory Committee Meeting #2 3.12.2014

Meeting Agenda

  • Review of February 8th Meeting
  • Street Level Character
  • Open Space – Connections
  • Building Scale and Transitions
  • Land Uses Discussion
  • Public Benefits Discussion
  • Wrap-Up and Next Steps
slide-3
SLIDE 3

3

Ad hoc Advisory Committee Meeting #2 3.12.2014

Meeting Goals

  • Develop draft design principles for these topic areas:
  • Street Level Character
  • Open Space – Connections
  • Building Scale and Transitions
  • Identify appropriate land uses for the site
  • Identify key public benefits
  • Wrap-Up and Next Steps
slide-4
SLIDE 4

4

Ad hoc Advisory Committee Meeting #2 3.12.2014

Street Level Character

slide-5
SLIDE 5

5

Ad hoc Advisory Committee Meeting #2 3.12.2014

Street Level Character

  • Parking – Location and Access
  • Underground Utilities
  • Building Character – Streetscape
slide-6
SLIDE 6

6

Ad hoc Advisory Committee Meeting #2 3.12.2014

Comment:

  • Curb cuts should be minimized and

limited to N. Pitt and N. Royal

Potential Strategies:

  • Parking shall be located below-grade

(excluding townhomes)

  • Access to parking shall be from an

internal alley

  • All townhomes shall be rear load

Parking - Location and Access

slide-7
SLIDE 7

7

Ad hoc Advisory Committee Meeting #2 3.12.2014

Underground Utilities

Comment:

  • All utilities on the perimeter of the block will be located below

grade

slide-8
SLIDE 8

8

Ad hoc Advisory Committee Meeting #2 3.12.2014

Building Character - Streetscape

Comment:

  • Provide variation in facades to create

visual interest Potential Strategies:

  • Where residential uses are provided,

individual entries, stoops and canopies should be provided on the street frontage at regular intervals

  • Building materials shall be brick,

stucco, wood, metal, stone or similar durable material

  • Adjacent to the existing townhouse

communities to the west and south, provide elements such as bays, projections and step-backs

slide-9
SLIDE 9

9

Ad hoc Advisory Committee Meeting #2 3.12.2014

Open Space - Connections

slide-10
SLIDE 10

10

Ad hoc Advisory Committee Meeting #2 3.12.2014

Open Space - Connections

Comment:

  • Provide a contribution to improve adjacent open space

Potential Strategies:

  • Contributions shall be used for streetscape improvements on the

adjacent block to the east to provide a continuous open space connection from the site to the River.

  • Contributions shall be used for improvements to Wythe St Park.
slide-11
SLIDE 11

11

Ad hoc Advisory Committee Meeting #2 3.12.2014

Comment:

  • Public open space should look and

“feel” public

Potential Strategies:

  • Provide a publicly accessible open

space, a minimum of 25 ft. in width, along the Wythe St frontage to connect with the River.

  • Include elements such as street trees

and seating areas to reinforce the public nature of the open space connection.

Open Space - Connections

slide-12
SLIDE 12

12

Ad hoc Advisory Committee Meeting #2 3.12.2014

Comment:

  • Achieve a balance between public and private open space

Potential Strategies:

  • Provide appropriate setbacks (not to exceed 10 feet) on North

Pitt and Pendleton Streets to respect these sensitive edges.

Open Space - Connections

slide-13
SLIDE 13

13

Ad hoc Advisory Committee Meeting #2 3.12.2014

Open Space - Connections

Comment:

  • Private open spaces should be

distinguished from public open spaces

Potential Strategies:

  • In addition to the publicly

accessible (physically and visually)

  • pen space, provide ground level
  • pen space for residents.
  • The final location and amount shall

be determined through the development review process.

slide-14
SLIDE 14

14

Ad hoc Advisory Committee Meeting #2 3.12.2014

Building Scale and Transitions

slide-15
SLIDE 15

15

Ad hoc Advisory Committee Meeting #2 3.12.2014

Building Scale and Transitions

slide-16
SLIDE 16

16

Ad hoc Advisory Committee Meeting #2 3.12.2014

Building Scale and Transitions

40 – 50 ft. (4-5 stories) 50 - 60 ft. (5-6 stories) 60 - 80 ft. (6-7 stories) 30 – 40 ft. (3-4 stories)

slide-17
SLIDE 17

17

Ad hoc Advisory Committee Meeting #2 3.12.2014

Building Scale and Transitions

60’ 45’ Ladrey: 110’ Alexandria House: 220’ Portner’s Landing: 45’ The Kingsley: 60’

Comment:

  • Maintain lower-scale along south and west with additional

height contemplated north and east

slide-18
SLIDE 18

18

Ad hoc Advisory Committee Meeting #2 3.12.2014

Building Scale and Transitions

70’ 45’ Ladrey: 110’ Alexandria House: 220’ Portner’s Landing: 45’ The Kingsley: 60’

Comment:

  • Maintain lower-scale along south and west with additional

height contemplated north and east

slide-19
SLIDE 19

19

Ad hoc Advisory Committee Meeting #2 3.12.2014

Building Scale and Transitions

90’ 45’ Ladrey: 110’ Alexandria House: 220’ Portner’s Landing: 45’ The Kingsley: 60’

Comment:

  • Maintain lower-scale along south and west with additional

height contemplated north and east

slide-20
SLIDE 20

20

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

Existing Building

slide-21
SLIDE 21

21

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

WYTHE ST PENDLETON ST N ROYAL ST N PITT ST

slide-22
SLIDE 22

22

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

Townhouse Example

slide-23
SLIDE 23

23

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

WYTHE ST PENDLETON ST N ROYAL ST N PITT ST

slide-24
SLIDE 24

24

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

Chatham Square Example

slide-25
SLIDE 25

25

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

WYTHE ST PENDLETON ST N ROYAL ST N PITT ST

slide-26
SLIDE 26

26

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

The Asher Example

slide-27
SLIDE 27

27

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

WYTHE ST PENDLETON ST N ROYAL ST N PITT ST

slide-28
SLIDE 28

28

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

Varied Heights Example

slide-29
SLIDE 29

29

Ad hoc Advisory Committee Meeting #2 3.12.2014

N

WYTHE ST PENDLETON ST N ROYAL ST N PITT ST

slide-30
SLIDE 30

30

Ad hoc Advisory Committee Meeting #2 3.12.2014

Retention of Existing Building

slide-31
SLIDE 31

31

Ad hoc Advisory Committee Meeting #2 3.12.2014

Variety of Building Heights / Types

slide-32
SLIDE 32

32

Ad hoc Advisory Committee Meeting #2 3.12.2014

Questions and Discussion

slide-33
SLIDE 33

33

Ad hoc Advisory Committee Meeting #2 3.12.2014

Draft Design Principles

  • Street Level Character
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
slide-34
SLIDE 34

34

Ad hoc Advisory Committee Meeting #2 3.12.2014

Draft Design Principles

  • Open Space – Connections
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
slide-35
SLIDE 35

35

Ad hoc Advisory Committee Meeting #2 3.12.2014

Draft Design Principles

  • Building Scales and Transitions
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
  • _____________________________________________
slide-36
SLIDE 36

36

Ad hoc Advisory Committee Meeting #2 3.12.2014

Land Use

slide-37
SLIDE 37

37

Ad hoc Advisory Committee Meeting #2 3.12.2014

SITE

1992 Small Area Plan Retail Focus Areas

Plan seeks to reinforce the viability of existing retail activity and add additional retail and other service uses to the mix of uses to provide a more urban flavor and enhanced pedestrian activity. “A retail focus area (RFA) is a location where retail and personal service uses are viewed as vital to the neighborhood.” “…All retail focus uses are to be at ground floor locations and are required to provide street front, sidewalk-access entrances.”

slide-38
SLIDE 38

38

Ad hoc Advisory Committee Meeting #2 3.12.2014

SITE

Existing Land Use

  • Predominantly residential

South of Pendleton Street.

  • Varied mix of uses North
  • f Pendleton with retail,

service, office and hotel uses.

slide-39
SLIDE 39

39

Ad hoc Advisory Committee Meeting #2 3.12.2014

Existing Land Use / Retail Areas

  • Generally, the location of

existing retail uses align with those identified by the 1992 RFA strategy.

slide-40
SLIDE 40

40

Ad hoc Advisory Committee Meeting #2 3.12.2014

Comment:

  • Predominantly residential, although some nonresidential uses

could be contemplated

Potential Use Categories to Consider:

  • Office
  • Hotel
  • Residential
  • Retail
  • Entertainment
  • Is it necessary to define use?

*The RM zone permits single-family, two-family and townhouse dwellings, but not multi-family, office, hotel, retail or entertainment uses.

Land Use

slide-41
SLIDE 41

41

Ad hoc Advisory Committee Meeting #2 3.12.2014

Questions and Discussion

slide-42
SLIDE 42

42

Ad hoc Advisory Committee Meeting #2 3.12.2014

Public Benefits

slide-43
SLIDE 43

43

Ad hoc Advisory Committee Meeting #2 3.12.2014

Typical Benefits through DSUP

  • Streetscape improvements surrounding the site
  • Underground utilities, enhanced sidewalks, street

trees and pedestrian-scale lighting

  • Public art (contribution or on-site)
  • Green building
  • Affordable / workforce housing (contribution or on-

site units)

  • Stormwater management
  • High quality building design and materials
  • Underground or embedded parking
  • Capital Bike Share / similar contributions
slide-44
SLIDE 44

44

Ad hoc Advisory Committee Meeting #2 3.12.2014

Additional Benefits - Rezoning

  • Off-site pedestrian, bicycle or streetscape

improvements (crosswalks, bike lanes, etc.)

  • Improvements to adjacent open space / parks

(contribution or physical work completed)

  • Additional affordable / workforce housing

(contribution or units)

  • Retention of a portion of existing building
  • Community Space
  • Other?
slide-45
SLIDE 45

45

Ad hoc Advisory Committee Meeting #2 3.12.2014

Wrap-Up and Next Steps

slide-46
SLIDE 46

46

Ad hoc Advisory Committee Meeting #2 3.12.2014

  • Wrap-Up
  • Are there other topic areas which should be considered in

the redevelopment parameters and design standards?

  • Next Steps
  • Staff to synthesize observations and comments and

develop an initial draft of the design principles for discussion during the April Committee Meeting

  • Future Meeting Dates

Wrap-Up and Next Steps

slide-47
SLIDE 47

47

Ad hoc Advisory Committee Meeting #2 3.12.2014