Review of Benchmark Infrastructure Costings Presenter: Viraj Abeykoon 24 July 2018 Disclaimer This presentation contains certain statements and projections provided by or on behalf of Cardno Limited with respect to the anticipated future


slide-1
SLIDE 1

Review of Benchmark Infrastructure Costings

Presenter: Viraj Abeykoon 24 July 2018

slide-2
SLIDE 2

1

Title of Presentation goes here

This presentation contains certain statements and projections provided by or on behalf of Cardno Limited with respect to the anticipated future undertakings. Any forward‐looking statements reflect various assumptions by or on behalf of Cardno. Accordingly, these statements are subject to significant business, economic and competitive uncertainties and contingencies associated with the business of Cardno which may be beyond the control of Cardno which could cause actual results or trends to differ materially, including but not limited to competition, industry downturns, inability to enforce contractual and other arrangements, legislative and regulatory changes, sovereign and political risks, ability to meet funding requirements, dependence on key personnel and other market and economic factors. Accordingly, there can be no assurance that any such statements and projections will be realised. Cardno makes no representations as to the accuracy or completeness of any such statement of projections or that any projections will be achieved and there can be no assurance that any projections are attainable or will be realised. Additionally, Cardno makes no representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under statute or

  • therwise) is or will be accepted by Cardno or by any of their respective officers, directors, shareholders, partners, employees, or advisers (Relevant Parties) as to or

in relation to the accuracy or completeness of the information, statements, opinions or matters (express or implied) arising out of, contained in or derived from this presentation or any omission from this presentation or of any other written or oral information or opinions provided now or in the future to any interested party or its

  • advisers. In furnishing this presentation, Cardno undertakes no obligation to provide any additional or updated information whether as a result of new information,

future events or results or otherwise. Except to the extent prohibited by law, the Relevant Parties disclaim all liability that may otherwise arise due to any of this information being inaccurate or incomplete. By obtaining this document, the recipient releases the Relevant Parties from liability to the recipient for any loss or damage which any of them may suffer or incur arising directly or indirectly out of or in connection with any use of or reliance on any of this information, whether such liability arises in contract, tort (including negligence) or otherwise. This document does not constitute, and should not be construed as, either an offer to sell or a solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a basis to invest in Cardno.

Disclaimer

Review of Infrastructure Benchmark Costings

slide-3
SLIDE 3

2

Title of Presentation goes here

01 Introduction 02 Overview of Methodology 03 Background Data Processing 04 Monte-Carlo Analysis 05 Standardising Rates 06 Example Results

Topics

Review of Infrastructure Benchmark Costings

slide-4
SLIDE 4

Title of Presentation goes here

3

Introduction 01

Review of Infrastructure Benchmark Costings

slide-5
SLIDE 5

4

Title of Presentation goes here

The project aims to achieve: > Streamlined delivery of PSPs and ICPs > Provide accurate Benchmark Cost Estimates with a high degree of confidence 6 Infrastructure categories were investigated: > Roads and Intersections > Bridges > Culverts > Sporting Pavilions > Sports and Recreational Fields > Community Centers

Introduction

01

Review of Infrastructure Benchmark Costings

slide-6
SLIDE 6

Title of Presentation goes here

5

Overview of Methodology 02

Review of Infrastructure Benchmark Costings

slide-7
SLIDE 7

6

Title of Presentation goes here

Collate VPA Data Extract Statistical Properties Run Monte-Carlo Process Prepare representative drawings and extract quantities Obtain Total Project Costs for Infrastructure Items Obtain two types

  • f Rates

Overview of Methodology

02

Review of Infrastructure Benchmark Costings

slide-8
SLIDE 8

Title of Presentation goes here

7

Background Data Processing 03

Review of Infrastructure Benchmark Costings

slide-9
SLIDE 9

8

Title of Presentation goes here

Create a database of previously adopted rates

  • Split to various infrastructure items
  • Checked for Regional/ Topographical variations
  • Estimates with insufficient granularity were discarded

Background Data Processing

03

slide-10
SLIDE 10

9

Title of Presentation goes here

Background Data Processing

> Extracting Statistical Properties

  • Average Rate for each element
  • Standard Deviation for each element

> Regional Variances and Topographical Variances were not observed in the data. > Extracted costs modeled to follow a normal distribution

Example

03

50 52.5 55 57.5 60

Item Estimate 1 Estimate 2 Estimate 3 Mean

Standard Deviation

Kerb (per meter) 55 52 60 55.67 4.041 Drainage Pipe (per meter) 260 250 300 270 26.458

Review of Infrastructure Benchmark Costings

slide-11
SLIDE 11

Title of Presentation goes here

10

Monte-Carlo Analysis 04

Review of Infrastructure Benchmark Costings

slide-12
SLIDE 12

11

Title of Presentation goes here

> Monte-Carlo analysis is a world-renowned tool used to simulate a range of possibilities > In this instance, a range of infrastructure costs > Results can be used to provide Probabilistic Estimates > Cardno conducted 200,000 simulations > Quantities for above simulations were extracted from representative drawings

Monte-Carlo Analysis

04

Review of Infrastructure Benchmark Costings

slide-13
SLIDE 13

12

Title of Presentation goes here

Monte-Carlo Analysis

04

Item Rate ($/m) Quantity (m) Total ($) Kerb 56.00 10 560.00 Drainage 265.00 10 2650.00 TOTAL 3210.00

Review of Infrastructure Benchmark Costings

50 52.5 55 57.5 60

%

230 250 270 290 310

%

slide-14
SLIDE 14

13

Title of Presentation goes here

Monte-Carlo Analysis

Repeating this process over 200,000 iterations provides a distribution of possible project costs. P50 and P90 Totals were selected.

04

5000 10000 15000 20000 25000 2430000 2541000 2652000 2763000 2874000 2985000 3096000 3207000 3318000 3429000 3540000 3651000 3762000 3873000 3984000 4095000 4206000 4317000 4428000 4539000 4650000 Frequency Project Cost

Cost Frequency Distribution

Review of Infrastructure Benchmark Costings

slide-15
SLIDE 15

Title of Presentation goes here

14

Standardising Rates 05

Review of Infrastructure Benchmark Costings

slide-16
SLIDE 16

15

Title of Presentation goes here

Standardising Rates

> Obtained 2 sets of rates for each item producing P90 and P50 Monte-Carlo totals > Based on ‘Inversing’ Normal Distribution

  • f rates

> Example Monte Carlo result is P90 = $3,420

05

Item P90 Rate ($/m) Quantity (m) Total ($) Kerb 57.00 10 570.00 Drainage 285.00 10 2850.00 TOTAL 3420.00

Review of Infrastructure Benchmark Costings

50 52.5 55 57.5 60

%

230 250 270 290 310

%

slide-17
SLIDE 17

Title of Presentation goes here

16

Example Results 06

Review of Infrastructure Benchmark Costings

slide-18
SLIDE 18

17

Title of Presentation goes here

Example Results

06

Review of Infrastructure Benchmark Costings

slide-19
SLIDE 19

18

Title of Presentation goes here

Example Results

06

slide-20
SLIDE 20

19

Title of Presentation goes here

Example Results

06

Review of Infrastructure Benchmark Costings

slide-21
SLIDE 21

20

Title of Presentation goes here

Example Results

06

Review of Infrastructure Benchmark Costings

slide-22
SLIDE 22

Thank you

21

Title of Presentation goes here

Review of Infrastructure Benchmark Costings