Research, Infrastructure and Facilities @ CEME
Intra-NUST Research Conference (INRC 2014) 8 Nov 2014
1
Research, Infrastructure and Facilities @ CEME Intra-NUST Research - - PowerPoint PPT Presentation
Research, Infrastructure and Facilities @ CEME Intra-NUST Research Conference (INRC 2014) 8 Nov 2014 1 Sequence ( 30 mins ) Overview of Infrastructure and Facilities 6 minutes By Dr Farooque Azam (HoD Research) Robotics and Prosthesis
1
2
3
Foreign 33 (67.3%) Local 16 (32.7%)
PhD
4
Foreign 13 (30.3%) Local 30 (69.7%)
MS / M Phil
Department Year Journals Conference ISI Impact journals Total Computer Engineering 2013 42 40 28 110 2014 50 62 39 151 Basic Sciences & Humanities 2013 01 54 55 2014 01 57 58 Electrical Engineering 2013 2 16 01 19 2014 2 11 02 15 Mechanical Engineering 2013 01 05 04 10 2014 01 06 04 11 Mechatronics Engineering 2013 05 18 02 25 2014 04 15 04 23 Engineering Management 2013 05 18 02 25 2014 04 15 04 23 Total 116 208 201 525
5
55 61 98 110 91 110 20 40 60 80 100 120 2013 2014 Journals Conferences ISI Impact Journals
6
S/No Project Title Principal Investigator
Bin Ihsan
Mumtaz Malik
Iqbal
Waheed Ul Haq
7
S/No Project Title Principal Investigator
Col Dr Khalid Mehmood
Dr Shoab A Khan
Brig Dr. M Younis Javed
Akhtar
Asst Prof M. Saif Ullah Khalid
8
– Robotics and Control Lab – Industrial Automation Lab – Machine vision & Embedded Sys Lab – Electric Circuits Lab – CAD/CAM Lab
– DSP & DSD Lab – Embedded Systems Lab – Computing Lab – Image processing Lab – Computer Networks Lab – Project lab – Electronics Lab
− Strength of Materials Lab − Dynamics & Control Lab − Fluid Mechanics Lab − Heat Transfer Lab − Steam Lab − Computer Aided Engineering Lab − Automotive Lab − Engineering Workshops − Composite Materials Research Lab − Mechanarium Research Lab
− Microwave Lab − Basic Electronics Lab − Electrical Machines Lab − Digital Signal Processing Lab − Communication Lab − Control System Lab − Electronics System Lab
9
10
11
Machine Shop Welding Shop Fitter Shop
12
– ABBIRB 2400 robotic arm with controller – ‘LK-5 Industrial Robotic Arm and Welding Unit – ActiveMedia PeopleBot Mobile Robot – JANOME JR 2200 Screw Tightning Robot – XR-4 Robotic Arm with Mark-IV Controller – OCT-1C 8-Legged Walking Robot – Khepera-II Mobile Robot – Rug Warrior Robots – Intelitek Vision System – Intelitek Conveyor System with Allen Bradley PLCs – Quanser SRV-02-ET, Inverted Pendulem Seesaw – Quanser SRV-02-ET Self Erecting Pendulem
13
– Denford CIM System – CNC Slant Bed Lathe – Denford CNC 3-Axis Milling Center – Denford Servo Robots and Conveyer system – PCs with CAD/CAM Softwares – PLC trainer with LCD display – PLC trainer with hand-held programmer – ST/6 CNC Lathe – RM/6 CNC Mini Milling Machine (Wood Router) – Mini CNC System (Attachments) – Desktop PCs
14
– Multimedia Projector – Oscilloscopes, 40 MHz (INSTEK, Taiwan) – Power Supplies DC, 3-Channel 195W (INSTEK, Taiwan) – Function Generators 5 MHz, (ESCORT, Taiwan) – Digital Multimeters, (handheld, ESCORT, Taiwan) – Digital Logic Trainers – Cameras – Micro Controller Trainers – PIC Development Board (easyPIC 5) – Desktop PCs
15
S/No Research Groups 1 Robotics and Prosthesis Research Group 2 Bio Medical Research Group 3 Automotives Research Group 4 Intelligent Systems Research Group 5 MicroElectroMechanical Systems (MEMS) Research Group
16
17
− Strength of Materials Lab − Dynamics & Control Lab − Fluid Mechanics Lab − Heat Transfer Lab − Steam Lab − Computer Aided Engineering Lab − Automotive Lab − Engineering Workshops − Composite Materials Research Lab − Mechanarium Research Lab
18
S/No Research Groups 1 Manufacturing Research Group 2 Composite Research Group 3 Automotive Engineering Research Group 4 Mechanarium Research Group 5 Renewable Energy Research Group
19
20
composite materials, including failure and damage modeling, Structural health monitoring, testing standards for 3D composites, product design and development, manufacturing processes, micromechanics, wind turbine blades design and software development.
8.5 Million: titled “Capacity building for enhancing R&D in manufacturing, testing and certification of composite materials” (PI : Dr Rizwan S Choudhry)
HEC, Pakistan: Rs. 9.993 Million: titled "Developing testing standards for advanced 3D fibre reinforced polymeric composite materials“(PI : Dr Rizwan S Choudhry)
Design of a 36 m long composite wind turbine blade Design and manufacture of Olympic standard canoe Vacuum assisted resin infusion Modelling transverse impact damage growth in composites
21
simulation of engineering and industrial applications ranging from aerospace to energy efficiency to biomedical applications
COMSTECH, Italy , US $8500 (PI: Dr Imran Akhtar)
Rs 350,000 (PI: Asst Prof M. Saif Ullah Khalid)
Insertion torques in dental implants FSI of a vertical-axis wind turbine FSI over turbine blades for fatigue Simulation of a vacuum pump CFD of Data Center for energy conservations
22
related solutions. The current focus is on analysis and improvement of dynamic stability of vehicles
vehicle prototypes and technologies.
Raja Amir)
level and best mileage from South Asia (2012) in Urban concept Category
Team NUSTAG at SEM 2013 Wheeled All Terrain Mobility Platform Indigenously Developed Rickshaw and Electric Hybrid Vehicle
23
Solar Thermal Engineering with special focus on various Solar based heating and cooling applications. Group also emphasizes on different storage materials used for solar energy
& also on potential of solar industrial water heating
Prof Ahmed Sohail)
Ahmed Sohail)
Ahmed Sohail)
24
With the rapidly evolving global manufacturing industry, MRG is aimed at developing solutions that are abreast with current and future technologies of reconfigurable manufacturing systems with Pakistan’s expanding manufacturing sector in perspective.
Precision Manufacturing
Reconfigurable Manufacturing Process plan Optimization Assembly Line Design Algorithmic Design Fixture Design
More than 10 Research publications in renowned international journals. Assembly line balancing and optimization for mixed model line at Pakistan’s largest manufacturing setup completed in 2011. Development of 04 DOF Parallel Manipulator (Awarded Best UG Project 2012)
25
− Microwave Lab − Basic Electronics Lab − Electrical Machines Lab − Digital Signal Processing Lab − Communication Lab − Control System Lab − Electronics System Lab
26
S/No Research Groups 1 Semiconductors Research Group 2 Bio Medical Research Group 3 DSP & communication Systems Research Group 4 Control Systems Research Group 5 MicroElectroMechanical Systems (MEMS) Research Group
27
28
29
30
31
S/No Research Groups
32
33
34