PUBLIC UTILITIES REGULATORY COMMISSION (PURC) PUBLICATION OF ELECTRICITY TARIFFS In accordance with the statutory duty imposed on the Public Utilities Regulatory Commission (the Commission) under Section 19 of the Public Utilities Regulatory


slide-1
SLIDE 1

PUBLIC UTILITIES REGULATORY COMMISSION (PURC) PUBLICATION OF ELECTRICITY TARIFFS In accordance with the statutory duty imposed on the Public Utilities Regulatory Commission (‘the Commission’) under Section 19 of the Public Utilities Regulatory Commission Act, 1997 (Act 538), (‘the Act’) this publication is made this 30 September 2019. 1. The Bulk Generation Charge provided in the First Schedule is the weighted average rate at which electricity distribution companies (DISCos), namely Power Distribution Services Limited (PDS), Northern Electricity Distribution Company Limited (NEDCo) and Enclave Power Company Limited (EPCL) shall procure electricity from generation sources in respect of their operations in the regulated market, from 1 October 2019. 2. The Transmission Service Charges (TSC) provided in the Second Schedule are the rates applicable to the transmission of electricity by the Ghana Grid Company Limited (GRIDCo), from 1 October 2019 as follows: a. TSC 1 is the rate for GRIDCo to recover the cost of transmission network operations. b. TSC 2 is the rate for GRIDCo to recover transmission losses. 3. A DISCo or Bulk Customer which procures electricity from an electricity generator and pays the full cost of the total electricity purchased to the electricity generator shall pay TSC 1 only, to GRIDCo. 4. A DISCo or Bulk Customer which procures electricity from an electricity generator and pays the cost of the electricity purchased excluding transmission losses, shall pay both TSC 1 and TSC 2 to GRIDCo. 5. The Distribution Service Charges (DSC) provided in the Third Schedule are the rates applicable to the distribution of electricity by DISCos, from 1 October 2019 as follows: a. DSC 1 is the rate for DISCos to recover the cost of distribution network operations. b. DSC 2 is the rate for DISCos to recover distribution losses. c. DWC comprises DSC 1 and DSC 2 and is the rate payable to DISCos for the use of their networks by embedded Bulk Customers. 6. A Bulk Customer embedded in the distribution network which procures electricity directly from an electricity generator and pays the total cost of the electricity purchased including TSC 1 and TSC 2 shall pay DSC 1 only to the DISCo. 7. A Bulk Customer embedded in the distribution network which procures electricity through a DISCo shall pay to the affected DISCo, the cost of the electricity delivered at the customer’s premises in addition to TSC 1, TSC 2 and the DWC. 8. The End-User Tariffs provided in the Fourth Schedule are the rates payable by consumers in the specified categories, from 1 October 2019. 9. The End-User Tariffs provided in the Fifth Schedule are alternative rates (Maximum Demand Charge and Energy Charge) to the Fourth Schedule applicable and payable by Special Load Tariff (SLT) Customers, from 1 October 2019.

  • 10. The tariffs are denominated in Ghana Pesewas (GHp).
  • 11. The tariffs shall remain in force until they are reviewed by the Commission.
  • 12. Until the next major tariff review, electricity tariffs shall be adjusted by the Commission in accordance with the

Automatic Adjustment (Indexation) Formula published in Gazette No. 15 of 25th February 2011.

  • 13. The rates approved by the Commission and published in Gazette No. 121 of 7th August 2019 are revoked and

replaced with the rates contained in this publication. ACRONYMS BGC Bulk Generation Charge DISCo Electricity Distribution Company DSC Distribution Service Charge DWC Distribution Wheeling Charge EUT End User Tariff GHp Ghana Pesewa IPP Independent Power Producer kVA Kilovolt Ampere kWh Kilowatt-Hour SLT-LV Special Load Tariff – Low Voltage SLT-MV Special Load Tariff – Medium Voltage SLT-HV Special Load Tariff – High Voltage TSC Transmission Service Charge VRA Volta River Authority

slide-2
SLIDE 2

FIRST SCHEDULE Tariff Category Effective 1 October 2019 BGC VRA

  • (GHp/kWh)

29.9467 Composite BGC (VRA and IPPs)

  • (GHp/kWh)

46.8699 SECOND SCHEDULE Tariff Category Effective 1 October 2019 TSC 1*

  • (GHp/kWh)

7.1421 TSC 2

  • (GHp/kWh)

2.0047 THIRD SCHEDULE Tariff Category Effective 1 October 2019 DSC 1

  • (GHp/kWh)

16.1094 DSC 2

  • (GHp/kWh)

15.4213 DWC

  • (GHp/kWh)

31.5307 FOURTH SCHEDULE Tariff Category (EUT) Effective 1 October 2019 Residential 0-50

  • (GHp/kWh)

51-300

  • (GHp/kWh)

301 – 600

  • (GHp/kWh)

601+

  • (GHp/kWh)

Service Charge:

Lifeline Consumers

  • (GHp/month)

Other Residential Consumers

  • (GHp/month)

32.6060 65.4161 84.8974 94.3304 213.0000 745.6947 Non-Residential 0-100

  • (GHp/kWh)

101-300

  • (GHp/kWh)

301 – 600

  • (GHp/kWh)

601+

  • (GHp/kWh)

Service Charge

  • (GHp/month)

79.7943 79.7943 84.9097 133.9765 1242.8245 SLT-LV Energy Charge

  • (GHp/kWh)

Service Charge

  • (GHp/month)

104.7303 4971.2983 SLT-MV Energy Charge

  • (GHp/kWh)

Service Charge

  • (GHp/month)

79.5167 6959.8177 SLT-HV Energy Charge

  • (GHp/kWh)

Service Charge

  • (GHp/month)

83.4562 6959.8177 SLT-HV MINES Energy Charge

  • (GHp/kWh)

Service Charge

  • (GHp/month)

263.9705 6959.8177

*Includes Regulatory Levy

slide-3
SLIDE 3

FIFTH SCHEDULE (ALTERNATIVE RATES FOR SLT CUSTOMERS) Tariff Category (EUT) Effective 1 October 2019 SLT-LV Maximum Demand Charge

  • (GHp/kVA/month)

Energy Charge

  • (GHp/kWh)

Service Charge

  • (GHp/month)

6959.8177 89.1105 4971.2983 SLT-MV

  • Max. Demand
  • (GHp/kVA/month)

Energy Charge

  • (GHp/kWh)

Service Charge

  • (GHp/month)

5965.5580 68.9767 6959.8177 SLT-HV

  • Max. Demand
  • (GHp/kVA/month)

Energy Charge

  • (GHp/kWh)

Service Charge

  • (GHp/month)

5965.5580 63.3840 6959.8177 SLT-HV MINES

  • Max. Demand
  • (GHp/kVA/month)

Energy Charge

  • (GHp/kWh)

Service Charge

  • (GHp/month)

6959.8177 120.8026 6959.8177 Chairman Public Utilities Regulatory Commission

slide-4
SLIDE 4
  • MR. MICHAEL OPAM

………………………………SIGNED……………………………. COMMISSIONER

  • MRS. MAMI DUFIE OFORI

………………………………SIGNED……………………………. COMMISSIONER

  • MRS. DORA OPPONG

………………………………SIGNED……………………………. COMMISSIONER

  • MR. DANIEL OWUSU-KORANTENG

………………………………SIGNED……………………………. COMMISSIONER

  • DR. YAW ADU-GYAMFI

………………………………SIGNED……………………………. COMMISSIONER

  • MR. EBO B. QUAGRAINIE

………………………………SIGNED……………………………. COMMISSIONER

  • PROF. JOE AMOAKO-TUFFOUR

………………………………SIGNED……………………………. COMMISSIONER

  • MR. ISHMAEL EDJEKUMHENE

………………………………SIGNED……………………………. COMMISSIONER

  • MR. EMMANUEL SEKOR

………………………………SIGNED……………………………. COMMISSIONER

slide-5
SLIDE 5

PUBLIC UTILITIES REGULATORY COMMISSION (PURC) PUBLICATION OF WATER TARIFFS

In accordance with the duty imposed on the Public Utilities Regulatory Commission (‘the Commission’) under Sections 3(b) and 19 of the Public Utilities Regulatory Commission Act, 1997 (Act 538), (‘the Act’) this publication is made this 30 September 2019.

1. The applicable tariffs for Ghana Water Company Limited (GWCL) are as provided in the schedule hereto. 2. The rates are denominated in Ghana Pesewas (GHp). 3. These approved tariffs shall remain in force until they are reviewed by the Public Utilities Regulatory Commission.

4. Until the next major tariff review, water tariffs shall be adjusted in accordance with the Automatic Adjustment (Indexation) Formula published in Gazette No. 15 of 25th February 2011.

5. The rates approved by the Public Utilities Regulatory Commission and published in Gazette No. 114 of 24th July 2019 are revoked and replaced with the following: SCHEDULE Category of Service Monthly Consumption (1000 Litres) Approved Rates in GHp / 1000 Litres (Effective 1st October 2019) (a) Metered Domestic: 0-5 (Exclusive) 5 and above (b) Commercial (c) Industrial (d) Public Institutions /Govt. Departments 329.2121 560.2083 923.0390 1111.8338 718.6628 (e) Premises without connection (Public stand pipes) per 1000 litres 369.4489 (f) Special Commercial 5607.5588 (g) Sachet Water Producers 1237.7011 (h) Ghana Ports and Harbours Authority (Internal Usage) 923.0390 (i) Ghana Ports and Harbours Authority (Ocean Going Vessels) 12586.8266 NOTE: Special Commercial refers to bulk customers who use GWCL treated water as the main raw material for bottling water for resale. Chairman Public Utilities Regulatory Commission

slide-6
SLIDE 6
  • MR. MICHAEL OPAM

………………………………SIGNED……………………………. COMMISSIONER

  • MRS. MAMI DUFIE OFORI

………………………………SIGNED……………………………. COMMISSIONER

  • MRS. DORA OPPONG

………………………………SIGNED……………………………. COMMISSIONER

  • MR. DANIEL OWUSU-KORANTENG

………………………………SIGNED……………………………. COMMISSIONER

  • DR. YAW ADU-GYAMFI

………………………………SIGNED……………………………. COMMISSIONER

  • MR. EBO B. QUAGRAINIE

………………………………SIGNED……………………………. COMMISSIONER

  • PROF. JOE AMOAKO-TUFFOUR

………………………………SIGNED……………………………. COMMISSIONER

  • MR. ISHMAEL EDJEKUMHENE

………………………………SIGNED……………………………. COMMISSIONER

  • MR. EMMANUEL SEKOR

………………………………SIGNED……………………………. COMMISSIONER