PUBLI LIC HEAR HEARING IH-30 30 IMPROVEMEN EMENT PROJECT ECT FROM: BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) 2642 Dallas and Rockwall Counties, Texas CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January


slide-1
SLIDE 1

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

FROM: BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) 2642 Dallas and Rockwall Counties, Texas

PUBLI LIC HEAR HEARING IH-30 30 IMPROVEMEN EMENT PROJECT ECT

slide-2
SLIDE 2

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

ELE LECTED & & PUBLI LIC OFFICIALS LS DISTR TRICT & T & AGEN ENCY S STAFF CONSU SULTANTS

PUBLIC H HEARING INTR TROD ODUCTI TIONS

2
slide-3
SLIDE 3

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PUBLIC HEAR ARING P PURPOSE

1.

  • 1. Inf

nform rm th the p public lic of p project s t status a and nd present r nt recommend ndatio ions ns 2.

  • 2. Des

escribe t the pr e proj

  • ject s

so t

  • the pu

e public c can det deter ermine h how w they m may be a affected 3.

  • 3. Provide th

the public lic th the o

  • pportu

tunit nity y to provid vide i inp nput 4.

  • 4. Develo

lop a record rd o

  • f p

public lic p partic ticip ipatio ion

3
slide-4
SLIDE 4

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

Mike Garrison, P.E. Katelyn Kowalczyk Lacey Rogers, P.E. Lacey Rodgers, P.E. Introduction Project Design Presentation Environmental Presentation 20 Minute Recess - Questions Public Comments 1 2 3 4

PUBLIC HEARING A G AGEN GENDA

4
slide-5
SLIDE 5

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PUBLIC I INQUIRIES

  • Websites:

– https://www.txdot.gov/inside-txdot/get-involved/about/hearings- meetings.html – Under “Hearings and Meetings Schedule” – http://www.keepitmovingdallas.com/

  • Under “Public Hearings/Meetings”

Schematic ics may b y be e vie viewed ed at: TxDOT Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150

5
slide-6
SLIDE 6

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PROJECT CT LOCA CATI TION ON, NEED AND PURPOS OSE

PROJECT CT L LIMITS: S:

  • From Bass Pro Drive to

west of FM 2642

  • Project Length: 17 miles
  • Cities of Garland, Dallas,

Rowlett, Rockwall, Mobile City, Fate, Royse City

  • Dallas and Rockwall

Counties PROJECT CT N NEED:

  • Traffic congestion
  • Future growth within the

project corridor PROJECT P PURPO POSE:

  • Improve mobility
  • Reduce traffic

congestion

6
slide-7
SLIDE 7

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

EXISTING F FACILITY

7

HORIZON RO ROAD TO TO SH 205 : : BAS ASS P PRO DRI RIVE T TO HORI RIZO ZON R ROAD AD: SH 205 T 05 TO FM 2642 : 642 :

WB WBFR (DISCONTIN INUOUS) EBFR FR (DISCONTIN INUOUS) WB WB R RAMP EB R RAMP
slide-8
SLIDE 8

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

EXISTING F FACILITY – IH-30 FRONTAGE RO ROADS OV OVER R LAKE R RAY HUBBARD RD

8 CO CONTI TINUOUS F FRONTAG TAGE ROAD ADS AL ALONG TH THE E EAS AST- AND W D WESTBOUND M D MAIN L LANES B BETWEEN B BASS PRO RO DRI DRIVE A AND L D LAKE RA RAY H HUBBARD RD PROPO OPOSED I IH-30 30 BAS ASS P PRO D DRIVE TO TO DAL ALROCK R ROAD AD (BREAK AKOUT P PROJECT)
slide-9
SLIDE 9

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PROPOSED FACILITY

9 WBF BFR (B (BRE REAKOUT P PRO ROJECT) EBF BFR (B (BRE REAKOUT P PRO ROJECT) PROPOSE OSED I IH-30 30 BA BASS SS PRO DRIVE T TO O DALR LROCK ROA OAD PROPOSE OSED I IH-30 30 DA DALRO ROCK RO ROAD T D TO HORI RIZON RO ROAD
  • Proposed widening to maintain eight 12-feet mainlanes (four in each direction) and provide for 10-foot inside

and outside shoulders

  • Proposed six-lane continuous frontage roads (three in each direction) from Dalrock Road to Horizon Drive

across Lake Ray Hubbard

  • Proposed 12-ft wide shared use path along eastbound outer frontage road for pedestrian accommodation
  • Proposed 8-ft wide sidewalk along westbound outer lane of the frontage road also for bicyclists and

pedestrian accommodation

WBF BFR EBF BFR
slide-10
SLIDE 10

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PROPOSED FACILITY

10 PROPOSE OSED I IH-30 30 HOR ORIZON ON ROA OAD TO SH O SH 2 205 PROPOSE OSED I IH-30 30 SH 205 205 TO F FM 2642 2642 WBF BFR EBF BFR WBF BFR EBF BFR WB RA RAMP EB R RAMP MP
  • Horizon RD TO SH 205: Proposed widening to provide eight 12-foot mainlanes (four in each direction) and

10-foot inside and outside shoulders

  • SH 205 TO FM 2642: Proposed six 12-foot mainlanes (three in each direction) and 10-foot inside and outside

shoulders

  • Proposed two to three lanes continuous frontage roads in each direction with 12-foot wide inside lanes and a

14-foot wide outside shared use lane

  • Pedestrian accommodation for the entire project limits
EB R RAMP MP WB RA RAMP
slide-11
SLIDE 11

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

UTILITY A ADJUS USTMENTS

  • Underground and overhead utilities

– Adjustments and relocations may be required prior to and during construction of the proposed project – No substantial service interruptions are anticipated

11
slide-12
SLIDE 12

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PR PROJECTED C COST & & SCHEDULE

Envi vironme mental Cl Clearance Da Date Sprin pring 2 2019 Deliv liver in r in Pha Phases Ready F dy Fall 2 l 2022 Es Estim imated Total Pro Project C Cost $627 M Millio illion

12
slide-13
SLIDE 13

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

The e environ

  • nmental r

l review, c consult ltation

  • n, a

and ot

  • ther a

actions required b by appli pplicable le F Fede deral e envir ironmental la l laws f for

  • r this

project a are e bei eing, o

  • r have

e been een, c carried-out by by TxDOT OT p pursuant to 23 U. U.S.C. 327 and nd a Memorand ndum o

  • f Und

Understanding d dated December 16, 6, 20 2014, 4, a and e executed by F FHWA and T TxDOT. REVIEW AND APPROVAL OF ENVIRONMENTAL

L DOCUMENT

13
slide-14
SLIDE 14

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

ENVIRONMENTAL R L REVIEW / / IMPACTS S ADDRESSE SED

  • Air Quality
  • Archeological Resources
  • Biological Resources
  • Community Impacts
  • Historic Resources
  • Hazardous Materials
  • Indirect and Cumulative Impacts
  • Right-of-Way Acquisition
  • Traffic Noise
  • Vegetation and Wildlife
  • Water Resources

IMPACTS A ADDRESSED

14
slide-15
SLIDE 15

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

ENVIRONMENTAL R REVIEW CONTINUE UED

  • Portions of the
project are within the 100-year floodplain.
  • The hydraulic
design for this project would be in accordance with current FHWA, TxDOT, and local design policies, laws, regulations, and standards.

Flood

  • odpla

lain ins

  • Proposed project
crosses Lake Ray Hubbard, one wetland, and 17 streams.
  • Anticipated impacts
total approximately 0.312 acres of Waters
  • f the U.S.
  • USACE Section 404
Nationwide Permit 25 (Structural Discharges) and Nationwide Permit 14 (Linear Transportation) required.
  • A PCN for impacts to
wetlands.

Wate aters o

  • f th

the U U.S. Hazardous M Materials

  • Noise impacts

identified.

  • Noise abatement

measures were considered.

  • Abatement

measures were determined to be feasible and reasonable at two

  • locations. Both

along the westbound frontage roads near the Dalrock Road Interchange. Traffic ic N Nois ise

Con

  • nclu

lusio ion: Studie ies, a analy lyses, and evalu luatio ion of

  • f the

prop

  • pos
  • sed proj
  • jec

ect in indic icate e no

  • sign

ignif ific icant im impacts

  • No listed or

eligible historic properties affected.

  • The proposed

project would have no impact

  • r use of historic

properties under Section 4(f). Histor

  • ric P

Proper erties es

  • Three gas stations

were determined to be either moderate

  • r high

environmental risk to the project.

  • Special provisions
  • r contingency

language would be included in the project's construction plans to handle hazardous materials and/or petroleum contamination according to applicable federal and state regulations.

15
slide-16
SLIDE 16

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

ENVIRONMENTAL L REVIEW - RIGHT-OF OF-WAY AY

  • Propo
  • posed

ed R Rig ight-of

  • f-Wa

Way ( (ROW) – 34.60 acres es of

  • f pr

propos

  • posed r

d rig ight-of

  • f-wa

way ( (ROW) need eeded ed – Ther ere w e wou

  • uld b

ld be e no

  • res

esid idential or

  • r com
  • mmercial

dis displ placements a as a res esult of

  • f the

e pr proj

  • jec

ect – No

  • pu

public lic f facil ilities w wou

  • uld b

ld be e dis displ placed

16
slide-17
SLIDE 17

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

NEXT STEPS AND TIMELI LINE

  • Public

lic C Com

  • mmen

ent Period eriod (en ends Feb ebru ruary 15, , 2019)

  • Anticipated Env

nvironm nment ntal Clearanc nce M March 2019

  • Pla

lan P Prep repara ration

  • n
  • Fu

Funding

  • Appro

roval of

  • f Con
  • nstru

ruction

  • n Pla

lans

Ne Next xt Step eps An And Time imelin line

Public Meeting H Held
  • April /
l /May, 2 2017 Schematic A Appr pprove ved
  • March
ch 2018 2018 Publi lic H Hearing - January 2019 2019 ENV Clearance
  • March 2019
2019 Phase sed C Const struction L Letting- Ready F Fall 2022 2022 Right ht-of-Way A Acquisition
  • June
2020 020

PROJECT ECT TIM IMEL ELIN INE

17
slide-18
SLIDE 18

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PUBLIC C COMME OMMENTS

  • 20 minute recess
  • Comment period following recess
18
slide-19
SLIDE 19

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

REC ECES ESS

Re Recess 20 minutes

19
slide-20
SLIDE 20

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PUBLIC C COMME OMMENTS

Com Comment P Per eriod

  • d

Please note that we will not attempt to respond to your comments at this time. All substantive comments will be fully considered and responded to in the project record.

20
slide-21
SLIDE 21

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PUBLIC C COMME OMMENTS

Ques estions a and c d com

  • mments m

may y be e mail iled ed or

  • r em

emaile led t to:

  • :

Ma Mailing A g Addr ddress TxDOT Dallas District Office Attn: Mr. Jason Estridge, P.E. 4777 E. Highway 80 Mesquite, TX 75150-6643 Email: Jason.Estridge@txdot.gov ― Written comments must be postmarked by Frida day, F February 15, 5, 20 2019 19 – Project information is available for inspection at:

  • www.txdot.gov/inside-txdot/get-involved.html under “Hearings & Meetings

Schedule”

  • www.keepitmovingdallas.com under “Upcoming Public Hearing/Meeting”
21
slide-22
SLIDE 22

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

PUBLIC C COMME OMMENTS

3:00 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52 2:51 2:50 2:49 2:48 2:47 2:46 2:45 2:44 2:43 2:42 2:41 2:40 2:39 2:38 2:37 2:36 2:35 2:34 2:33 2:32 2:31 2:30 2:29 2:28 2:27 2:26 2:25 2:24 2:23 2:22 2:21 2:20 2:19 2:18 2:17 2:16 2:15 2:14 2:13 2:12 2:11 2:10 2:09 2:08 2:07 2:06 2:05 2:04 2:03 2:02 2:01 2:00 1:59 1:58 1:57 1:56 1:55 1:54 1:53 1:52 1:51 1:50 1:49 1:48 1:47 1:46 1:45 1:44 1:43 1:42 1:41 1:40 1:39 1:38 1:37 1:36 1:35 1:34 1:33 1:32 1:31 1:30 1:29 1:28 1:27 1:26 1:25 1:24 1:23 1:22 1:21 1:20 1:19 1:18 1:17 1:16 1:15 1:14 1:13 1:12 1:11 1:10 1:09 1:08 1:07 1:06 1:05 1:04 1:03 1:02 1:01 1:00 0:59 0:58 0:57 0:56 0:55 0:54 0:53 0:52 0:51 0:50 0:49 0:48 0:47 0:46 0:45 0:44 0:43 0:42 0:41 0:40 0:39 0:38 0:37 0:36 0:35 0:34 0:33 0:32 0:31 0:30 0:29 0:28 0:27 0:26 0:25 0:24 0:23 0:22 0:21 0:20 0:19 0:18 0:17 0:16 0:15 0:14 0:13 0:12 0:11 0:10 0:09 0:08 0:07 0:06 0:05 0:04 0:03 0:02 0:01 3:00 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52 2:51 2:50 2:49 2:48 2:47 2:46 2:45 2:44 2:43 2:42 2:41 2:40 2:39 2:38 2:37 2:36 2:35 2:34 2:33 2:32 2:31 2:30 2:29 2:28 2:27 2:26 2:25 2:24 2:23 2:22 2:21 2:20 2:19 2:18 2:17 2:16 2:15 2:14 2:13 2:12 2:11 2:10 2:09 2:08 2:07 2:06 2:05 2:04 2:03 2:02 2:01 2:00 1:59 1:58 1:57 1:56 1:55 1:54 1:53 1:52 1:51 1:50 1:49 1:48 1:47 1:46 1:45 1:44 1:43 1:42 1:41 1:40 1:39 1:38 1:37 1:36 1:35 1:34 1:33 1:32 1:31 1:30 1:29 1:28 1:27 1:26 1:25 1:24 1:23 1:22 1:21 1:20 1:19 1:18 1:17 1:16 1:15 1:14 1:13 1:12 1:11 1:10 1:09 1:08 1:07 1:06 1:05 1:04 1:03 1:02 1:01 1:00 0:59 0:58 0:57 0:56 0:55 0:54 0:53 0:52 0:51 0:50 0:49 0:48 0:47 0:46 0:45 0:44 0:43 0:42 0:41 0:40 0:39 0:38 0:37 0:36 0:35 0:34 0:33 0:32 0:31 0:30 0:29 0:28 0:27 0:26 0:25 0:24 0:23 0:22 0:21 0:20 0:19 0:18 0:17 0:16 0:15 0:14 0:13 0:12 0:11 0:10 0:09 0:08 0:07 0:06 0:05 0:04 0:03 0:02

  • So that everyone may speak, please limit your

comments to three (3) minutes

22
slide-23
SLIDE 23

CSJs: 0009-11-238, 0009-12-215, 0009-12-219 and 0009-12-220 Thursday January 31st, 2019

Tha Thank nk y you for r your int r interest in in the he

IH-30 I 0 IMPROVEMEN ENT PROJECT

23