PROJECT THE FUTURE, INNOVATING AT PRESENT.
ENGINEERING
PROJECT THE FUTURE, INNOVATING AT PRESENT. Index 2 Company 3 - - PDF document
ENGINEERING PROJECT THE FUTURE, INNOVATING AT PRESENT. Index 2 Company 3 Experience 5 Roads and Highways 5 Public Transport Infrastructure 8 Environment and Water 12 Ports and Coasts 14 Town planning 18
ENGINEERING
3 COMAYPA provides its technicians services to public and private clients, in the national and international area. Throughout its 30 years of history, the company has gradually expanded its business areas and currently develops complex engineering and architectural projects.
Professionalism and experience. GUARANTEE OF SUCCESS
Transformation of “del Mar” Avenue (Castellón). Before and after the construction of the pallet booked (TRAM)
Our company has an important multidisciplinary human team, with 8 different degrees: Civil Engineers, Industrial Engineers, Environmental Engineers, Geologists, Chemists, Public Works Engineers, Engineers Surveyors and senior technicians in development and implementation of construction projects. We also have regular collaboration of experts in diverse subjects such renowned Architects, Agronomists, Aeronautical, etc. In the area of material resources, it has evolved to have high technology, incorporating a computer system with extensive services and equipped with the latest updates, including developing own programs which are processed all stages involved in Engineering and Geotechnics field, as well as modern means of production and analysis that made allow global approaches and get the best solutions.
2010 2012
4
EFFORT TO INNOVATION AND CONTINUOUS IMPROVEMENT.
It applies in all our processes an integrated management system articulated according to ISO 9001 and ISO 14001. It is a betting to continuous improvement, boost staff training, orientation to quality, respect for the environment and work
developing its own R + D + I, in collaboration with universities and official agencies
FULL SERVICE
5
Roads and Highways
The competitiveness of a territory is based on modern transport infrastructure, roads with sufficient capacity to interconnect big productive, logistics and population centres, in a fast, safe and effective way. The quality in planning, design and construction of these facilities is essential for its later exploitation and conservation. Design and Project of over 100 km of dual carriageway. Technical Assistance to the construction management of over 100 km of dual carriageway service. Geotechnical studies for new construction projects or enlargement and improvement project of more than 300 km of dual carriageway.
New Castellón - Benicassim road axis connecting. Castellón. Improving road safety in the CV-16, section between the CV-10 and CV-160, San Juan de Moro. Castellón.
6
Castellón - La Pobla Tornesa Dual carriageway. CV-238 Road. Castellón - South Borriol New expressway Castellón - Grao and roadway reserved for public transport.
7 OUTSTANDING REFERENCES
Projects: Basic project: CV-100 conditioning from pk 5 +000 to 9 +000 in Rosell (Castellón) Construction Project: Variant of San Rafael del Rio (Castellón). Improving Access Platform and reordering N-238. Vinaroz-Uldecona, between KP 0 +000 to 2 +500. Castellón Province. Expansion and improvement of layout of CV-173 from Ballestar Pobla to Mosqueruela, Villafranca del Cid. Modified Project 1 of connection vial between Peñiscola and Benicarló in Peñiscola. Peñiscola Benicarló connecting road project in Benicarló municipality. Modified Project 1 of the road axis Castellón Benicasim. Bridge over Mijares River in Ribesalbes Project. Project of layout improvement of CV-170 pk 5 +000 to 7 +000 in Useras (Castellón) Via Park CV-18 KP 8 +050 to 14 +700 Project. Technical Assistance Project Management: Improving Safety road in the CV-20, KP 0 +200 to 3 +500. Villarreal. Castellón Province Improving road safety in the CV-20, pk 5 +200 to 8 +000. Onda (Castellón) Benicàssim - Castellón new road, on the stretch of west road, road “La Ralla”. Benicàssim - Castellón new road, on the stretch of road “La Ralla”- Old railway. Puebla Tornesa - Castellón motorway CV-238, on the stretch of road Castellón- south Borriol CS-800 road from PK 2 +700 to 32 +600 Pobla Tornesa-Albocacer. New Ares - Morella Road. Maintenance Road, dependent of Infrastructure Department of Castellón. Years 1994-1996 1997-1999, 1999- 2002, 2002-2005, 2005-2007, 2008-2009 and 2009-2012.
Improving road safety in CV-16, on the stretch of road between CV-10 and CV-160. San Juan de Moro.
(Castellón Province) Improving road safety in CV-20, section Villareal. (Castellón)
Public transport infrastructure 8
Urban traffic is complicated today in most metropolitan areas of developed countries where congestion has become a daily problem difficult to solve. It is a problem that produces undesirable effects on drivers’ and pedestrians’ mobility. Breach timetables for public transport, increased travel time on public and private transport, air pollution and intolerable noise levels that they seriously affect health, are some of those effects. All this redounds in an evident decline of population welfare, but also it has its correlate in significant economic losses. One of the most effective responses to the problem of congestion lies in the extensive use of computer systems and telecommunications applied to traffic management, known as Intelligent Transportation Systems (ITS) are being an efficient support for citizens and for public institutions in an attempt to palliate the congestion problems of urban and intercity transport, not only helping to improve their mobility but making it more sustainable.
SPECIFIC SERVICES OFFERED:
Tracer and holdings studies. Study of disease to adjacent buildings. Pathologies and Rehabilitation’s Studies of structures. Geotechnical studies. Foundation design. Drafting Project. Construction Management. Quality control of materials.
Recinte Castellón station, to platform reserved for urban transport (TRAM). Del Mar Avenue – Columbretes Street. Castellón.
9
Bridge over Seco River, Platform reserved for public transport. Castellón. Platform reserved for public transport in Castellón.
10
Tunnel Construction under General Urrutia Street, T2 line. Valencia subway. Maristas Brothers Station Project. T2 Line. Valencia subway. T2 Line Valencia subway
11 OUTSTANDING REFERENCES
Projects: Drafting of Project: Maristas Brothers Station T2 Line Valencia subway. Network Managing entity of transports and ports of Generalitat. Valencia. 2008. Amended project 1 T2 Line subway south of Valencia. Amended project 1 Network Platforms reserved to Public Transport in Castellón on the stretch of road Uji- Ribalta. Amended project 1 Network Platforms reserved to Public Transport in Castellón on the stretch of road Ribalta Park Amended project 1 Network Platforms reserved to Public Transport in Castellón on the stretch of road Coloumbretes-Serradal. Works: Construction Management: Network Platforms reserved to Public Transport. Phase I. On the stretch of Columbretes-Serradal road. Castellón. C.I.T. 2011 Technical Assistance to Construction Management: Infrastructure Construction Line 2 Subway of Valencia. On the stretch of Ruzafa - Maristas Brothers. Valencia. Management Body of the transport network and Ports of
Technical Assistance to Construction Management: Network Platforms Subject and Public Transport in Castellón. Phase I. On the stretch of UJI-Ribalta Park. Castellón. C.I.T. 2008. Technical Assistance to Construction Management: Car ride Upgrading of Ribalta Park. Castellón. C.I.T. 2008. Geotechnical: Geotechnical study for drafting project of T2 line, Valencia subway. On the stretch of Ruzafa-Maristas
Geotechnical study for construction of the bridge over the Seco River, Network platforms reserved to public transport in Castellón. On the stretch of UJI-Ribalta Park. 2007. Screen Wall’s Geotechnical Study for the underpass, Network platforms reserved to public transport in Castellón. On the stretch I. Columbretes-Grao Castellón. 2010. Hermanos Maristas Station Project. T2 Line. Valencia subway.
ENVIRONMENT AND WATER 12
The effective management of a resource such as water, the design of the most efficient and friendly environment systems, coast protection and minimization of environmental impacts, are essential part of our understanding of engineering and contributing to the sustainable development. Design and Project of sewage treatment plants. Execution Control over 60 WWTP's and ETAP's. Execution Control of desalination plants. Geological, geomorphological and geotechnical projects boundaries. Maritime- terrestrial stability projects and water infrastructure projects (canalization of rivers, water supply and drainage pipes, etc).
SPECIFIC SERVICES OFFERED:
Supply designing and project, ETAP's, sanitations and WWTP's .. Equipment collection’s operational test, purification and desalination. Commissioning of ETAP's, EDAR's and desalination. Geological and geotechnical studies for linear hydraulic infrastructures. Evaluation, auscultation and instrumentation studies of dams and weirs. Environmental Impact Studies. Public Participation Plans. Landscaping Integration Studies. Environmental suitability. Integrated Environmental activities. Chilches ewage farm, Castellón Azaneta del Maestrat supply tank. Castellón.
Chilches water treatment plant
Azaneta del Maestrat storage reservoy. Casrellón
13 OUTSTANDING REFERENCES
Projects.
communities scattered of Culla, Les Useres, VallD'Alba and Benafigos. (Castellón). Works:
parishes and communities scattered of Culla, Les Useres, VallD'Alba and Benafigos. (Castellón).
Fraga Ravine channelling. Castellón. Cervol River channelling and bridges. Vinaroz
PORTS AND COSTS
14 Port and coastal projects, must be comprehensive, they have to consider all aspects to develop, without forgetting any. The ports importance as generating employment and wealth in countries must be balanced with need of urban spaces, environmental requirements increasingly more stringent, and more demanded by
integrated in ports, and its capacity to produce synergies that generate new activities with higher value added, surely, also has very positive effects to contemplate, with concentration and management of these activities, in different regions and cities in the world.
Maritime works projects (ports, marinas, dams, coastal dynamics...). Construction management. Port facilities projects (Fish Markets, industrial buildings...). New docks and shopping area at Denia Port. Alicante. SPECIFIC SERVICES OFFERED:
Coastline Regeneration and rehabilitation. Coastal cliffs sections Stabilize Studies with integrated solutions in the landscape. Geomorphological studies for maritime-terrestrial boundaries. Characterization of port dredging
15
New fishing dock and facilities at Vinaroz Sailing Club. New fishing dock and facilities at Vinaroz Sailing Club.
16
East dam Repairs of Benicarlo Port. Castellón.
Burriana Nova Marina Burriana Nova Marina
17 OUTSTANDING REFERENCES
Projects
2005.
Works:
Drafting Project and Construction Management: Drainage improvements in Vinaroz, Regeneration of west dam in Peñiscola, Repair of east Dam.
Castellón. 2005.
C.I.T. Coastal Division. 2003-2004.
Royal Sailing Club of Castellón
PLANNING
18 Urbanism is a discipline whose goal is the study of cities, from a holistic perspective, opposite the responsibility to study and manage urban systems. It is also the way that buildings and other population structures are organized, or the aggregation and forms to be distributed the populations in larger nuclei as cities.
SPECIFIC SERVICES OFFERED:
Urban planning. Integrated Action Plans. Service Networks. Construction and remodelling works.
Urbanization of Peñiscola promenade. Catellón Urbanization of Peñiscola Promenade. Urbanization of San Martin Ravine.
19 OUTSTANDING REFERENCES
Projects.
Works:
General Water Service Network of Montán (Castellón). C.I.T. 2009.
(Castellón). C.I.T. 2006.
Montán City Council. 2003.
Car Ride Urbanization. Ribalta Park. Castellón.
BUILDING
20 Our society demands public buildings where the aesthetics competes with functionality for which they were designed. This creates new spaces in which humans can develop their activities both physically and emotionally conditioned by its
architects and engineers who face in both its previous phases of design and project as during they construction. The development of new construction processes able to shaping it developed, the use of new materials and technologies and improving energy efficiency are some aspects that we consider to get the best results. In Comaypa S.A., we have the cooperation of important architectural team as cabinets of Ms Juilia Godes (District 10) and D. Ramon Pascual, with whom we have developed important architectural works.
Design and control of building work Projects, Construction Management: and quality control of underground parking More than 1,000 construction geotechnical studies. Structural calculations. SPECIFIC SERVICES OFFERED:
Urban planning Development Projects Public building projects, residential and industrial Geotechnical studies and calculation of foundations. Structural calculations. Calculation facility Application of renewable energy (geothermal, solar, etc.) Quality control facilities. Quality control building.
Commercial building in Burriana Nova Port. With Mr. Ramon Pascual
21
Fish Market of Benicarló.
Commercial building in the port of Castellón.
Gran Via Hospital of Castellón with Ms Julia Godes
22
Seniors residence with Ms. Julia Segorbe Godes Center for rehabilitation and social integration, Garden City, (Alicante) with Ms Julia Godes
23 Leading references:
Construction Management: Fish Market of Benicarlo and surroundings urbanization. To C.I.T Coastal division. 2005 Drafting Project and Construction Management: Ice factory. Burriana Port. Fishermen's Association of Burriana. 2000. Drafting Project and Construction Management: New facilities of Sailing Club of Castellón. 2001. Drafting Project and Construction Management: Construction and installation of the management and treatment plant of used tyres in Valld'Alba. Made for private individuals. Year 2001 Drafting Project: Fish Market at the Port of Peñiscola. Castellón. C.I.T. 2006. Drafting Project and Construction Management: Plant of spring water bottling expansion. Bejís, Castellón. 2000. Drafting Project: Construction of 2 houses, Torre Bellver residential estate, Oropesa. Castellón. 2000. Drafting project: Low Voltage Electrical Installation in Plant of spring water bottling. Bejís, Castellón. 2000.
Chalets and apartments in Font Nova residential state in Peñiscola. With Ms. Julia Godes
AIRPORTS
24 Airports are complex installations in which join different means of transport, passengers and goods. In its design and construction are necessary multidisciplinary teams that covering all areas of engineering and architecture. COMAYPA, throughout his career, has been involved in the expansion and modernization of the Spanish airport network and has extensive experience in its quality control. OUTSTANDING REFERENCES
In the different phases of Castellón airport Project (previous studies, execution and reception) have been made in summary the following actions.
Technical Assistance for the calculation and design of foundations. Technical Assistance for the design of the landing runway. Soundings pavement. Geotechnical studies of each of the structures. Geological study for determining three-dimensional cavities. Materials quality control. Launch facilities control.
SPECIFIC SERVICES OFFERED:
Architecture, structure and installations. Flexible and rigid pavement Design and studies of working formulas. Acoustic studies. Geotechnical Studies. Hydrogeological Studies. Materials Quality control. Testing Service. Technical Assistance to the Construction Management. Construction Management.
Castellón Airport.
25
Landing Runway. Castellón Airport. Control Tower. Castellón Airport. Passengers Terminal, Castellón Airport. Control Tower. Castellón Airport.
Geotechnical Engineering. 26
The adequate knowledge of the geological and geotechnical environment in which the infrastructure are located, is a prerequisite for the development of the best designs, making profitable investments and optimizing resources. This process requires a great specialization and accuracy in all its phases, from the design of appropriate field campaigns adapted to the geological environment, through the successful completion of the surveys, in situ testing, sampling and laboratory testing, interpretation of the evidence, to finally get the conclusions that will determine the design of the planned infrastructure. In this process experience is not only a plus but is an indispensable requirement for the highest quality in designs.
More than 1,000 geological-geotechnical studies in all areas of civil engineering and building. Screen wall design. Design of piles and micropiles. SPECIFIC SERVICES OFFERED:
Geotechnical surveys on pontoons. Characterization and modelization of land for any proposed infrastructure. Study and analysis of the behavior of the ground (hydrogeological tensodeformacional, etc.) And finite element modeling. Studies slope stability and stabilization design. Studies ground improvement. Geological-geotechnical studies for:
Design and calculation of deep foundations. Design and calculation of tunnels and false tunnels. Repair East Dam. Benicarló Port. Castellón.
Slope Stabilization bordering to the College
Pile wall, underpass of the Platform Reserved Public transport of Castellón.
27 Leading references:
Geological and geotechnical study of the riverbed and the slopes affected by Cervol River channelling works where it flows into the sea in Vinaroz. Made for SACYR-TORRESCAMARA UTE. Year 2004. Geotechnical study to determine the geomechanical parameters for foundation of machine of muddy terrain, clay and low bearing capacity processes, under the influence of the ground water level. Made for UBE ChemicalEurope. 2006. Study for slope stabilization movement in presence of clay materials with upwelling ground water level and upwelling with large volume of land involved, and with electrical installations affected. Made for the City of Sueras. Year 2006. Determination of geomechanical parameters for foundation of storage tanks in fine and granular ground with high risk of liquefaction in port facilities designed to explanadas for industrial buildings. Slope stability study for the implementation of the necessary excavation for Channelling works in Fraga Ravine in Castellón (sporadic stream channel). Made for Pavasal. Year 2009. Writing project for the analysis and dimensioning of the gateway for pipeline detour. Made for UTE Pavasal-FCC. Year 2009. Emergency Work: landslide correction of N-234 Viver-Castellón road, using analysis of slope stability, with design and calculation of the retaining wall.
REHABILITATION AND PATHOLOGY 28
More than 30 years of experience in the field, allows us to confront the growing demand for this type of action. At each stage
anticipate and plan properly for problems associated with each type of construction, always looking for the best performance in terms security, economy and conservation Pathologies study and materials analysis of all types of building structures and civil works (hospitals, shopping centers, bridges, tunnels, dams...).
Leading references:
Pathologies study at Municipal Theatre of Castellón building. Made for the city of Castellón. Year 2000.
Technical assistance and supervision to the works of reform and rehabilitation at Provincial Hospital of Castellon facilities.
Year 2000. Reform and Rehabilitation of facilities Provincial Hospital of Castellon. Pathology Municipal Theatre of Castellón
Materials Technology
29
.
To know the properties of building materials, both in its use in construction phase and during its lifetime, are used different analysis techniques based on tests and standardized tests. The proper realization and interpretation of tests serves as a support for quality assurance and durability of the work or to design actions of repair or reinforcement. In this sense it has significant resources and staff wide experience after more than 30 years of existence in this field.
Drawer for the south basin of the Port of Castellón. Facilities Indoor Pool. Jaume I University, Castellón.
AUSCULTATION 30
Auscultation allows us to evaluate the conditions under which is an infrastructure or building by using measurement systems that interfere in a very small operation and routine use.
SPECIFIC SERVICES OFFERED:
wire cells).
1 - Inclinometer Team. 2 - Piletest Team for auscultation of piles.
Installation of inclinometers for slope stability study of road N-232. Morella (Castellón) 1 2
31
32
33
34
35