Presented by William Ruoff
Presented by William Ruoff Underground Natural Gas, LP & - - PowerPoint PPT Presentation
Presented by William Ruoff Underground Natural Gas, LP & - - PowerPoint PPT Presentation
Presented by William Ruoff Underground Natural Gas, LP & Electric Damage Prevention Safety & Security Electronic Payment What is excavation? Excavation- Any op operat ion on in w hich eart art h, ro rock or r ot her r
Natural Gas, LP & Electric Safety & Security Underground Damage Prevention
Electronic Payment
What is excavation?
“Excavation”- Any op
- perat ion
- n … in w hich
eart art h, ro rock or r ot her r m at at eri rial al in t he gro round is m oved ed, rem em oved ed, or ot her erw ise se disp splaced ed by m eans of
- f any t ool
- ols, equipm ent or
- r explos
- sive,
including but not
- t lim it ed t o
- drilling, grading,
bor
- ring, m illing, t renching, t unneling, scraping,
t ree and root
- ot rem ov
- val, cable or
- r pipe plow
- w ing,
fence or
- r sign pos
- st inst allat ion
- n, pile driving,
w recking ng, razing ng, rend nding ng or m ovi ving ng any ny st ru ruct ure re or r m as ass m at at eri rial al…”
(Statute RSA374:48, Section I I I )
Hand Digging is Not Exempt
Do you plan to excavate within 100 feet of underground facilities on:
- Private Property
- Public Way
- Right-of-Way
- Easement
- Public Street or
- Any Other Public
Place
does not notify
- Municipal water,
sewer, electric and drainage.
– You must contact them directly.
- ALSO: Privately-
- wned facilities
should be marked by their owner.
To locate and identify underground facilities, an excavator must hand dig, pot hole, soft dig or vacuum excavate in the Toler erance Z e Zone except to remove pavement or with the approval of the underground utility
- wner or operator.
Electric
Telephone CATV
Municipal Projects Accounted For 26% Of The Violations Last Year.
Lack Of Communication Resulted In 22% Of The Violations Last Year.
- How does this get
accomplished? Writing, Phone, Fax, Email or Non Utility Report
DATE:
ZIP: a.m. p.m.
YES NO
YES NO NO
please attach a separate sheet.
Please submit the above information to the Safety Division by fax, e-mail or phone:
- 6. Was the utility notified of the problems?
YES, please provide name of person spoken to:
If additional remarks are necessary, or if you have pictures or other evidence to fully describe the incident referenced above,
- 2. Notification completed, location w as not marked
- 3. Pre-marked?
- 4. Operator's markings were incorrect
- 5. Facility operator failed to mark in a timely manner
PLEASE CHECK ONE OR MORE OF THE FOLLOWING:
- 1. DIG-SAFE NUMBER (if know n)
DAMAGE / INJURY:
DESCRIBE THE REASON FOR THIS COMPLAINT: EXCAVATION LOCATION:
IN A PUBLIC WAY ON PRIVATE PROPERTY
UTILITY COMPANY IMPACTED: DATE OF INCIDENT: TIME OF INCIDENT: LOCATION OF INCIDENT: CITY/TOWN & STATE: TELEPHONE #: PERSON REPORTING: MAILING ADDRESS:
NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION
REPORT OF PROBABLE VIOLATION OF UNDERGROUND UTILITY REGULATIONS AND/OR DAMAGE TO UNDERGROUND FACILIITES
Non-Utility Report
- No Dig Safe Ticket (44)
- I ncorrect Dig Safe Ticket
- Subcontractors Not On
Ticket (4.0% )
- Failure To Wait 72 Hours
- Failure To Renew Dig
Safe Ticket (16)
- Failure To Maintain Marks
- Failure To Excavate
Carefully (58)
- Assuming Depth Of
Facility (2% )
- Failure To Mark Within 72
Hours (46)
- Failure To Mark Using
Prescribed Methods
- Failure To Clearly
I ndicate Location (12)
- Failure To Mark in Correct
Color (1% )
- Failure To Mark Width Of
Facility (1% )
- Failure To Mark Changes
in Direction Or End (1% )
Em ergency S Sit uat at ion
Puc 802.04 “Emergency situation” means a sudden or unexpected occurrence involving a clear and imminent danger demanding immediate action to prevent
- r mitigate loss of, or
damage to, life, health, property, or essential public services.