Presentation of ZUE Group
April 2015
Presentation of ZUE Group Agenda Overview Activities Selected - - PowerPoint PPT Presentation
April 2015 Presentation of ZUE Group Agenda Overview Activities Selected Projects Employment & Equipment Financial Data African Projects 2 Highlights 22 years of experience in Experienced staff Works delivered all over
April 2015
Overview Activities Selected Projects Employment & Equipment Financial Data African Projects
2
3
investments realization
source of revenues, cash flow stabilization URBAN INFRASTRUCTURE RAILWAY INFRASTRUCTURE
conducted contracts
(Polish National Railways) connected with plans in scope of modernization the railway lines up to international range
construction of urban infrastructure
construction of railway infrastructure
urban infrastructure in Poland
railway infrastructure in Poland
employs over 860 people
specialized machinery park
ZUE SA is listed on the Stock Exchange in Warsaw
PLN 160 mln
the country
prestigious competitions such as the competition „Building of the Year” ENERGY INFRASTRUCTURE
distribution network operators and Polskie Sieci Elektroenergetyczne (transmission network operator) with plans in scope of modernization the power networks in line
4 Wisław Nowak
President of the Management Board General Director Wiesław Nowak is the founder of ZUE S.A. and its main shareholder, owning currently 62.53% of the Company shares. He is a graduate of the Faculty
automatics and It and electronics of the AGH university of Science and technology in Krakow, Poland. Since the establishment of ZUE S.A, he has acted as the president of the Management Board and General Director.
Member of the Management Board Maciej Nowak graduated at the Jagiellonian University
Law and Administration where he received the title
specializes in economic law, with particular focus
laws. Since 9th January 2014 he has operated as the Member of the Management Board.
Marcin Wiśniewski
V-ce President of the Management Board Marcin Wiśniewski graduated at the Cracow University of Science, Faculty of Construction Engineering, specialty of Technology and Organization and gained a master’s degree at the Cracow University of Science, faculty of Construction Engineering, specialty of Management and Marketing in Construction Industry. Since 1st February 2007 he has operated as the V-ce President of the Management Board
Jerzy Czeremuga
V-ce President of the Management Board Jerzy Czeremuga graduated from the Faculty
Engineering of the Cracow University of Technology. Since 1st January 2007, he has also been employed as Director of the Railway Works Unit of ZUE S.A. He has been Vice President
2011.
Anna Mroczek
Member of the Management Board Anna Mroczek has a university education. She has graduated from the Department of Management at the AGH University of Science and Technology in Cracow. In addition, she has completed postgraduate studies in tax consultancy and the accounting and finance at the Academy of Entrepreneurship and Management at the Cracow University of Economics.
a Councilor of the City of Cracow (VI term). She has been Management Board Member of ZUE S.A. since 24th December 2013.
Arkadiusz Wierciński
Member of the Management Board Arkadiusz Wierciński has a university education. He graduated from the University of Economics in Poznan - Major: Finance and Banking. In addition: CFA (Chartered Financial Analyst) charterholder and ACCA (Association of Chartered Certified Accountants) charterholder. Since 9th January 2014 he has been Management Board Member of ZUE S.A. since 9th January 2014.
62.53% 6.35% 6.51% 24.61%
Share in the share capital of ZUE S.A.
Wiesław Nowak Amplico OFE PKO Bankowy OFE Other
5
Construction
ZUE S.A.
Urban infrastructure building engineering Railway infrastructure (construction, railway traction renovation) Power engineering construction Railway infrastructure building engineering (railway works)
Designing
100% 100% The design company accomplishing the designs in scope of the rail transport
International Activities
51% 100% Acquisition and implementation of
Shareholder Number of shares Share in share capital Wiesław Nowak 14,400,320 62.53% Amplico OFE 1,461,659 6.35% PKO BP Bankowy OFE 1,500,000* 6.51%* Other 5,668,104 24.61% Total 23,030,083 100.00%
ZUE S.A. Shareholding Structure
* - Shareholding on the basis of the list of shareholders holding at least 5% of votes at the Ordinary General Meeting of ZUE of 18 June 2014 published in the current report 31/2014 of 18 June 2014.
ZUE S.A.
68 years of experience in the construction and modernisation of railway lines,
66 years of experience in the field of designing and engineering 22 years of experience in the field of urban infrastructure projects
6
enlargement towards suppliers
development and good relationships with clients and contractors
EMPLOYEES
VALUE FOR SHAREHOLDERS
EXPANSION TECHNOLOGICAL PROGRESS
Overview Activities Selected Projects Employment & Equipment Financial Data African Projects
7
8
Complicated modernization of railway stations like: Legionowo, Modlin, Nowy Dwor Mazowiecki, Malczyce, Western Opole.
Comprehensive execution of railway works, many year’s market experience, realization
(eg. Building a chosen section
main arterial Line from Cracow to Warsaw, modernization of E20 line in localizations: Kramsk, Kłodawa, Zamków, Mińsk Mazowiecki – Siedlce, Miedzyrzec – Biala Podlaska, modernization of E30 line on sections: Okmiany- Boleslawiec, Boleslawiec-Zebrzydowa, Dabrowa Niemodlinska –Opole, Oława-Lizawice, Malczyce – Szczedrzykowice,E65)
Comprehensive realization of Investment – from designing to realization of traction system together with the delivery of all requisite elements. (eg. E-20 section Siedlce-Lukow, Lukow – Miedzyrzec Podlaski)
9
New technologies of tram-track-ways construction which conduce to drawdown of the noise and reduce the vibration noise during tram passing.
First time in Poland, building a underground traction substation for tram in Cracow. Comprehensive realization
Investment – from designing to realization of traction system together with the delivery of all requisite elements. (eg. Warsaw: W-Z Line, Aleje Jerozolimskie. Cracow Fast Tram)
Permanent maintenance of tram – track ways, traction systems, traction substations and street lightening
Execution of permanent maintenance of tram infrastructure - as the first company in Poland we are the operator of power supply system for urban transport vehicles. Execution of permanent maintenance of street lightening in Cracow and incorporated cities
10
Initiation of innovative system of monitoring and supervision a tram infrastructure devices, production of switch point drivers, heating systems (Cracow, Warsaw).
The realization of pilot project of modernization on central arterial line (Psary) – to speed 300 km/h. Building, the first time in Poland, tram line in existing Tunnel about 1538 m length and equipped by advanced operating systems. Execution of track without junction – switchback to Gubalowka Mountain and to Zar Mountain.
In the scope of Works, we execute by own staff a building of street lightening, traffic signals, power engineering lines, telephone network and teletype service.
11
Technical facilities, specialized equipment and a carefully selected professional and experienced team, allows Group to conduct work across the country
Overview Activities Selected Projects Employment & Equipment Financial Data African Projects
12
13 (As standalone projects in the scope of designing)
Stage I – section Skierniewice - Lodz Widzew;
State border;
State border;
within the project FS 2006/PL/16/C/PA/001Modernization of railway line C-E 59 Miedzylesie – Wroclaw – Kostrzyn – Szczecin preliminary design – Phase I in Poland;
the modernization
the E-20 railway line Minsk Mazowiecki –Siedlce section.(Consortium Arcadis, BPK Poznan, Ardanuy in co-
street 110;
structure ) located over the A-2 highway Swiecko – Warszawa at km 163 .500 in the course of the railway line Wroclaw –Poznan at km 159.083 and Staroleka –Lubon line at km 2.847 in Lubon by Poznan;
Glogowska Street;
works included rebuilding according to technical instructions.
the Central Railway Line (no 4);
catenary (overhead) line 3kV for the 250 railway line Gdansk Glowny – Rumia, section Sopot – Gdynia Grabowek;
section Lancut-Przeworsk, stage 1 section Rzeszow-Jaroslaw.
14
Modernisation of the E 20 railway line within the Siedlce - Terespol section, Stage I, LOT A Siedlce - Lukow, 95.100 km to 118.450 km
Investor: PKP Polskie Linie Kolejowe S.A. (Polish National Railways) Project description:
Period of delivery: 5th May 2006 - 27th December 2007 Project net value: EUR 49 767 962.00
15
Reconstruction The Completion of the Construction Works Carried out within the Scope
Katowice.
Investor: Miejskie Przedsiębiorstwo Komunikacji Miejskiej in Tychy Project description: The material scope of the task included: a) construction of the „Tychy Lodowisko” station in the vicinity of Wyszynskiego St., b) construction of "Tychy Grota – Roweckiego” station at Gen. Grota – Roweckiego St., c) construction of "Tychy Aleja Bielska” station at Bielska St., d) Adaptation of "Tychy Zachodnie" station in the vicinity of Harcerska St. Period of delivery: 15th February 2011 – 30st August 2012 Project gross value: EUR 8 300 00.00 3rd Award in the Construction of the Year 2012 competition
16
Redevelopment of Katowice station network within the area of platforms 2, 3, and 4 carried out under the investment programme: "Upgrading of the tracks on lines no. 1, 137, 139 and of the infrastructure used to handle the passengers within the Katowice Osobowa Station”
Investor: Miejskie PKP Polskie Linie Kolejowe S.A. (National Urban Railways) Project description: The project was carried out in the centre of Katowice, the capital of the Silesian Province, the main centre of the Upper Silesian Industrial Basin. The investment project carried out by PRK constituted an important part of a major project including redevelopment of the PKP Railway Station, including a new building, underground city transport facility, Galeria Katowicka shopping mall and an underground car park for 1200 vehicles. The scale of the project made the upgrading of the Station one of the largest investments of this type in Central Europe. Its fulfilment completely changed the face of Katowice and life of its residents within just few consecutive years. Katowice Railway Station is one of the largest in
The purpose of the railway station infrastructure upgrading was to improve passenger safety and enhance train traffic at the station. As a result of the works, Katowice Station became the fourth in Poland fully covered platform hall. Panels of the modern roofing are supported on a high structure and provide protection to the passengers against adverse weather conditions and at the same time guarantee the transparent elements made of polycarbonates. Period of delivery: 22nd August 2011 – 31st August 2013 Project gross value: EUR 16 000 000.00 2rd Award in the Construction of the Year 2013 competition
17 Other railway projects
186 (section Zawiercie – Da̩browa Gornicza Za̩bkowice – Jaworzno Szczakowa);
Katy Wroclawskie;
Zgorzelec, section Wroclaw – Jelenia Góra & Smolec – Ka̩ty Wroclawskie;
section Pyskowice – Paczyna;
Labędy – Pyskowice as part of a project: Revitalization of the 132 railway line Gliwice Labędy – Strzelce Opolskie – Opole Groszowice;
Ciechanów;
Dzialdowo;
Szczedrzykowice;
Krakow, section Miechów – Słomniki;
(project LOT –A);
stage II, reconstruction of tracks on the Kolbuszowa station;
Towarowa – Jozefinoow, no 507 Warszawa Głowna Towarowa – Warszawa Goląbki & no 509 Warszawa Glowna Towarowa – Warszawa Gdanska;
Wroclaw – Opole – Miękinia station;
18 Other railway projects
the railway border crossing Lupkow-Medzilaborce with adaptation to the passenger traffic;
the railway line Spytkowice-Wadowice-Kalwaria Zebrzydowska;
Głowny Osobowy -II stage -platform 1,2,3;
level crossings
the section station Lowicz- station Jackowice with the construction of bypass roads on the line E-20 Warsaw- Poznan;
Boleslawiecki-Bolesławiec track No. 2 from km 28.300 to km 34.350;
Grodzisk Mazowiecki- Zawiercie;
the Lewin Brzeski station and the Opole Zachodnie station part of the modernization of the E-30 section Opole-Wroclaw;
A;
Swiete- Sroda Slaska track 1 and 2 from km 30.100 to 32.750;
Krakow-Medyka;
Regional Branch in Krakow, Part 3 order- total reconstruction of the bridge on line 94 Krakow Plaszow- Oswiecim at km 18.600;
along with monitoring the entrance to the tunnels and selection of rescue equipment for the fire;
19 Other railway projects
the railway border crossing Lupkow-Medzilaborce with adaptation to the passenger traffic;
Wegliniec-Bielawa Dolna, section Wegliniec-Pieńsk;
Wegliniec-Bielawa Dolna, section Wegliniec-Bielawa Dolna;
Boleslawiec-Zebrzydowa;
the railway line Spytkowice
Reconstruction, repair of railway tracks and station Wadowice. stage II "under the project: Construction of the water reservoir Swinna Poreba IIIB and IIIC tasks;
Krakow - Plaszow - Oswiecim with culvert under the road and drainage and slope profiling section ok 135,0 mb at track 2;
"Modernization of the railway line Warsaw - Lodz, Stage Skierniewice - Lodz Widzew;
in Nowy Sacz;
reconstruction of the railroad station Kolbuszowa;
station Miekinia track 1 and 2;
Ciechanow area. Golotczyzna-Ciechanow;
area of LCS Ciechanow LOT A – station Gasocin, station Ciechanow;
LCS Ciechanow area" section Swiercze – Gasocin;
20 Other railway projects
Wroclaw – Legnica, section SSroda Slaaska – Malczyce, Malczyce station;
Paczyna;
Okmiany Boleslawiec;
Zebrzydowa-Wegliniec;
Dabrowa Gornicza. Stage I Tychy – Katowice;
Legnica - Wroclaw - Opole - reconstruction of track No. 1 route Jelcz Miloszyce- Czernica - Wroclaw with track No. 1, 2, 3 Czernica Wroclaw station on the railway line CE 30 277 Opole Groszkowice
Brochow with accompanying works;
the railway border crossing Łupkow-Medzilaborce with adaptation to the passenger traffic;
line in track 1 and track 2 Pyskowice - Paczyna to km 44.480 and strengthening the substructure in tracks 1 and 2 at km 43.100 - 43,500 on the line 132 as part of the investment project "Revitalization of the railway line No 132 / 135
the area Dzialdowo "trail Gralewo - Rybno Pomorskie;
"Rybnik" SA with corresponding infrastructure.
21
Design and construction of a fast tram line in the existing tunnel between Mogilskie Roundabout and Pawia street in Cracow together with the finishing of the tunnel
Investor: Agencja Rozwoju Miasta S.A. (Town Development Agency), representing the City of Cracow Project description: The scope of work included the construction of a tram tunnel in compliance with the current fire protection standards, including the tram track and mounting of the power catenary in the
installation of operational systems enabling its proper operation. The tunnel intended for public transport is a part of the Cracow Fast Tram line, which will noticeably reduce travel time on the Kurdwanow - Krowodrza Gorka route. Thanks to the tram stop being located under the Central Railway Station in the centre of the city, it is possible to get directly and quickly to the bus station, railway station and the shopping
University of Technology at Pawia street, is of great convenience to students using local public transport. Period of delivery: 17th July 2007 - 9th October 2008 Contract gross value: EUR 40 000 000,00 Construction of the Year 2008
22
Reconstruction of Lubicz street with a separate tram and bus lane, reconstruction of Rakowicka street with a terminal loop and repair of the resistance walls by Lubicz street
Investor: Miejskie Przedsiębiorstwo Komunikacyjne S.A. (Municipal Transport Company) in Cracow Project description: The project scope of delivery included, among others, tram track with a hub, catenary grid, traffic lights at the junction of Lubicz and Rakowiecka streets, track switch control and heating on the hub and underground reinforcement. The renovation of Rakowiecka street included the tram track, catenary grid, street lighting (stylish posts) and underground reinforcement. Furthermore, the project included repair and preservation works of the historical resistance walls with a total surface of 1 594 m2, including renovation of the railway viaduct. Period of delivery: 19th June 2006 - 13th December 2006 Project gross value: EUR 8 500 000.00 Modernization of the Year 2006
23
Modernisation of the tram route in the section of Aleje Jerozolimskie from the Banacha terminal loop to the Goclawek terminal loop
Investor: Tramwaje Warszawskie Sp. z o.o. Project description : Modernization of tracks and platforms (with the use of up-to-date technologies in the form of vibration-absorbing mats reducing the noise level and shortening travel times), repair of the catenary network and modernization of catenary substations, as well as the power wiring system the route includes the following street sections: Grojecka, Aleje Jerozolimskie, 3-go Maja, ks. Jozefa Poniatowskiego, Jerzego Waszyngtona and Grochowska – from the Banacha to Goclawek terminal loop Period of delivery: 27th April 2007 - 15th November 2007 Project gross value: EUR 19 500 000,00
24
City Transport Infrastructure Project - Construction of Fast Tram Infrastructure in zone 1, 4, 5, 6 in Cracow
Investor: Budimex Dromex S.A. Project description:
Period of delivery: 31st July 2006 - 31st May 2008 Project gross value: EUR 13 200 000,00
25
Repair and extension of the W-Z tram line in Warsaw, stage 1 - section of Wolska street and al. Solidarnosci from Wolski Cemetery to al. Jana Pawła II
Investor: Tramwaje Warszawskie Sp. z o.o. (Warsaw Trams PTY Limited) Project description:
Period of delivery: 9th May 2008 - 30th June 2009 Project gross value: EUR 18 600 000,00 3rd Award in the Construction of the Year 2009 competition
26
Reconstruction of Franciszkańska and Dominikańska streets in Cracow with tram tracks
Investor: Miejskie Przedsiębiorstwo Komunikacyjne S.A. (Municipal Transport Company) in Cracow Project description: The scope of works included the section from the junction of Dominikanska and sw. Gertrudy streets to the junction
Franciszkanska, Straszewskiego and Zwierzyniecka streets. Also, the road and tram track at Straszewskiego street was renovated up to the junction with Pilsudskiego street. Modern solutions were applied to the track, including vibration absorbing mats. Prior to the repairs, the vibrations inflicted damage to historical buildings situated along Franciszkanska and Dominikanska streets. Tram track switches were also replaced at the junction of Franciszkanska, Zwierzyniecka and Straszewskiego streets. Within the investment, passenger information boards were installed at the tram stops. Apart from modernization of the tram track, pavement and road surface were also repaired, together with the installation of stylish lighting. Period of delivery: 7th July 2010 - 30th November 2010 Project gross value: EUR 5 100 00,00
27
ZUE Group – power engineering projects in the field of High Voltage
110 kV
line in Cracow, connecting Cracow agglomeration with Elektrociepłownia Skawina (Power Plant Skawina) under the communication project including the control and supervision system executed by ZUE S.A. The value of the project amounted 150 million PLN. The scope of works associated with the reconstruction of this line comprised of: Dismantling of the old lines and poles Installation of foundations for tubular poles using the piling technology Installation of pass-through and robust tubular poles including insulation fittings Tightening works including mounting of AACSR/AW SS-72F 150/30 ASLH-D(S)bb 2x48 SMF lightning arrester wire and AFL-8 525 mm working wires;
station (in Zielona Gora locality);
line including the development of technical and economic analysis;
easement) for the planned investment of 110 kV line S-458 within the below project: “Construction of 110 kV overhead line [S-458] (from 220/110 kV Polkowice station to pole No. 54 of the existing S-452 line.”
28
ZUE Group executes the project for the Polish Power System Operator, i.e. Polskie Sieci Elektroenergetyczne S.A. (Polish Power Grid S.A.) in the scope of construction
ZUE Group recently acquired the contract for construction of a 400 kV power line that constitutes the task called “Construction of double circuit 400 kV line from Kozienice to Oltarzew” The value of the project amounts to EUR 137,4 million and is the largest task assigned for implementation by the PSE and is included on the list of contracts of the highest priority. The contract will be completed until 30 June 2019, approximately 350 supporting structures with a total weight of approximately 17 thousand tons will be erected. This task is carried out in a “turnkey” fashion including the responsibility of settling the ownership issues along the newly constructed HV line. Planning and design work will be completed by ZUE Group . until mid-2017, and totality of construction work will be completed within the period of 15 months. The approximate length of the power line will be 131 km but due to its location in the vicinity of Warsaw agglomeration and the ongoing planning work (location of line routing), ZUE Group takes the possibility of substantial delay into account. Polskie Sieci Elektroenergetyczne S.A. (Polish Power Grid S.A.) entrusting the implementation of such a large contract of national importance, while carefully examining our company feasibility of implementing the said contract on the stage
necessary to implement such complex and responsible investment. ZUE Group has the necessary technical staff of linemen and fitters as well as construction engineers, and a design group that carries out tasks ranging from conceptual work, planning through construction designs and executive designs and including construction of power lines and power substations.
29
Foreign projects (as a subcontractor)
Egypt 1987 – 1990 Construction of new railway line in Egypt (SOHAG - NIGA - HAMMADY – FEW) of the total length of 205 km covering laying the tracks on the trail, stations and installation 250 pieces of railway crossovers. Tanzania 1994 - 2000 Modernization and welding of the rails on a railway line Frigate Dar Es Salaam - Ifakara-Makambako in length 677 km, covering the pin welding of rails in the amount of 97.5 thousand pieces, regulation, profiling, shilling and annealing of tracks.
Overview Activities Selected Projects Employment & Equipment Financial Data African Projects
30
31
The employees are the foundation of each enterprise and act as its most valuable asset. The staff employed in the ZUE Group is comprised of high-class engineers, specialists and professionals of the specific fields. The professionalism and commitment of the staff correlates with the top level of services provided by the ZUE Group, increasing its credibility and contributing to the reinforcement of its competitive advantage on the market.
Management & Administration 128 Marketing 19 Production 562 Engineers & Technicians 121
Scope of activity (2013)
Primary 85 Vocational 237 Secondary 242 Academic 266
Education (2013)
32
As one of its advantages, the ZUE Group offers a great flexibility of its operations. Both the vehicle fleet and equipment, which can be successfully used for the construction of city and railroad infrastructure, allow delivering projects on these markets, enable the further development of the entire Group in the mentioned sectors. The ZUE Group is an owner of almost 300 equipment units. The Group in their own resources have machines such as wheel excavators, backhoe loaders, telehandlers, wheel loaders, trucks, aerial platforms, the catenary works trains etc., as well as finer construction equipment such as tamping machines, all kind of welders and power generators. This provides a complete hardware independence from external companies.
Piling machine „Mecalac” multipurpose excavator „UNIMOG” multipurpose vehicle „Manitou” telehandler „Liebeherr” excavator
33
The catenary works train Locomotive SM-42 Rail tamping tram works machine Plasser Beaver Junior-4S Machine for conservation and laying
Rail tamping machine Plasser & Theurer 08-275SP
34 ThyssenKrupp – procurement of material for railway and tramway lines Vossloh Cogifer - procurement of material for railway lines Voestalpine - procurement of material for railway lines Siemens – procurement of electronic equipment for railway and tramway lines OHL – co-operation in construction projects Strabag – co-operation in construction projects Bilfinger – co-operation in construction projects Skanska – co-operation in construction projects
Overview Activities Selected Projects Employment & Equipment Financial Data African Projects
35
36
Statement of Comprehensive Income of ZUE Group - Excerpt
Profitability ratios 2009* 2010 2011 2012 2013 Gross margin 10.9% 10.2% 8.5% 4.3% 5.5% EBITDA profitability 8.6% 8.2% 6.8% 1.9% 3.5% EBIT profitability 6.9% 6.5% 5.5% 0.5% 1.7% Gross profit margin 3.7% 5.3% 5.2% 0.7% 1.8% Net profit margin 3.0% 4.4% 4.1% 0.5% 1.4% ROA 4.8% 4.1% 5.1% 0.5% 1.4% ROE 17.6% 10.5% 11.7% 1.2% 2.9% * provisory consolidation estimating the hypothetical gaining of control over Przedsiębiorstwo Robót Komunikacyjnych w Krakowie S.A. (Communication Works Company in Krakow S.A.) by ZUE S.A. as of 1st January 2009 (factually occurred as of 6th January 2010), including the loan interest due to the funding of acquisition of PRK w Krakowie S.A. shares, amounting to EUR 1,4 million. ‘000 EUR Specification 2009* 2010 2011 2012 2013 2014 Sales 87 657 99 046 118 942 126 740 98 994 153 756 Gross profit on sales 9 548 10 101 10 151 5432 5 472 8 157 Administrative expenses 4 289 3 735 4 165 4306 4 759 4 135 EBITDA 7 532 8 169 8 052 2471 3 501 5 357 EBIT 6 030 6 468 6 497 697 1 682 3 340 Gross profit 3 319 5 340 6 187 881 1 802 3 366 Net profit 2 616 4 335 4 905 588 1 352 2 544
37
Specification 2009* 2010 2011 2012 2013 Non-current assets 31 716 33 970 30 960 44 215 35 535 Current assets 23 014 71 829 65 597 70 323 60 652 Total assets 54 730 105 799 96 557 114 537 96 187 Share capital 974 1 389 1 245 13 453 1 388 Total equity 14 858 41 332 41 965 45 943 46 068 Non-current liabilities 23 956 11 318 9 862 15 228 12 226 Current liabilities 15 915 53 148 44 730 53 365 37 893 Total liabilities 39 872 64 467 54 591 68 594 50 119
Statement of Financial Position of ZUE Group - Excerpt
‘000 EUR * provisory consolidation estimating the hypothetical gaining of control over Przedsiębiorstwo Robót Komunikacyjnych w Krakowie S.A. by ZUE S.A. as of 1st January 2009 (factually
Gearing ratios 2009* 2010 2011 2012 2013 Debt ratio 0.7 0.6 0.6 0.6 0.5 Debt to equity 2.7 1.6 1.3 1.5 1.1 Equity to total assets 0.3 0.4 0.4 0.4 0.5 Short -term debt 0.3 0.5 0.5 0.5 0.4 Long -term debt 0.4 0.1 0.1 0.1 0.1 Liquidity ratios 2009* 2010 2011 2012 2013 Working capital (‘000 PLN) 7 098 18 681 20 867 16 957 22 760 Curent ratio 1.5 1.4 1.5 1.3 1.6 Quick ratio 1.4 1.3 1.4 1.2 1.5
Overview Activities Selected Projects Employment & Equipment Financial Data African Projects
38
RTI Kenya
39
ZUE Group / RTI Holding
RTI Germany EPG Eisenbahn-und Bauplanungs-Gesellschaft mbH Schüßler-Plan GmbH BIUP Sp. z o.o. BPK Poznań Sp. z o.o.
Structure optimization of RTI Poland Group (part of ZUE Group) for African projects:
1/ Contractual and legal requirement of setting up a legal entity in Kenya
Legal setup of a RTI Kenya Ltd as a daughter company of RTI Poland
Nairobi will be used as headquarter because of the good logistic and technology systems. It is much easier to reach, to handle legally and it is less expensive. Time frame: up to 6-8 weeks
2/ Contractual and legal requirement of setting up a legal entity in the Republic of South Sudan – in progress
Legal setup of a RTI RSS Ltd as a daughter company of RTI Kenya
Time frame after setup of the legal mother company in Kenya: app. 4 weeks
RTI RSS
40
Grupa ZUE Address 30-048 Cracow, Kazimierza Czapinskiego 3 St. Telephone +48 12 266 39 39 Fax +48 12 269 35 89 Web site www.grupazue.pl E-mail zue@zue.krakow.pl RTI Germany GmbH Address 20149 Hamburg, Hallerstr. 89 Telephone +49 40 854 147 67 Fax +49 40 547 658 01 E-mail rti@rti-germany.de
This presentation (the "Presentation") has been made available to the addressees for only informational purposes and can not be reproduced, communicated or transmitted, in whole or in part, to any other person, for any purpose. The purpose of this Presentation is to present some information about the ZUE S.A. company (the ”Company”). This Presentation does not constitute or contain an offer for sale or invitation to subscribe for or purchase any securities of the Company or its other financial instruments in any jurisdiction. This document is neither advice nor a recommendation in relation to any financial instruments. Therefore, this Presentation does not constitute basis and should not be used, in whole or in part, to take any investment decisions, in particular concerning the conclusion of any agreement, legal disposition or taking an obligation on oneself. Any investment decisions in the Company’s securities should be made solely on the basis of the content of the issue prospectus approved by the Financial Supervisory Authority (with any appendixes), which is the only legally binding document containing information about the Company and its securities. Neither the company nor its shareholders or members of its corporate bodies or entities related to the Company or any persons acting on behalf of the Company, do not bear responsibility for the completeness or accuracy of the information or
constituting any direct or implied declarations or warranties of the Company, its shareholders, members of its bodies, the Company's affiliates or other persons acting on behalf of the Company. Therefore none of the above mentioned persons shall not be liable in any way for any loss or damage which may arise from the use of this presentation or its content. Certain information in this presentation has been obtained from third parties that the Company believes to be reliable, however, the Company has not engaged in verification and does not guarantee the accuracy or completeness of such information. All information introduced in this Presentation are confidential and cannot be disclosed to third parties without the prior written consent of the Company Neither this Presentation nor any part or copies thereof may not be transferred or sent to the United States of America, Australia, Canada or Japan. Distribution of this document in other jurisdictions may be restricted by the law and persons who will get into possession of this document should obtain information on such restrictions and obey them. This presentation may contain forward-looking statements, relating in particular to the Company's strategy, development of its business, market forecasts, Company’s planned capital expenditure or its future revenues. These statements inherently involve risk and uncertainty, and neither the Company nor its shareholders or members of its bodies’ or the Company's affiliates or any persons acting on behalf of the Company do not ensure that these projections will be met. All the Projects Gross Value amounts in this Presentation are calculated at the average 4.2 PLN. to 1 EUR exchange rate and rounded.
41