PAX_SOLUTIONS IMO2020 EMISSIONS MANAGEMENT October 2018 OUTLINE IMO2020 BACKGROUND Effective 1st Jan 2020, IMO will impose a 100% compliance to 0.5% Sulphur emissions globally. Compliance monitored by port state authorities (USCG etc).
October 2018
IMO2020 BACKGROUND
Effective 1st Jan 2020, IMO will impose a 100% compliance to 0.5% Sulphur emissions globally. Compliance monitored by port state authorities (USCG etc). Non-compliant vessels to prove they could not secure compliant fuels. Enforcement methods and penalties (vessel detention, fines or commercial restrictions) are not
ECONOMICS
EMISSIONS REGULATIONS
profile overnight from 1 Jan 2020.
barrel/day (155million tonnes/year) switch.
and 0.1/0.5% S fuels.
fuels may play increasing role.
Courtesy: Shell
Fuels/Technologies Pros Cons Low sulphur distillate fuels
FO storage, systems, boiler, etc. Exhaust Gas Cleaning Systems (EGCS)
price differential
LNG and other alternative fuels
tank Low sulphur ‘hybrid’ fuels
vessels
conventional fuels
fuel standard
EMISSIONS REGULATIONS – GLOBAL & REGIONAL
Effective & Phase-in Dates
most effective way … ban the carriage of fuel exceeding 0.5%S …”
urgent item Courtesy: ABS
Corporate Office : No. 1 Kim Seng Promenade #07-02 Singapore 237994 Tel : (65) 6737 7300 Email : marketing@paxocean.com
PaxOcean Group
Kuok Singapore Limited
SINGAPORE CHINA CHINA BATAM
Marketing & Commercial Procurement Engineering & Design
PaxOcean Engineering Pte Ltd
PaxOcean Holdings Pte Ltd (PHPL) PaxOcean Batam PaxOcean Zhoushan PaxOcean Zhuhai PaxOcean Singapore
Newbuilding Ship Repairs & Conversion O&G and Offshore Activities Legend
PaxOcean Singapore PaxOcean Zhuhai PaxOcean Graha
Zhoushan, China Zhuhai, China Singapore Batam, Indonesia
PaxOcean Zhoushan PaxOcean Pertama PaxOcean Nanindah
Total Area: 110,000 m2
Docking up to Handymax-Sized Vessels Afloat repairs up to Panamax-Sized Vessels
Floating Dock
DOCK LENGTH WIDTH TLC
122 M 22 M 3,400
195 M 34 M 16,000
187 M 36 M 16,000
1 2 3
Total Area: 272,000 m2 Floating Dock
DOCK LENGTH WIDTH TLC
97 M 24 M 3,200
186 M 36 M 16,000 Dock V 235 M 40 M 22,000
Docking up to Panamax-Sized Vessels Afloat repairs up to VLCC-Sized Vessels
Total Area: 495,000 m2
Building Berths 3 nos. 80 M x 80 M 2 nos. 170 M x 50 M Berth 455 M Equipment Mobile cranes up to 1,250 T
Building Berths
Total Area: 546,000 m2
Berthing Wharf 2,500 M Workshop Area 31,900 M2 Equipment Cranes up to 600 tons SWL
Building Berths
Total Area: 800,000 m2 Graving Dock
DOCK LENGTH WIDTH Central 400 M 106 M West 380 M 80 M
900T Crane
Total Area: 200,000 m2 Covered Launchways
LAUNCHWAY LENGTH WIDTH
210 M 27 M
210 M 27 M
110 M 38 M
3 1 2
Across major vessel classes, including
“Aurora V” 56m RoRo/Passenger Ship “Ocean Swagman” 8,000m2 Livestock Carrier Jack-Up Rig L209 CJ46 Drilling Jack-Up Barge
“Posh Bawean” Upgrading to Accommodation Vessel “Sea Good 101” Tanker to FPSO “Pearl River” Lengthening of Vessel “Frontier Duchess” Drillship Upgrading
“COSL 942” Jack Up Drilling Rig “Ore Brasil” 400,000 DWT VLOC “Leiv Eiriksson” Heavy Dredger
“Rio Illapel” 47,020 DWT Vehicle Carrier CSAV
PAX_SOLUTIONS – BWTS TRACK RECORD (RECENT 2 YEARS)
YEAR COMPANY VESSEL TYPE DWT COUNTRY MAKER SHIPYARDS
2017 Solvang ASA LPGC 18,110 Norway Optimarin PaxOcean Singapore 2017 Hartmann Schiffahrts Gmbg & Co KG LPGC 9,133 Germany Qingdao Headway Technology PaxOcean Singapore 2018 Mediterranean Shipping Company Container 117,247 Italy Alfa Lava PaxOcean Zhoushan 2018 Mediterranean Shipping Company Container 73,355 Italy Alfa Lava PaxOcean Zhoushan 2018 Ahrenkiel Steamship GmbH & Co.KG Container 55,313 Germany Optimarin PaxOcean Zhoushan 2018 SDSC Ship Management Co., Ltd. Bulk Carrier 94,710 China Sun-Rui PaxOcean Zhoushan 2018 SITC Ships Management Co.,Ltd Bulk Carrier 76,202 China Sun-Rui PaxOcean Zhoushan 2018 John T. Essberger Gmbh & Co. KG Bulk Carrier 34,274 Germany Alfa Lava PaxOcean Singapore 2018 V-Ships Monaco Research Survey 1,506 United Kingdom Alfa Lava PaxOcean Singapore
SHIPYARDS SINGAPORE BATAM ZHOUSHAN CAPACITY 20 SCRUBBERS A YEAR 20 SCRUBBERS A YEAR 30 SCRUBBERS A YEAR AVAILABILITY FROM IMMEDIATE IMMEDIATE IMMEDIATE ON-SITE SCRUBBER FABRICATION/ ASSEMBLY YES YES YES RETROFITTING (Max. Size) BERTH – PANAMAX DOCK – SUPRAMAX BERTH – VLCC DOCK – PANAMAX BERTH – ULOC DOCK – ULOC CLASS (APPROVAL) ABS, DNV, LR, NK ABS, DNV, LR, NK ABS, DNV, LR, NK CURRENT ORDERS 5 5 10
PAX_SOLUTIONS – 3D SCANNING FOR SCRUBBER RETROFIT TRACK RECORD
YEAR VESSEL VESSEL TYPE DWT
Jun-2018 Pac Schedar General Cargo 26,406 Jul-2018 Ikan Bawal Bulk Carrier 83,476 Aug-2018 Jubilant Devotion Bulk Carrier 117,549 Aug-2018 Ikan Pulas Bulk Carrier 63,590 Aug-2018 Pac Suhail General Cargo 27,230 Sept-2018 Ikan Parang Bulk Carrier 56,618
EGCS Pros Cons Application
Open Loop
usually involve storage or handling of hazardous chemical (caustic soda)
equipment/system compared to closed loop
coastal/port areas
areas with washwater discharge restriction.
Closed Loop
in low alkalinity water; in discharge restricted coastal/port areas
duration that the tank volumes will permit
solution, a hazardous substance.
size
residue handling
constantly in areas with discharge restriction or low alkalinity Water
Hybrid
all regions regardless of seawater alkalinity or temperature
the duration that the tank volumes will permit
disposal for closed mode operation
handling
sea and discharge/
areas
OPEN LOOP EGC SYSTEM CLOSE LOOP EGC SYSTEM HYBRID EGC SYSTEM
Courtesy: ABS
MANUFACTURERS A B C D INTRODUCTION U-Type U-Type L_SH type, U-Type PROS Customized product is more compact. Long reference list. Customized product is more compact. Long reference list. Short Lead time Customized product is more compact. CONS Longer lead time due to customize and long order book Longer lead time due to customize and long order book Standard Product, heavy, and no flexible for sizing No long reference list PRICE RANGES (LR / Panamax) USD 1.4mil – USD 1.8mil USD 1.4mil – USD 1.8mil USD 1.0mil – USD 1.2mil USD 800k– USD 1.0mil (Conditions applies) DELIVERY SCHEDULES 18 – 20 Months 16 – 18 Months 12 – 15 Months 6 to 8 Months
Select Candidate Vessel Economic/feasibility Study Select EGCS Manufacturer Engineering Design Contract for EGCS Design & Fabrication Class Approval EGCS installation Commissioning/Testing After Sale Support
Pax_Solutions
3D Scanning / Pre-engineering
Task/ Schedule (week)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Pre-Study Finish 3D Scanning Basic & Detail Design Basic Design Approval Production Design Order EGCS, Design EGCS Sytem Fabrication Bulk Material Purchase Yard Pre-Fabrication Retrofit - Installation Commissioning / Test
EGCS Retrofit Work Schedule
Note: above schedule was based on Package D. The schedule subject time place order
3D Scan---Ideal for retrofitting work on existing ship
3D scan can be conducted prior to vessel arrival in shipyard A team of engineers are readily deployable to the ship anywhere in the world 3D scan can be conducted without affecting the normal ship routine 3D scan results can be incorporated into 3D Design for subsequent engineering works Engineering can work on the proposals or solutions while vessel is underway or working with Customer head office, or Technical office, or Ship crew No downtime required from the vessel for engineering
Pre-Study to Design Approval Procurement to Delivery of Scrubber Pre-Fabrication at Yard to Complete Installation & Testing
Arrange the Scrubber components into the existing ship systems
Pre-Study to Design Approval Procurement to Delivery of Scrubber Pre-Fabrication at Yard to Complete Installation & Testing
Pre-Study to Design Approval Procurement to Delivery of Scrubber Pre-Fabrication at Yard to Complete Installation & Testing
Exhaust Gas System Sea Water System
Approval requirements, managed by Pax_Solutions.
1 Exhaust gas cleaning system diagram 2 General arrangement 3 Engine room arrangement plan(Including funnel) 4 Piping diagram related to the EGCS 5 New added room/tanks construction and arrangement plan 6 Electrical system, electrical power balance chart, circuit current calculation, Ex-proof grade 7 Wiring diagram for main circuit of power supply 8 Test procedure for the EGCS on board 9 Others (if class consider it’s necessary) 10 EGCS Vendor will supply these documents: SECP -- Sox Emissions Compliance Plan ETM-B -- EGC system - Technical Manual for Scheme B OMM -- Onboard Monitoring Manual EGC Record Book
Pre-Study to Design Approval Procurement to Delivery of Scrubber Pre-Fabrication at Yard to Complete Installation & Testing
Order placed, monitoring of fabrication process and inspection of components before Vessel arrival
Open loop Scrubber for MR tanker Open loop Scrubber for VLCC – Main Engine & Boiler
Pre-Study to Design Approval Procurement to Delivery of Scrubber Pre-Fabrication at Yard to Complete Installation & Testing
All class approval drawings to be released to PaxOcean facilities for
Pre-Study to Design Approval Procurement to Delivery of Scrubber Pre-Fabrication at Yard to Complete Installation & Testing
EGCS – Execution from Design to Implementation
gas pipes, sea water pipes and other necessary accessories.
platform. Pre-Study to Design Approval Procurement to Delivery of Scrubber Pre-Fabrication at Yard to Complete Installation & Testing
SUBMIT LETTER OF INTEREST & COMPLETE LIST OF INTENDED VESSEL PAXOCEAN TO PROVIDE ENGINEERING OFFER AND HIGH LEVEL TURNKEY PAX_SOLUTIONS QUOTATIONS CONTRACT SIGNING (ENGINEERING SERVICES) 3D SCANNING & SELECTION OF MAKER PLACED ORDER TO BOOK FACILTIIES SLOT OF SHIPYARD AND SCRUBBER MAKER
WEEK 1 – WEEK 2 WEEK 1 – WEEK 2 WEEK 3 WEEK 3 – WEEK 4 WEEK 3 – WEEK 8