Orsu Metals Corporation A N A New Base & Precious Metal B - - PowerPoint PPT Presentation

orsu metals corporation
SMART_READER_LITE
LIVE PREVIEW

Orsu Metals Corporation A N A New Base & Precious Metal B - - PowerPoint PPT Presentation

Orsu Metals Corporation A N A New Base & Precious Metal B & P i M t l Mining, Development & Exploration Company AIM: OSU AIM: OSU TSX: OSU TSX: OSU www.orsumetals.com www.orsumetals.com 1 Cautionary Note This presentation


slide-1
SLIDE 1

A N B & P i M t l

Orsu Metals Corporation

A New Base & Precious Metal Mining, Development & Exploration Company AIM: OSU AIM: OSU

1

TSX: OSU TSX: OSU

www.orsumetals.com www.orsumetals.com

slide-2
SLIDE 2

Cautionary Note

This presentation may contain forward-looking statements relating to the future performance

  • f

Orsu Metals Corporation. Forward-looking t t t bj t t t i i k d t i ti d t l statements are subject to certain risks and uncertainties, and actual results may differ materially. These risks and uncertainties are detailed from time to time in the company’s filings with the appropriate securities p y g pp p commissions. All statements other than statements of historical fact, included herein, including without limitations, statements regarding potential mineralisation and exploration results production timing and cost mineralisation and exploration results, production timing and cost estimates, anticipated permitting results and timing and future plans, actions and objectives and achievements of Orsu Metals Corporation are forward-looking statements based on the estimates and opinions of Orsu Metals Corporation’s management at the time the statements were made.

2

made.

slide-3
SLIDE 3

Financial & Management Overview OCTOBER 2008

Shares Outstanding (TSX:OSU) (AIM:OSU)

456,934,226 issued shares as of 22/09/2008 637,296,746 fully diluted shares

Major Shareholders Capitalisation Table

US$ million Share price (CAD$0.29 as of 22/09/2008) Shares outstanding 456 934 226

Major Shareholders

Charlemagne Capital JP Morgan Roytor & Co Endeavour Financial Canaccord Capital Corp. Bay Pond Partners Shares outstanding 456,934,226 Options 44M @ C$0.35 - C$1.26 Warrants 136M @ C$0.75 - C$1.50 Market Capitalisation ~CAD$132M

Dr Sergey V Kurzin, British/Russian: Executive Chairman. Russian-born research engineer who moved to the United Kingdom in 1990 and has played a key role in initiatives to acquire and progress several important FSU mining assets including Bema Gold, UrAsia Energy, Oriel Resources and European Minerals. Takhirzhan T Baratov Kazakh: Executive Director Central Asia General Director of Oriel subsidiaries Muzbel LLP Takhirzhan T Baratov, Kazakh: Executive Director Central Asia. General Director of Oriel subsidiaries, Muzbel LLP and Voskhod-Oriel LLP. Involved with the mining industry since 1994. Advised and consulted UK and Canadian public companies and director of a number of JVs in Kazakhstan.

  • Dr. Alexander Yakubchuk, Russian: Director of Exploration. Exploration Manager, consultant & geologist with +14

years worldwide experience Recently Exploration Manager Europe and CIS for Gold Fields Discovered the years worldwide experience. Recently Exploration Manager, Europe and CIS for Gold Fields. Discovered the +3Moz Degdekan Au Deposit in Magadan, Russia and +5Moz Taldybulak Au-Cu deposit in Kyrgyzstan Randy Reichert, Canadian: COO. Previously Oriel Resources’ COO & was in charge of the commissioning &

  • perating the Tikhvin ferrochrome smelter, Russia; spent over 5 years in Russia with Bema Gold as General

Manager, Operations of the Kupol & Julietta gold mines in Chukotka and Magadan. g , p p & g g Petro Mychalkiw, British: CFO. Regional Finance Director of Oriel Resources, Kazakhstan in charge of tax planning, contract negotiations, financial reporting; secured 2006’s US$120m project financing deal for the Voskhod chrome project; Oriel’s Treasurer & Head of Corporate Finance. Mark Corra, Canadian: Non-Executive Director. Mr Corra holds the position of Senior VP Finance and CFO of

3

Mark Corra, Canadian: Non Executive Director. Mr Corra holds the position of Senior VP Finance and CFO of B2Gold Corp. Previously he worked for 17 years with Bema Gold Corporation. A Certified Management Accountant with a diploma in financial management from the British Columbia Institute of Technology, Mr Corra currently oversees financial reporting, cash management, tax planning and is a member of the management committee for B2Gold Corp.

slide-4
SLIDE 4

>3Moz Au and >1Mt Cu Deposits

Orsu Cu and Au projects

4

slide-5
SLIDE 5

Project Locations & Company Objectives

Project Locations:

  • Focussing on Former Soviet Union countries, primarily Kazakhstan & Kyrgyzstan

Project Locations: Focussing on Former Soviet Union countries, primarily Kazakhstan & Kyrgyzstan Objectives:

  • To fast track a vertically-integrated gold and base metal producing and exploration

company

  • Attain significant capital growth in 3 years
  • To achieve commercial production at the Varvarinskoye Mine in Kazakhstan
  • Definitive Feasibility Studies with two exploration projects (2009-2011)
  • Strong alliance with Gold Fields Exploration B.V. in Kyrgyzstan

Identify acquire and develop advanced stage projects which can be taken to DFS in 2 to

  • Identify, acquire and develop advanced stage projects which can be taken to DFS in 2 to

3 years after acquisition using an experienced exploration and development team

KAZAKHSTAN Karchiga Cu VMS Deposit (47.3km2) 374Mlb Cu Ind + Inf NI 43-101 Resource and LONDON Corporate Head Office Excellent Exploration Potential KAZAKHSTAN Varvarinskoye Au-Cu Skarn Deposit (202km2) KAZAKHSTAN Varvarinskoye Au-Cu Skarn Deposit (202km ) 2.2Moz Au + 254Mlb Cu Prov + Prob JORC Reserve in 5.01Moz Au + 607Mlb Cu Meas + Ind JORC Resource Start-up mine KYRGYZSTAN Talas Project (347km2 ) KYRGYZSTAN Talas Project (347km ) +20Moz Exploration Target Exploration Agreement With Gold Fields Exploration B.V. Taldybulak Cu-Au Porphyry 4.6Moz Au + 793Mlb Cu Ind + Inf NI 43-101 Resource

5

Not to scale

KYRGYZSTAN Tokhtazan Project (4km2 ) ~1Moz Resource & Upside Potential

slide-6
SLIDE 6

Varvarinskoye Mine

6

slide-7
SLIDE 7

Varvarinskoye

St t ti N b 2007

  • Start-up operation: November 2007
  • Proven & Probable Reserve: 2.2Moz

Au & 254Mlb Cu IN

  • Measured & Indicated JORC

Resource: 5.01Moz Au & 607Mlb Cu

  • Construction completed

Construction completed

  • Production has started, although

requires tuning 80% it hi d

  • 80% capacity achieved
  • 21koz Au and 3.5Mlb Cu produced

by 01.09.2008

  • Commercial completion Q1 2009

7

slide-8
SLIDE 8

Varvarinskoye Operations & Production

  • Multi-pit surface mine, standard western equipment and mining practices,
  • verall strip ratio 4.17:1 for life of project
  • Mill, standard processing technology, western equipment
  • 4 types of ore mined, 2 types of processes

yp , yp p

  • Copper-gold concentrate and gold doré produced

Ramp up phase

  • Ramp-up phase
  • Design capacity of 4.2mtpa (3.0mtpa leach, 1.2mtpa Cu-Au Con)
  • 2009 Production estimated to be:
  • 147,000 ounces Au & 13,000 tonnes of Cu concentrate (30mlb)
  • 2010 Production estimated to be:
  • 132,000 ounces Au & 9,000 tonnes of Cu concentrate (20mlb)

8

, , ( )

slide-9
SLIDE 9

Varvarinskoye Pits

9

slide-10
SLIDE 10

Varvarinskoye Mining & Processing 4.2Mtpa

  • 2 processes or streams
  • Flotation-concentrate

production (HGC) p ( )

  • 155tph or 1.2mtpa of

sulphide ore sulphide ore Wh l l hi CIP d é

  • Whole-ore leaching – CIP – doré

production (LGC)

  • 385tph or 3.0Mtpa of sulphide and

10

minor amount of oxidized ore

slide-11
SLIDE 11

Karchiga within Rudny Altai Cu VMS Belt

RUSSIAN FEDERATION

Kazzinc/Glencore Smelter

  • Ust-Kamenogorsk

MONGOLIA

KARCHIGA

  • KAZAKHSTAN

Kazakhmys Smelter

  • CHINA
  • Bishkek

11

slide-12
SLIDE 12

Karchiga Highlights

  • 28 Feb 2007 exploration and mining contract granted by Kazakh Gov’t
  • Exploration licence covering 47.3km2
  • 2007 Exploration programme (US$800,000) resulted in NI 43-101 resource

(0.30% Cu cut-off):

  • Indicated + Inferred resource - 8.19Mt @ 2.07% Cu
  • 374Mlb Cu contained
  • Additional exploration targets identified
  • 2008 Exploration programme (~US$3 million) started in June 2008

designed to con ert e isting reso rce and to increase reso rce designed to convert existing resource and to increase resource

  • >9,000m drilling programme
  • IP geophysical & geochemical survey
  • IP geophysical & geochemical survey
  • Micon was contracted to complete the scoping study by end 2008

12

slide-13
SLIDE 13

Karchiga Geology & Licence Area

Zmeinogorsk Karchiga SE Karchiga Zmeinogorsk Mafic intrusive Complex Karchiga SE Geochem Anomaly Karchiga Central South Anitcline Prospect

Slasovoky Fault

Quartz Mica Shist Location of 47 3km2 licence area 13 Location of 47.3km licence area

slide-14
SLIDE 14

Karchiga Cu VMS Deposit

14

slide-15
SLIDE 15

Karchiga NI 43-101 Compliant Resource

Indicated (Sulphide) Inferred (Oxide + Sulphide) Total Indicated + Inferred Cut-off (%) Cu

Tonnes (Mt) Cu (%) Copper (Mlb) Tonnes (Mt) Cu (%) Copper (Mlb) Tonnes (Mt) Cu (%) Copper (Mlb)

15

0.30

5.1 2.32 261 3.09 1.67 113 8.19 2.07 374

slide-16
SLIDE 16

Karchiga Project Timeline

Activity 06 2007 2008 2009

Lero acquired 70% 2007 work programme Geochem, geophysics g y 1,879m drilling Updated Resource JORC Geochem results target gen 2008 work programme Met testwork Scoping study Exploration/resource drill out Measured-indicated resource Measured-indicated resource PFS/DFS

16

slide-17
SLIDE 17

Talas: Part of World’s 4th Largest Porphyry Province

Northern Tien Shan Central Tien Shan Southern Tien Shan

UZBEKISTAN KAZAKHSTAN

  • Taldybulak
  • BISHKEK
  • ALMATY

Taldybulak-Talas (5 Moz) & Barkol Projects

  • Muruntau

(175Moz)

  • Kumtor

(17Moz)

  • y

Levoberezhny (3Moz)

  • Amantaitau
  • Almalyk (93Moz)

TURKMENISTAN CHINA

  • Jilau

(3Moz) (10Moz)

  • Zarmitan

(11Moz)

AFGANISTAN TAJIKISTAN

17

slide-18
SLIDE 18

Talas Licence Area

Orsu Metals Corporation 18 O su eta s Co po at o Talas Licence Area

slide-19
SLIDE 19

Taldybulak Looking West

Taldybulak Devonian Taldybulak Central NI 43 101 Resource Volcanics Access Road Quaternary Sediments Taldybulak East soil anomaly 19

slide-20
SLIDE 20

Taldybulak Still Open To The West

>0.3 g/t Au Block Model

TBDD07-24 332 m @ 0.69 g/t Au and 0.14% Cu

500 W E 500m

COG, Au g/t Mt Au, g/t Au, Moz Cu% Cu, Mlb Au eq, g/t Au eq, Moz

0.3 242 0.6 4.64 0.16 793 1.00 7.53 0.4 176 0.7 3.9 0.16 574 1.1 6.00 0.5 132 0.77 3.28 0.16 428 1.15 4.84

NI 43-101 Indicated & Inferred Resource Au eq = Au + 2.5xCu, %

20

3 d cated & e ed esou ce Au_eq Au 2.5xCu, %

slide-21
SLIDE 21

Possible Analogues

  • Cadia Valley Newcrest Mining Australia

Ridgeway 4Moz

  • Cadia Valley, Newcrest Mining, Australia
  • Geologically similar and just

15 Ma younger than Taldybulak

  • 2007 Production (open pit + u/g)

Cadia Hill 5.3Moz Cadia East 5.9Moz Cadia Far East 15.5Moz

  • 2007 Production (open pit + u/g)
  • 560Koz Au
  • 136Mlb Cu

Cadia Far East 15.5Moz

  • $US260/oz
  • Resource (inclusive reserve)

Resource (inclusive reserve)

  • 1,535Mt @ 0.6 g/t Au and 0.29% Cu
  • 31Moz Au and 10,400Mlb Cu
  • Initial resource of 5 Moz Au in 1980s

21

  • 21
slide-22
SLIDE 22

Talas Project Highlights

  • Exploration alliance with Gold Fields (GF to invest CAD$20 million to earn 70%
  • Exploration alliance with Gold Fields (GF to invest CAD$20 million to earn 70%

in 2 phases)

  • 20Moz Au_eq new internal targeted size of porphyry
  • CAD$7.8 million exploration programme in 2008, including:

$ p p g , g >15,000m drill programme started in end Q2 2008 Extensive DD-IP & PD-IP programme started in Q2 2008

  • Scoping study expected in 2009
  • Improving Tax and Legislative regime in Kyrgyzstan

22

slide-23
SLIDE 23

Talas Project Timeline

Taldybulak Licence Granted

2008 2007 2006 2005 Activity

3,200m confirmation drilling Exploration commenced Taldybulak Licence Granted programme Gold Fields invests C$2.5M @ C$0.50 & C$233,420 @ C$0.50 6,600m diamond drill programme, , p g , 90km of DD-IP surveying programme Inferred Resource Calculation Metallurgical testwork Additional 15 000 17 000 m drilling + Gold Fields JV deadline Additional 15,000-17,000 m drilling + geophysics and geochem 23

slide-24
SLIDE 24

Tokhtazan Project

  • Located in W Kyrgyzstan with rail and
  • Located in W Kyrgyzstan with rail and

power located just 20-30 km away

  • 1995-99 historic exploration by Cameco

d K lt lt d i 1M and Kyrgyzaltyn resulted in 1Moz resource (non-JORC compliant)

  • 2006 programme (trenching + 3 holes)

North South returned 5m @ 6.2g/t Au

  • Immediate exploration potential lies to

the SE of the Tokhtazan South ore body

  • 2,500m

exploration and confirmation drilling programme is underway in 2008

Previous Resources Estimate (Non JORC / NI 43-101 Compliant) Area Cut-off 0.5g/t Au Cut-off 1.0g/t Au Ore (t) Au (g/t) Gold (Oz) Ore (t) Au (g/t) Gold (Oz) Ore (t) Au (g/t) Gold (Oz) Ore (t) Au (g/t) Gold (Oz) South 10,969,000 1.78 626,337 7,718,000 2.21 547,631 North 10,235,000 1.35 444,555 6,229,000 1.97 393,691

24

Total 21,204,000 1.57 1,070,924 13,947,000 2.1 940,358

slide-25
SLIDE 25

JORC Compliant Reserve & Resource

Project Proven & Probable Reserve Measured, Indicated & Inferred Resources Varvarinskoye 2.2 Moz Au 254 Mlb Cu 5.01 Moz Au 607 Mlb Cu Karchiga 374 Mlb Cu Taldybulak 4.7 Moz Au 793 Mlb Cu 793 Mlb Cu TOTAL 2.2 Moz Au 254 Mlb Cu 9.71 Moz Au 1,774 Mlb Cu 3.1 Moz Au_eq , 16.4 Moz Au_eq

Reserve is a subset of Resource Au eq = 2.5Cu + Au

25

Au_eq 2.5Cu Au

slide-26
SLIDE 26

Orsu Metals Corporation

Orsu Metals Corporation TSX : OSU AIM : OSU