no note te all ll imag ages es con ontai ained ned in th
play

NO NOTE: TE: All ll imag ages es con ontai ained ned in th - PowerPoint PPT Presentation

NO NOTE: TE: All ll imag ages es con ontai ained ned in th this presen sentat ation ion ar are conc onceptu eptual al an and intended ed to gu guide e discu scussion sion wi with th th the Commu munity ty Advi visory


  1. NO NOTE: TE: All ll imag ages es con ontai ained ned in th this presen sentat ation ion ar are conc onceptu eptual al an and intended ed to gu guide e discu scussion sion wi with th th the Commu munity ty Advi visory sory Commi mitt ttee. ee. The conc oncepts epts ar are s subject ject to man any c y cons onsider derat ation ions s go goin ing g forw rwar ard, , inclu luding ng detai ailed ed design sign, , cos osti ting ng an and f feas asib ibil ilit ity. At t t their r sec econd ond meet eting, ng, th the ad advi visor sory y comm ommitt ttee ee wa was invi vited ed to revi view ew design refinements that were based on the committee’s previous feedb dback ack on ear arly y draf aft d t design signs s to help lp YVR VR determi rmine e wh what at f feat atures es wi will ll be most t effecti ective e an and m most t suppor orted ed. . YVR VR wi will ll invi vite broad ader r com ommu munit ity y feed edback ack in la late Oct ctob ober er / e / ear arly y No Novem ember ber.

  2. TE TEMPLE MPLETON ARE ON AREA R A REDE EDEVEL VELOPMENT OPMENT Phase 3: Design Input COMMUNITY ADVISORY COMMITTEE MEETING #2 October 2, 2018

  3. Welcome and Agenda

  4. DISCUSSION TOPICS: 1. Review Project Information to Date 15 min 2. Action Items 5 min 3. Design Refinements 30 min 4. Design Renderings 45 min 5. Remediation Works Update 3 min 6. Next Steps 2 min 7. Meeting Outcomes 10 min 8. Airport Noise/Little Wings Update 25 min

  5. 1. Project Information to Date

  6. OUR MANDATE

  7. MASTER PLAN & LAND USE PLAN

  8. HISTORICAL LAND USE PLANS

  9. WHY THIS SITE? • Why this site?

  10. OTHER SITES CONSIDERED

  11. PROJECT NOISE ASSESSMENT

  12. MULTI-USE PATH SHAR ARED WITH PHAS ASE 2 ADVI ADVISOR ORY CO COMMITTEE TEE ME MEETT TTING NG #2 #2

  13. MULTI-USE PATH (PHASE 2 ENGAGEMENT)

  14. CONNECTIVITY – MULTI-USE PATH South Connection North Connection

  15. PLANNING TIMELINE This timeline was shared at the open houses in Phase 2 and has been updated to reflect where we are from that point.

  16. COMMUNITY NEXT STEPS • Continue to provide updates • Additional feedback opportunities in 2018 and 2019 • Refine plans for greenspace, multi-use path, landscaping and amenities • Work with the proponent on noise mitigation and construction management plans • Engage on detailed designs as they are available

  17. 2. Action Items

  18. Ac Acti tion on Item em St Statu atus s YVR to provide a link to consultation results, yvr.ca/engagement/templeton which are available online. YVR to consider additional measures beyond In progress. signs and visual cues to restrict traffic, including separate access for BC Hydro / YVR Sub-Station / Wildlife Operations. YVR to share a copy of the presentation with Complete — sent Sept 20 the Advisory Committee within the next two days. YVR to follow up with TransLink and report Considered. For information back. today.

  19. Acti Ac tion on Item em St Statu atus s YVR to share information about the noise For discussion today. assessment and will the noise report be redone based on the new design. YVR to consider adding a fence along Terrace For discussion today as part of Street to help protect kids and dogs. design refinements. YVR to incorporate a fence into the multi-use For discussion today as part of path design. design refinements.

  20. Ac Acti tion on Item em St Statu atus s YVR will follow up with the Park and Fly We have shared your concerns, administration regarding loudspeaker noise. but recommend that you follow up with them directly. YVR to consider adding an emergency phone Exploring the feasibility. at the proposed social commons area. YVR to consider relocating the social For discussion today as part of commons and the access road entry to allow design refinements. Will result in for more separation from the main Burkeville less greenspace. area.

  21. Ac Acti tion on Item em St Statu atus s Are you really willing to sacrifice the “quality We are committed to working with of life” of your neighbors in Burkeville? the community to ensure the best project possible for all parties. Has YVR requested a Transport Canada NEF are based on aircraft technical review of a Noise Exposure landings, take-offs and flight Forecast (NEF), paths and are not utilized for and/or a Noise Exposure Projection (NEP) evaluating project noise. This with a planning contour? project will not change existing or future NEF. What is the latest research YVR has We utilize the latest guidelines undertaken with Health Canada? and regulations in our planning.

  22. 3. Design Refinements

  23. FOR DISCUSSION • Rationale on multi-use path alignment • Measures to restrict traffic on Templeton Street • Barrier fencing between multi-use path and Burkeville • Location of social commons • Fencing on Terrace Street (will be shared in Design Renderings section)

  24. MEASURES TO RESTRICT TRAFFIC • Direct vehicles accessing the development via Aylmer Road to Terrace Street, removing access to Templeton Street but maintaining possible access for emergency vehicles • Minimize need/desire to travel down Templeton Street after roundabout • Exploring feasibility of gated access St Street et Ends on Terr rrace St Street eet

  25. MEASURES TO RESTRICT TRAFFIC Option 1 New Alignment Option 2 Reuse existing Option 3 New Access Option 4 South Access RA RATI TIONALE ONALE DI DISC SCUSSED USSED IN DE IN DEPT PTH H AT MEE T MEETI TING. NG. DE DECIS ISION ION ON ONPREFE PREFERRE RRED D OP OPTION TION BA BASE SED ON D ON RO ROAD AD ACCES ESS DUE S DUE TO O OP OPERA RATIONAL TIONAL RE REQU QUIRE IREME MENTS NTS . . RECOMMENDED

  26. LOCATION OF COMMONS AREA Overlaps with emergency road connection North of multi-use path • • Reduces redundant road Redundant road surface for emergency access • • Leaves maximum field greenspace Reduces flexible greenspace by 840 m² • • Shape creates a shortcut to Sea Island Station Does not provide a shortcut from south to Sea Island • • Station

  27. BARRIER FENCING AND ACCESS Exi xisting g Entrance Exi xisting g Entrance e (cou (c ould ld be e rem emoved ed) Required ed Entranc nce

  28. BARRIER FENCING AND ACCESS

  29. 4. Design Renderings

  30. CROSS-SECTION

  31. TEMPLETON LOOKING NORTH

  32. SOCIAL COMMONS / TERRACE STREET

  33. SOCIAL COMMONS / TERRACE STREET FIELD FENCING

  34. AYLMER ROAD LOOKING NORTH

  35. WOODLAND MEADOW LOOKING NORTH

  36. WOODLAND MEADOW LOOKING SOUTH SOUTH

  37. MULTI-USE PATH EXAMPLES

  38. 5. Remediation Works Update

  39. 6. Next Steps

  40. NEXT STEPS • Release community update (meeting outcomes) • Continue site remediation work • Prepare for community engagement

  41. NEXT STEPS – SITE DEVELOPMENT 2018: Community engagement, YVR Project Assessment & Approval Process, site remediation work YVR LANDLORD RESPONSIBILITY 2019/2020: Pre-works relocation of buildings, site tidy up, roadwork, site servicing, removing existing buildings, landscaping 2020: Pre-load, construction  approx. +3 years LEASEHOLDER RESPONSIBILITY 2023/2024: Operational

  42. 7. Meeting Outcomes Discussion

  43. Thank you. For Templeton Project updates visit: yvr.ca/engagement/Templeton For construction updates visit: yvr.ca/construction Advisory Panel Questions/Information: Jody_Armstrong@yvr.ca General Questions: community_relations@yvr.ca

  44. NOISE MANAGEMENT

  45. Roles and Responsibilities International Civil Aviation Organization ▪ Transport Canada ▪ NAV CANADA ▪ Airports ▪ Land Use Planning Authorities ▪

  46. Noise Management at YVR

  47. Noise Management Program Noise Monitoring & Flight Tracking 1. Stakeholder Participation 2. Noise Management Plan 3. Community Resources 4.

  48. Noise Monitoring Terminal Network

  49. Stakeholder Participation YVR Aeronautical Noise Management Committee Musquea eam Industry In ry Citizen zens Assoc. Airpor rport t Authority hority PURPO PU POSE: SE: SCOP OPE: E: Airlin ines es City Staff Provides a forum for the To discuss, analyse and discussion and provide advice on, or consideration of all make recommendations aeronautical noise about noise issues at YVR. management. NAV NA Trans nsport port CANA NADA DA Canada

  50. Noise Management Plan Documents noise program and identifies initiatives over a five-year period ▪ New Plan required for 2019-2023 ▪

  51. Run-Up Locations

  52. Noise Exposure Forecast Contours

  53. NEF’s and Municipal Planning

  54. Noise Community Resources

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend