New Orleans Municipal Yacht Harbor 601 Poydras St., Suite 1860 New Orleans, LA, 70130 504-648-3560 Municipal Yacht Harbor: Introduction The MYH was a 600 slip marina located on the south shore of Lake Pontchartrain in New Orleans, Louisiana.


slide-1
SLIDE 1

New Orleans Municipal Yacht Harbor

601 Poydras St., Suite 1860 New Orleans, LA, 70130 504-648-3560

slide-2
SLIDE 2
slide-3
SLIDE 3

Municipal Yacht Harbor: Introduction

The MYH was a 600 slip marina located on the south shore of Lake Pontchartrain in New Orleans, Louisiana. Hurricane Katrina caused severe damage to the MYH docks and associated facilities. Instead of making repairs to the existing facility, the City has determined that the existing dock and mooring infrastructure be demolished and replaced with a floating dock system to provide the greatest resiliency and sustainability. The new harbor system being planned is a concrete floating dock system with wave attenuation designed to accommodate the needs of the regional boating community while meeting ADA access requirements. In addition to replacing the existing docks the project will also establish two new entry points for the marina, rehabilitate the eastern bulkhead and perform maintenance dredging.

slide-4
SLIDE 4

Project Features

  • Remove Existing Docks
  • Install new floating docks
  • Construct West Marina Entry
  • Construct East Marina Entry and Restroom
  • Replace Bulkhead
  • Maintenance Dredging
  • Rehabilitate Pump Out Dock
slide-5
SLIDE 5

Project Features: Remove Existing Docks

slide-6
SLIDE 6

Existing Conditions: Entrances

Parking Lot Entrance West Marina/ Park Entrance

slide-7
SLIDE 7

Existing Conditions: Docks

Docks Pump-out Dock

slide-8
SLIDE 8

Project Features: Floating Docks – Master Plan

slide-9
SLIDE 9

Municipal Yacht Harbor: Master Plan

WEST MARINA | EAST MARINA

slide-10
SLIDE 10

Municipal Yacht Harbor: Master Plan

EAST MARINA | DOCKS

slide-11
SLIDE 11

Municipal Yacht Harbor: Master Plan

slide-12
SLIDE 12

Phase 1: Construction

slide-13
SLIDE 13

Phase 1: Construct West Marina Entry

slide-14
SLIDE 14

West Marina Entry: Existing

slide-15
SLIDE 15

West Marina Entry: Proposed

slide-16
SLIDE 16

Master Plan: West Marina Entry

WEST MARINA | PARK ENTRY

slide-17
SLIDE 17

Master Plan: West Marina Entry

WEST MARINA | PARK ENTRY

slide-18
SLIDE 18

Master Plan: West Marina Entry

OPTION 1 WEST MARINA | PARK ENTRY

slide-19
SLIDE 19

Master Plan: West Marina Entry

OPTION 2 WEST MARINA | PARK ENTRY

slide-20
SLIDE 20

West Marina/Park Entrance

slide-21
SLIDE 21

West Marina / Park Entrance

  • Metal fencing and guard rails are powder coated with a metallic paint

finish – Silver.

  • Site accessories including lighting, benches, trash cans, bike racks and

dumpster fencing are fabricated in metal with a powder coated metallic paint finish – Titanium.

  • MYH Logo is fabricated in aluminum with powder coated paint finish

and polished metal.

slide-22
SLIDE 22

Phase 1: Construct East Marina Entry

slide-23
SLIDE 23

East Marina Entry: Existing

slide-24
SLIDE 24

East Marina Entry: Proposed

slide-25
SLIDE 25

Phase 1: East Marina Entry

EAST MARINA | ENTRY

slide-26
SLIDE 26

East Marina Entrance & Comfort Station

  • Main building is constructed of steel frame construction with galvalume

metal panels and roof supported on galvanized steel metal columns.

  • The ground floor will be covered with a perforated steel panel with a

powder coated metallic paint finish.

  • All fencing, rails and stairs will be metal fabrication with a powder coated

metal paint finish.

slide-27
SLIDE 27

Phase 1: Bulkhead Reconstruction

slide-28
SLIDE 28

Phase 1: Bulkhead Reconstruction

EAST MARINA | ENTRY

slide-29
SLIDE 29

Maintenance Dredging – Master Plan

slide-30
SLIDE 30

Phase 1: Rehabilitate Pump-out Dock

slide-31
SLIDE 31

Schedule & Budget

Project Schedule Project Budget

Professional Services – $2 Million Dollars

  • Includes Architectural Services, Marine Engineering Services, Land Surveys, Hydrographic Surveys,

Bathymetric Surveys, Environmental Testing, Geotechnical Services, Material Testing and Permitting Fees. Construction Services – $22 Million Dollars (includes hard costs and contingencies)

  • New Floating Docks, West Marina Entrance, East Marina Entrance (w/ restroom), Bulkhead Reconstruction

and Maintenance Dredging. 2017 2018 2016

Design & permitting phase Bid phase Construction, East Marina Construction, West Marina

4/30/17 8/10/17 7/12/18

slide-32
SLIDE 32

Questions or comments?