national grid so to legal separation
play

National Grid SO/TO Legal Separation STC Modification Panel 27 - PowerPoint PPT Presentation

National Grid SO/TO Legal Separation STC Modification Panel 27 Sept 2017 Legal Separation Update Code Change Strategy Minimum Changes to GB Codes 1 April 2019 Go Live Proposed GB Code Changes Other Codes Focus on STC


  1. National Grid – SO/TO Legal Separation STC Modification Panel 27 Sept 2017

  2. Legal Separation Update  Code Change Strategy  Minimum Changes to GB Codes  1 April 2019 Go Live  Proposed GB Code Changes  Other Codes  Focus on STC & STCP Changes  Overall Timescales (industry engagement and mod process)  Communications  STO Meetings  Open letter – Sept 2017  STO/OFTO Workshops for drafting of STCPs  Industry Workshop – Nov 2017  Modification Approach 2

  3. Legal Separation Information  Virtual Separation for National Grid from 1 st October 2018 (in the absence of Licence and Code changes)  Live separation 1 st April 2019  GB Code Changes being proposed  NGET changes to NGESO and retention of NGET where relevant;  Consequential changes throughout codes as a result of the above;  Transitional arrangements that need to be in place from 1 st April 2019 with a final solution at a later date;  Consequential changes to associated contracts (e.g TOCAs)  Interface Design changes 3

  4. Code Modifications LSP Code Interface Design Changes Notes/Other Section B – Panel Structure STC NSLPA change may Section C – SCS fall away Section D – SRS Section G - NSLPA STCPs 14 Separate Slide on this CUSC Section 2 (Site Agreements) OC7 – Customer Interface Grid Code with National Grid OC9 - Black Start Section 4 – Panel Structure SQSS BSC, DCode, NGET entity changes (and DCUSA some associated contracts) 4

  5. STCPs to change STCP 1-01 Voltage Management 1-01 Operational Switching 1-01 User (DNO) Interface 1-01 Protection Testing 8-02 Circuit Live Trip and DAR Tests 4-03 Real Time Data 6-01 Black Start 4-05 Operational Telephony 2-01 Alarm & Event Management 6-03 System Incident Management 11-01 Outage Planning 11-02 Plan Build 11-01 / 11-02 Customer Offer Outage Assessment 12-01 Data Exchange Mechanism 19-04 Site Responsibility Schedules NEW - Grid Code Data Flows NEW - Asset Lifecycle Working Groups NEW - Nuclear Site Licence 5

  6. High Level Code Modification Programme High Level Timeline Mod Draft Consultation Reports to Go Active Share 1 st Draft Proposals Authority Ofgem with STOs & submitted to Report to OFTOs Panels Panel Share 2 nd Draft Workgroup Workgroup with STOs & session if session if OFTOs required required Industry Event (all Codes) Industry Industry Engagement – Panel Meetings, Consultations etc as STO Engagement Engagement part of Mod Process 6

  7. Communications  STO Meetings  8/9 Aug 2017 STOs  14 Sept OFTOs  6 Oct STOs and OFTOs (this has been arranged)  Open letter – Sept 2017  STO/OFTO Workshops for drafting of STCPs (Bec Thornton organising these)  Mid Oct 2017  Mid Nov 2017  Industry Workshop – Nov 2017?  Modification Approach 7

  8. Modification Approach  Normal GB code governance arrangements to be used  NGET to prepare initial drafting and share with STOs and OFTOs and later with industry before Modification process commences formally  NGET to submit STC & STCP Modification Proposals to STC Modification Panel February 2018 with the assumption that Workgroups should not be required. 8

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend